USAID/South Sudan Juba Compound Wastewater Treatment Plant Installation (Juba WWTP) Project
Closed Solicitation Posted
- Solicitation number
- 72066822R00002
- Agency
-
US Mission in South Sudan
Overseas Missions, US Agency for International Development
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 221320 Sewage Treatment Facilities
- PSC
- 4630 Sewage Treatment Equipment
- Place of performance
- Juba South Sudan
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals to design and install two Membrane Aerated Biofilm Reactors to treat wastewater at the US Embassy residential and embassy compounds in Juba, South Sudan under a two-phase design-build acquisition method. The US Agency for International Development Mission in South Sudan will evaluate Phase One proposals in accordance with FAR 36.303-1 and Phase Two proposals in accordance with FAR 36.303-2 to award a firm-fixed-price contract between $500,000 and $1,500,000 to a single offeror. Phase One proposals are due by May 6, 2022 to provide wastewater treatment designs meeting EPA effluent limits of 30 mg/L BOD and TSS with 10 mg/L total nitrogen and 80% phosphorus removal.
This opportunity contains no set-aside designations. Offerors must provide fully operational wastewater treatment plants within 270 calendar days of the notice to proceed in Juba, South Sudan while minimizing disruptions to compound residents. The solicitation estimates treating up to 60,000 gallons of domestic sewage per day and amendments clarify equalization and sludge tank sizing requirements.
Notice text
Dear Prospective Offerors:
The United States Government, represented by the U.S. Agency for International Development Mission in South Sudan (USAID/South Sudan), is seeking Phase One proposals from qualified organizations interested in providing the services for the design and install two (2) Membrane Aerated Biofilm Reactors (MABRs) at the US Embassy Juba Residential and Embassy Compounds. This acquisition for construction is being procured in accordance with Federal Acquisition Regulation Subpart 36.3 -- Two-Phase Design-Build Selection Procedures.
● Phase One will be evaluated in accordance with FAR 36.303-1 -- Phase One.
● Phase Two will be evaluated in accordance with FAR 36.303-2 -- Phase Two.
USAID/South Sudan anticipates awarding one firm-fixed-price contract. For Phase Two, the U.S. Government may award this contract without discussions. The order of magnitude of the resultant contract is between $500,000 and $1,500,000. All work must be completed no later than 270 days after Notice to Proceed (NTP).
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Waste Water Treatment Plant Services | Air Forces Europe and Africa | No set-aside | |
| Design-Bid-Build - Rough River Lake Axtel Wastewater Treatment Plant (WWTP) | ENDIST Louisville | No set-aside |