About this opportunity
The U.S. Coast Guard issued a total small business set-aside special notice on June 26, 2026, to procure removeable insulation covers for the Gas Turbine Bleed Air Hose system aboard USCGC MUNRO (WMSL 755), with a response due date of July 1, 2026. The contract is restricted to small business concerns.
The Main Gas Turbine is non-operational due to oily water saturation of the existing insulation covering GTBA-HOSE-1, the anti-icing bleed air system hose located beneath the Main Gas Turbine Module. Saturated insulation causes smoking when the turbine operates in external temperatures above 40 degrees Fahrenheit. The contractor must manufacture two sets of reusable insulation covers with an inner layer measuring 34 inches by 22 inches by 2 inches thick and an outer layer measuring 45 inches by 28 inches by 2 inches thick. Fabrication must comply with ASTM F683-99, paragraph 8, using glass fiber felt layers rated for temperatures of 450 degrees Fahrenheit and above, with knitted wire mesh or wire-inserted fibrous glass cloth wrapping the interior and ends, and fibrous glass cloth covering the exterior. Covers must be sewn and quilted for uniform thickness, strength, and rigidity. The period of performance runs from July 1, 2026 through July 15, 2026, with delivery required to USCG Base Alameda, 1 Eagle Rd, Alameda, California 94501. The objective is to return USCGC MUNRO to Fully Mission Capable status. The primary point of contact is LTJG Justin Waters, Asset Manager, at 206-827-5766 or justin.l.waters@uscg.mil.
Notice text
2 versions
Update #2 · Latest ·
Mofification 1 to this solicitation was to correct the POP in the attached SOW.
Correct: period of performance for this contract shall be between 01JUL2026 & 15JUL26.
STATEMENT OF WORK (SOW)
FOR
GAS TURBINE BLEED AIR HOSE INSULATION
CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).
1.0 GENERAL
-
- Background
USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.
-
- Scope
The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.
-
- OBJECTIVE
The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander.
-
- APPLICABLE DOCUMENTS
-
-
- Reference Documents
-
The following documents may be helpful to the Contractor in performing the work described in this document:
Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)
Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210
- SPECIFIC REQUIREMENTS/TASKS
Existing insulation cover dimensions are as follows:
Length
Width
Thickness
Inner Layer
34”
22”
2”
Outer Layer
45”
28”
2”
Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.
3.0 OTHER APPLICABLE CONDITIONS
3.1 Period of Performance
-
The period of performance for this contract shall be between 01JUL2026 & 15JUL26.
3.2 PLACE OF PERFORMANCE
The primary place of performance will be at the contractor’s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501
4.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.
5.0 Points of Contact
USCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil
6.0 Imagery
Outer Lagging Inner Lagging
Update #1 ·
STATEMENT OF WORK (SOW)
FOR
GAS TURBINE BLEED AIR HOSE INSULATION
CGC MUNRO has a need to replace insulation covers on the Gas Turbine Bleed Air Hose. The ship’s Main Gas Turbine is currently non-operational and has an immediate need for new insulation materials as outlined in this Statement of Work (SOW).
1.0 GENERAL
-
- Background
USCGC MUNRO inadvertently soaked the insulation surrounding GTBA-HOSE-1 with an oily water. The hose is for the anti-icing bleed air system located underneath the Main Gas Turbine Module. Inundated insulation causes smoking when the Gas Turbine is operated in external temperatures above 40 degrees; preventing operation of the turbine.
-
- Scope
The scope of this contract is defined by the efforts and tools required to support USCGC MUNRO (WMSL 755). The Contractor shall manufacture new removeable insulation covers to the dimensions and specs provided.
-
- OBJECTIVE
The goal is to return CGC MUNRO to Fully Mission Capable (FMC) status. This is a critical need and shall be completed as soon as possible, in order to minimize negative operational impact to MUNRO’s Operational Commander.
-
- APPLICABLE DOCUMENTS
-
-
- Reference Documents
-
The following documents may be helpful to the Contractor in performing the work described in this document:
Coast Guard Drawing (CGDWG) 750-WMSL-508-001, Rev C, JUNE 2009, Piping And Machinery Insulation Schedule And L/M (ASC508001)
Coast Guard Drawing (CGDWG) 750-WMSL-259_023, Rev C, OCTOBER 2014, Bleed Air Piping & Joint Ident (P1 System) Unit 2210
- SPECIFIC REQUIREMENTS/TASKS
Existing insulation cover dimensions are as follows:
Length
Width
Thickness
Inner Layer
34”
22”
2”
Outer Layer
45”
28”
2”
Fabrication of reusable covers shall comply with ASTM F683-99, PARA 8, PAGE 8. For temperature 450 degrees Fahrenheit and over the covers shall be made up of layers of glass fiber felt to make up the required thickness. The inside and ends shall be wrapped with knitted wire mesh or fibrous glass cloth “wire-inserted”. The outside shall be covered with fibrous glass cloth. Covers shall be sewn and quilted with thread to provide a uniform thickness, strength and ridigity.
3.0 OTHER APPLICABLE CONDITIONS
3.1 Period of Performance
-
The period of performance for this contract shall be between 01JUL2026 & 15JUL26.
3.2 PLACE OF PERFORMANCE
The primary place of performance will be at the contractor’s facility. After completion, contractor will deliver to USCG Base Alameda, 1 Eagle Rd, Alameda CA 94501
4.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract.
5.0 Points of Contact
USCG-SFLC-LREPL, Asset Manager: LTJG Justin Waters, 206-827-5766, justin.l.waters@uscg.mil
6.0 Imagery
Outer Lagging Inner Lagging
Files
| File | Type | Posted |
|---|---|---|
| SOW_Bleed Air Hose Insulation_V2 UPDATED.docx | DOCX document | |
| SOW_Bleed Air Hose Insulation_V2 UPDATED.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Gaskets | — | No set-aside | |
| CGC kukui electric heaters | — | Total Small Business | |
| Cylinder assembly | — | Total Small Business | |
| Muffler Exhaust | Coast Guard | No set-aside | |
| USCGC terrell horne – sewage piping renewal | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity