USCGC munro gas turbine bleed air hose insulation

Closed Special Notice Posted

Solicitation number
70Z8526Q025799
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
336611 Ship Building and Repairing
Place of performance
California 94501, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Coast Guard issued a total small business set-aside special notice on June 26, 2026, to procure removeable insulation covers for the Gas Turbine Bleed Air Hose system aboard USCGC MUNRO (WMSL 755), with a response due date of July 1, 2026. The contract is restricted to small business concerns.

The Main Gas Turbine is non-operational due to oily water saturation of the existing insulation covering GTBA-HOSE-1, the anti-icing bleed air system hose located beneath the Main Gas Turbine Module. Saturated insulation causes smoking when the turbine operates in external temperatures above 40 degrees Fahrenheit. The contractor must manufacture two sets of reusable insulation covers with an inner layer measuring 34 inches by 22 inches by 2 inches thick and an outer layer measuring 45 inches by 28 inches by 2 inches thick. Fabrication must comply with ASTM F683-99, paragraph 8, using glass fiber felt layers rated for temperatures of 450 degrees Fahrenheit and above, with knitted wire mesh or wire-inserted fibrous glass cloth wrapping the interior and ends, and fibrous glass cloth covering the exterior. Covers must be sewn and quilted for uniform thickness, strength, and rigidity. The period of performance runs from July 1, 2026 through July 15, 2026, with delivery required to USCG Base Alameda, 1 Eagle Rd, Alameda, California 94501. The objective is to return USCGC MUNRO to Fully Mission Capable status. The primary point of contact is LTJG Justin Waters, Asset Manager, at 206-827-5766 or justin.l.waters@uscg.mil.

Notice text

2 versions

Update #2 · Latest ·

Mofification 1 to this solicitation was to correct the POP in the attached SOW. 

Correct: period of performance for this contract shall be between 01JUL2026 & 15JUL26.

STATEMENT OF WORK (SOW)

FOR

GAS TURBINE BLEED AIR HOSE INSULATION

CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose.  The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).

1.0  GENERAL

    1. Background 

USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.

    1.  Scope 

The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.

    1. OBJECTIVE

The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander.

    1. APPLICABLE DOCUMENTS
      1. Reference Documents

The following documents may be helpful to the Contractor in performing the work described in this document:

Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)

Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210

  1. SPECIFIC REQUIREMENTS/TASKS

Existing insulation cover dimensions are as follows:

Length

Width

Thickness

Inner Layer

34”

22”

2”

Outer Layer

45”

28”

2”

Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.

3.0  OTHER APPLICABLE CONDITIONS

3.1  Period of Performance 

-

The period of performance for this contract shall be between 01JUL2026 & 15JUL26.

3.2  PLACE OF PERFORMANCE 

The primary place of performance will be at the contractor’s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501

4.0  CONTRACTOR FURNISHED PROPERTY 

The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.

5.0 Points of Contact

USCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil

6.0 Imagery

Outer Lagging                                                 Inner Lagging

        

Update #1 ·

STATEMENT OF WORK (SOW)

FOR

GAS TURBINE BLEED AIR HOSE INSULATION

CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose.  The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).

1.0  GENERAL

    1. Background 

USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.

    1.  Scope 

The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.

    1. OBJECTIVE

The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander.

    1. APPLICABLE DOCUMENTS
      1. Reference Documents

The following documents may be helpful to the Contractor in performing the work described in this document:

Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)

Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210

  1. SPECIFIC REQUIREMENTS/TASKS

Existing insulation cover dimensions are as follows:

Length

Width

Thickness

Inner Layer

34”

22”

2”

Outer Layer

45”

28”

2”

Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.

3.0  OTHER APPLICABLE CONDITIONS

3.1  Period of Performance 

-

The period of performance for this contract shall be between 01JUL2026 & 15JUL26.

3.2  PLACE OF PERFORMANCE 

The primary place of performance will be at the contractor’s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501

4.0  CONTRACTOR FURNISHED PROPERTY 

The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.

5.0 Points of Contact

USCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil

6.0 Imagery

Outer Lagging                                                 Inner Lagging

        

Files

File Type Posted
SOW_Bleed Air Hose Insulation_V2 UPDATED.docx DOCX document
SOW_Bleed Air Hose Insulation_V2 UPDATED.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
Gaskets Curtis Bay, Maryland 21226, United States · NAICS 339991 — No set-aside
CGC kukui electric heaters Sitka, Alaska 99835, United States · NAICS 333414 — Total Small Business
Cylinder assembly NAICS 336611 — Total Small Business
Muffler Exhaust Curtis Bay, Maryland 21226, United States · NAICS 333618 Coast Guard No set-aside
USCGC terrell horne – sewage piping renewal San Pedro, California 90731, United States · NAICS 336611 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors