- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Vernal, Utah 84078, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for the rehabilitation and reconstruction of approximately 6.67 miles of Taylor Mountain Road located in Uintah County, Utah. The Department of Transportation Federal Highway Administration seeks to rehabilitate 4.95 miles and reconstruct 1.71 miles of the roadway to improve safety and correct roadway geometry issues. Major work elements include widening the road, embankment work, drainage improvements, pavement markings and signage updates. Proposals are due by October 19, 2021 and the agency will evaluate bidders' technical qualifications and ability to complete the project objectives.
There is no set-aside designated for this procurement. Significant quantities of work include 41 acres of clearing and grubbing, 18,000 cubic yards of embankment construction, 19,000 tons of aggregate base, and 5 miles of full depth reclamation. NAICS codes likely to apply are 237110 and 237310, with a primary PSC code of D301. Potential incumbents include local Utah contractors experienced in road construction and maintenance. The pre-solicitation notice does not provide an estimated award value or budget range for the work.
Notice text
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
PROJECT DESCRIPTION: The UT FLAP 2500(1), Taylor Mountain Road project is located approximately 6 miles north of Vernal, UT in northeastern Utah. The project begins at the intersection of 2500 W and 3500 N and continues north for 6.67 miles to just past the Ashley National Forest (USFS) boundary. The existing roadway provides access to businesses, private residences, and the Ashley National Forest. The route is categorized as a rural minor collector in rolling terrain and is maintained by Uintah County. This project consists of the rehabilitation, restoration, and resurfacing (3R) of approximately 4.95 miles and reconstruction (4R) of approximately 1.71 miles of road.
Major work elements include widening the roadway to a consistent width and vertical and horizontal alignment changes to correct roadway geometry and improve safety. Construction will generally include cut slopes (bedrock and soil), embankment, deep patch embankment stabilization, aggregate base course, and paving. Improvements include clearing roadside vegetation, stabilization of shoulders, drainage improvements (including large pipes, deep pipes, and concrete headwalls), pavement markings, and updating signing. Select parking/pullouts and access road intersections will also be rehabilitated or reconstructed.
SIGNIFICANT QUANTITIES (Schedule A):
- 20101-0000 Clearing and Grubbing: 41 ACRE
- 20420-0000 Embankment Construction: 18,000 CUYD
- 30101-0000 Aggregate Base: 19,000 TON
- 30401-5300 Full Depth Reclamation: 5.0 MILE
- 40101-0600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 16,000 TON
MISCELLANEOUS:
Full Road Closures to public traffic will be allowed at the north end reconstruction (4R) segment from March 1 through May 15, and weekday road closures of this segment from May 15 through June 24. Access through the closure to USFS permit holders and local property owners will be required at all times. For all other work, construction-caused delays to public traffic will be limited to a maximum of 30 minutes per passage through the project.
Perform pre-construction nesting bird survey within 7 days before vegetation removal performed prior to August 1.
Due to weather restrictions, on-site construction typically cannot occur until March.
It is anticipated this project will be advertised in October 2021 with construction between March 2022 and October 2022.
Estimated total cost is $6,000,000 to $8,000,000.
Notice history
| Notice | Type | Posted |
|---|---|---|
| UT FLAP 2500(1) Taylor Mountain Road | Award Notice | |
| UT FLAP 2500(1) Taylor Mountain Road | Solicitation | |
| UT FLAP 2500(1) Taylor Mountain Road | Pre-Solicitation | |
| This notice | Pre-Solicitation | |
| UT FLAP 2500(1) Taylor Mountain Road | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| BRCA 310427 Southbound Shuttle Stop | National Office | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities