USCG ketchikan various tanks requirment

Closed Solicitation Posted

Solicitation number
BRANDNEWPRODUCTSSHALLBEONLYACCEPTABLEPRODUCT
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

PSC
5430 Storage Tanks
Place of performance
Ketchikan, Alaska 99901, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Coast Guard is soliciting bids for the procurement of three separate fuel storage tank systems for its Ketchikan, Alaska facility. The solicitation requires contractors to supply brand new fuel tanks and associated equipment, including a 1,100-gallon double wall UL-142 skid tank, a 1,500-gallon dual-dispensing FIREGUARD tank configured for both diesel and gasoline storage, and a 1,500-gallon UL-142 diesel-water saddle tank. All quotes must be submitted on a firm, fixed-price basis with FOB Destination pricing to Ketchikan, Alaska, meaning contractors must include all shipping and delivery costs in their bids. The contract will be awarded to the lowest priced technically acceptable and qualified contractor, contingent upon Coast Guard funding availability. The proposal submission deadline is March 18, 2026, with the solicitation having been posted on February 11, 2026. No information regarding question submission deadlines or anticipated award dates has been specified in the available documentation.

This is a Total Small Business set-aside contract, restricting eligibility to certified small businesses meeting applicable size standards. No incumbent contractor or current contract holder is identified in the solicitation documents. The specific award value or budget range for the contract is not disclosed in the solicitation notice. The three fuel tank systems represent distinct line items (CLINs 0001, 0002, and 0003) with detailed specifications for components including pumps, meters, hoses, venting equipment, and leak detection systems. All equipment must be delivered to the United States Coast Guard at 1300 Steman Street, Ketchikan, Alaska 99901, and tank appurtenances may be shipped loose for field assembly rather than requiring factory mounting. Payment will be made electronically within Net 30 days upon submission of invoices and completed DD-250 forms to the USCG Finance Center using the specified Invoice Routing Code SILC PCB-2.

Notice text

2 versions

Update #2 · Latest ·

SPECIFICATIONS FOR USCG KETCHIKAN :

STORAGE FUEL TANKS , SEE ATTACHED SCOPES OF WORK AND SPECIFICATIONS

*BRAND NEW PRODUCTS SHALL BE ONLY ACCEPTABLE PRODUCT

****see additonal information here:  ADDED 13FEB2026-SFCO-STAMOS

  1. equal (and local) manufacturers are acceptable, correct????

    1. YES
  2. the tank appurtenances must be factory mounted, or can it be shipped lose for field assembly??
    1. It can be shipped loose for field assembly
Update #1 ·

SPECIFICATIONS FOR USCG KETCHIKAN :

STORAGE FUEL TANKS , SEE ATTACHED SCOPES OF WORK AND SPECIFICATIONS

*BRAND NEW PRODUCTS SHALL BE ONLY ACCEPTABLE PRODUCT

Files

File Type Posted
MASTER RFP Q FOR POSTING NEW RQMTS.docx DOCX document
1100 REQUIREMENTSrequirement1.docx DOCX document
DUALDISPENSINGTANKrequirement.docx DOCX document
1500 REQUIREMENTS2.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
USCGC dolphin fuel tank cleaning Mobile, Alabama 36615, United States · NAICS 336611 — Total Small Business
STA Sand Key Repair Fuel Lines and Tank Clearwater Beach, Florida 33767, United States · NAICS 237120 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors