USACE SPK Design Build Construction - AFTC Munitions Storage Magazines - Hill AFB, UT
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9123822R0016
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Hill AFB, Utah 84056, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation is seeking design-build construction services to build seven earth-covered reinforced concrete munitions storage magazines at Hill Air Force Base in Utah for the Air Force Training Center. The soliciting agency is the Department of the Army Corps of Engineers Sacramento District. The scope of work includes demolishing existing facilities, constructing magazines measuring 26 feet by 80 feet capable of storing 500,000 pounds of munitions each, access roads, utilities, and associated infrastructure. Proposals will be evaluated based on technical qualifications, past performance, and price. The deadline for responses is August 31, 2022.
This opportunity is set aside for total small business and has a place of performance of Hill AFB, Utah. The estimated value for construction ranges from $10-25 million. The NAICS code is 237990 and PSC code is S206. The period of performance is 1,036 days. Seven magazines must be built to store 500,000 pounds of munitions each. Demolition of 1,350 square meters of existing facilities is also required. Proposals are due by August 31, 2022 to the Department of the Army Corps of Engineers Sacramento District.
Notice text
7 versions
Update #7 · Latest ·
United States Army Corps of Engineers (USACE), Sacramento District (SPK) requires Design-Build (DB) construction services to build seven (7) earth covered reinforced concrete Munitions Storage Magazines (MSMs) also referred to as igloos, measuring 26 feet x 80 feet each, capable of storing 500,000 pounds of Class 1.1 munitions each. Work is anticipated to include demolition of 1,350 Square Meters (SM) in obsolete facilities to clear the site for the new igloos, as well as construction of access roads, reinforced concrete aprons, utilities, site improvements, communication support, and all other necessary support for the Air Force Training Center (AFTC) at - Hill Air Force Base (HAFB), Utah (UT). Facilities must be designed as permanent construction in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 1-200-01. Sustainable principles, to include life cycle cost-effective practices, must be incorporated into the design, development, and construction of this project in accordance with UFC 1-200-02. This project must comply with DoD Antiterrorism Force Protection (AT/FP) requirements per UFC 4-010-01. Facility must meet DoD Explosive Safety Board (DDESB) requirements in design and construction. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(i), the magnitude of construction is estimated to be between $10,000,000 and $25,000,000.BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
- - - - Solicitation Amendment 0001 is issued to incorporate two attachments, update the proposal due date, and the solicitation Sections 00 10 00 and 00 22 00. - - - - Solicitation Amendment 0002 is issued to update attachments, extend the period of performance and proposal due date, and update solicitation sections 00 10 00 and 00 73 00. Amendment attachments posted to PIEE. - - - - Solicitation Amendment 0003 is issued to update specifications sections 01 10 10, 01 33 16, 01 50 00 and 01 57 19. Amendment attachments are posted to PIEE. - - - - Solicitation Amendment 0004 is issued to extend the proposal due date. - - - - *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0016' to obtain more details.*
Update #6 ·
United States Army Corps of Engineers (USACE), Sacramento District (SPK) requires Design-Build (DB) construction services to build seven (7) earth covered reinforced concrete Munitions Storage Magazines (MSMs) also referred to as igloos, measuring 26 feet x 80 feet each, capable of storing 500,000 pounds of Class 1.1 munitions each. Work is anticipated to include demolition of 1,350 Square Meters (SM) in obsolete facilities to clear the site for the new igloos, as well as construction of access roads, reinforced concrete aprons, utilities, site improvements, communication support, and all other necessary support for the Air Force Training Center (AFTC) at - Hill Air Force Base (HAFB), Utah (UT). Facilities must be designed as permanent construction in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 1-200-01. Sustainable principles, to include life cycle cost-effective practices, must be incorporated into the design, development, and construction of this project in accordance with UFC 1-200-02. This project must comply with DoD Antiterrorism Force Protection (AT/FP) requirements per UFC 4-010-01. Facility must meet DoD Explosive Safety Board (DDESB) requirements in design and construction. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(i), the magnitude of construction is estimated to be between $10,000,000 and $25,000,000.BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
- - - - Solicitation Amendment 0001 is issued to incorporate two attachments, update the proposal due date, and the solicitation Sections 00 10 00 and 00 22 00. - - - - Solicitation Amendment 0002 is issued to update attachments, extend the period of performance and proposal due date, and update solicitation sections 00 10 00 and 00 73 00. Amendment attachments posted to PIEE. - - - - Solicitation Amendment 0003 is issued to update specifications sections 01 10 10, 01 33 16, 01 50 00 and 01 57 19. Amendment attachments are posted to PIEE. - - - - *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0016' to obtain more details.*
Update #5 ·
United States Army Corps of Engineers (USACE), Sacramento District (SPK) requires Design-Build (DB) construction services to build seven (7) earth covered reinforced concrete Munitions Storage Magazines (MSMs) also referred to as igloos, measuring 26 feet x 80 feet each, capable of storing 500,000 pounds of Class 1.1 munitions each. Work is anticipated to include demolition of 1,350 Square Meters (SM) in obsolete facilities to clear the site for the new igloos, as well as construction of access roads, reinforced concrete aprons, utilities, site improvements, communication support, and all other necessary support for the Air Force Training Center (AFTC) at - Hill Air Force Base (HAFB), Utah (UT). Facilities must be designed as permanent construction in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 1-200-01. Sustainable principles, to include life cycle cost-effective practices, must be incorporated into the design, development, and construction of this project in accordance with UFC 1-200-02. This project must comply with DoD Antiterrorism Force Protection (AT/FP) requirements per UFC 4-010-01. Facility must meet DoD Explosive Safety Board (DDESB) requirements in design and construction. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(i), the magnitude of construction is estimated to be between $10,000,000 and $25,000,000.BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
- - - - Solicitation Amendment 0001 is issued to incorporate two attachments, update the proposal due date, and the solicitation Sections 00 10 00 and 00 22 00. - - - - Solicitation Amendment 0002 is issued to update attachments, extend the period of performance and proposal due date, and update solicitation sections 00 10 00 and 00 73 00. Amendment attachments will be posted to PIEE at a later date. - - - - *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0016' to obtain more details.*
Update #4 ·
United States Army Corps of Engineers (USACE), Sacramento District (SPK) requires Design-Build (DB) construction services to build seven (7) earth covered reinforced concrete Munitions Storage Magazines (MSMs) also referred to as igloos, measuring 26 feet x 80 feet each, capable of storing 500,000 pounds of Class 1.1 munitions each. Work is anticipated to include demolition of 1,350 Square Meters (SM) in obsolete facilities to clear the site for the new igloos, as well as construction of access roads, reinforced concrete aprons, utilities, site improvements, communication support, and all other necessary support for the Air Force Training Center (AFTC) at - Hill Air Force Base (HAFB), Utah (UT). Facilities must be designed as permanent construction in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 1-200-01. Sustainable principles, to include life cycle cost-effective practices, must be incorporated into the design, development, and construction of this project in accordance with UFC 1-200-02. This project must comply with DoD Antiterrorism Force Protection (AT/FP) requirements per UFC 4-010-01. Facility must meet DoD Explosive Safety Board (DDESB) requirements in design and construction. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(i), the magnitude of construction is estimated to be between $10,000,000 and $25,000,000.BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
- - - - Solicitation Amendment 0001 is issued to incorporate two attachments, update the proposal due date, and the solicitation Sections 00 10 00 and 00 22 00. - - - - *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0016' to obtain more details.*
Update #3 ·
United States Army Corps of Engineers (USACE), Sacramento District (SPK) requires Design-Build (DB) construction services to build seven (7) earth covered reinforced concrete Munitions Storage Magazines (MSMs) also referred to as igloos, measuring 26 feet x 80 feet each, capable of storing 500,000 pounds of Class 1.1 munitions each. Work is anticipated to include demolition of 1,350 Square Meters (SM) in obsolete facilities to clear the site for the new igloos, as well as construction of access roads, reinforced concrete aprons, utilities, site improvements, communication support, and all other necessary support for the Air Force Training Center (AFTC) at - Hill Air Force Base (HAFB), Utah (UT). Facilities must be designed as permanent construction in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 1-200-01. Sustainable principles, to include life cycle cost-effective practices, must be incorporated into the design, development, and construction of this project in accordance with UFC 1-200-02. This project must comply with DoD Antiterrorism Force Protection (AT/FP) requirements per UFC 4-010-01. Facility must meet DoD Explosive Safety Board (DDESB) requirements in design and construction. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(i), the magnitude of construction is estimated to be between $10,000,000 and $25,000,000.BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. - - - - Solicitation Amendment 0001 is issued to incorporate two attachments, update the proposal due date, and the solicitation Sections 00 10 00 and 00 22 00. - - - - *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0016' to obtain more details.*
Update #2 ·
The scope of this project for Design-Build (DB) construction services to build seven (7) earth covered reinforced concrete Munitions Storage Magazines (MSMs) also referred to as igloos, measuring 26 feet x 80 feet each, capable of storing 500,000 pounds of Class 1.1 munitions each. Work is anticipated to include demolition of 1,350 Square Meters (SM) in obsolete facilities to clear the site for the new igloos, as well as construction of access roads, reinforced concrete aprons, utilities, site improvements, communication support, and all other necessary support for the Air Force Training Center (AFTC) at - Hill Air Force Base (HAFB), Utah (UT).
Facilities must be designed as permanent construction in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 1-200-01. Sustainable principles, to include life cycle cost-effective practices, must be incorporated into the design, development, and construction of this project in accordance with UFC 1-200-02. This project must comply with DoD Antiterrorism Force Protection (AT/FP) requirements per UFC 4-010-01. Facility must meet DoD Explosive Safety Board (DDESB) requirements in design and construction.
In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(i), the magnitude of construction is estimated to be between $10,000,000 and $25,000,000.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0016' to obtain more details.*
Update #1 ·
The scope of this project for Design-Build (DB) construction services to build seven (7) earth covered reinforced concrete Munitions Storage Magazines (MSMs) also referred to as igloos, measuring 26 feet x 80 feet each, capable of storing 500,000 pounds of Class 1.1 munitions each. Work is anticipated to include demolition of 1,350 Square Meters (SM) in obsolete facilities to clear the site for the new igloos, as well as construction of access roads, reinforced concrete aprons, utilities, site improvements, communication support, and all other necessary support for the Air Force Training Center (AFTC) at - Hill Air Force Base (HAFB), Utah (UT). Facilities must be designed as permanent construction in accordance with the Department of Defense (DoD) Unified Facilities Criteria (UFC) 1-200-01. Sustainable principles, to include life cycle cost-effective practices, must be incorporated into the design, development, and construction of this project in accordance with UFC 1-200-02. This project must comply with DoD Antiterrorism Force Protection (AT/FP) requirements per UFC 4-010-01. Facility must meet DoD Explosive Safety Board (DDESB) requirements in design and construction. In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(i), the magnitude of construction is estimated to be between $10,000,000 and $25,000,000.BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0016' to obtain more details.*
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| USACE SPK Design Build Construction - AFTC Munitions Storage Magazines - Hill AFB, UT | Award Notice | |
| This notice | Solicitation | |
| USACE SPK Design Build Construction - AFTC Munitions Storage Magazines - Hill AFB, UT | Pre-Solicitation | |
| HAFB Munitions Storage Igloos | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| HAFB Multiple Award Construction Contract V (MACC V) | Air Force Sustainment Center | Total Small Business | |
| F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah | ENDIST Sacramento | No set-aside | |
| SABER V Hill AFB | Air Force Sustainment Center | Competitive 8(a) | |
| PKA Relocatable Facility | Global Strike Command | Total Small Business | |
| Munitions Maintenance and Inspection Facility and Conventional Munitions Cube Storage Addition, HIANG, JBPHH, HI | Army National Guard | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity