USACE SPK DB Construction ? East 388th Apron Repair, Hill AFB, UT.
Closed Solicitation Posted
This opportunity was awarded. See its 2 award notices in the notice history.
- Solicitation number
- W9123823R0030
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the Department of the Army Corps of Engineers Engineering District Sacramento seeks design-build construction services for replacement of approximately 735,000 square feet of existing Portland Cement Concrete pavement along with full rework of structural base materials at East 388th Apron at Hill Air Force Base in Utah. The work includes addition of an aggregate base course with stabilized drainage layer and geotextile fabric to address seasonal frost conditions, replacement of existing shoulder asphalt, demolition of 52 sunshades and concrete slabs, and removal of underground asbestos piping. Proposals are due by May 30th and the contract will be set aside for total small business concerns.
The opportunity is set aside for total small business concerns under NAICS codes 237990 and 237310. The work includes demolition, concrete and asphalt pavement repair, and asbestos abatement with a place of performance at Hill Air Force Base in Utah. The solicitation does not provide budget details but the scale of the project involving over 735,000 square feet of pavement repair suggests an award value in the millions of dollars. Current incumbents were not named but the work must be completed to address the needs of the Air Force base.
Notice text
4 versions
Update #4 · Latest ·
USACE SPK 2 Phase DB Construction ? East 388th Apron Repair, Hill AFB, UT. Replacement of approximately 735,000 square feet of existing Portland Cement Concrete (PCC) pavement, along with full rework of structural base materials to include the addition of an aggregate base course with stabilized drainage layer and geotextile filter fabric, as required for seasonal frost conditions. Replace existing shoulder asphalt pavement, along with rework of the shoulder base course, provide anchored tie-downs and pavement markings on the new pavements, removal of underground asbestos piping, and installation and/or removal of crew shacks. Demolition includes removal of 52 existing sunshades, PCC apron slabs, and asphalt shoulders. Any asbestos/LBP removal shall be accomplished by a certified asbestos/LBP removal contractor. 0002 -The purpose of this amendment is to: 1. From : NAICS code 238110 - Poured Concrete Foundation and Structure Contractors To NAICS 237310 - Highway, Street, and Bridge Construction 2. Update FAR Clause 52.204-8 Annual Representations and Certifications. 0003 -The purpose of this amendment is to1. Change Section 00 22 00, Phase One Evaluation Factors, paragraph C. FACTORS TO BE EVALUATED, Tab 2 of the Technical Proposal:Factor 1 - Past Performance, paragraph viii - Formatting and other restrictions:From Example projects are limited to four (4) 8.5 x 11 PDF pages each and a maximum of 12PDF pages total, for all projectsTo Example projects are limited to four (4) 8.5 x 11 PDF pages each and a maximum of 24 PDF pages total, for all projects.2. Change the number of example project an offeror may submit under tab 2 from three (3) to six (6)
Update #3 ·
USACE SPK 2 Phase DB Construction ? East 388th Apron Repair, Hill AFB, UT. Replacement of approximately 735,000 square feet of existing Portland Cement Concrete (PCC) pavement, along with full rework of structural base materials to include the addition of an aggregate base course with stabilized drainage layer and geotextile filter fabric, as required for seasonal frost conditions. Replace existing shoulder asphalt pavement, along with rework of the shoulder base course, provide anchored tie-downs and pavement markings on the new pavements, removal of underground asbestos piping, and installation and/or removal of crew shacks. Demolition includes removal of 52 existing sunshades, PCC apron slabs, and asphalt shoulders. Any asbestos/LBP removal shall be accomplished by a certified asbestos/LBP removal contractor. 0002 The purpose of this amendment is to: 1. From : NAICS code 238110 - Poured Concrete Foundation and Structure Contractors To NAICS 237310 - Highway, Street, and Bridge Construction 2. Update FAR Clause 52.204-8 Annual Representations and Certifications.
Update #2 ·
USACE SPK 2 Phase DB Construction ? East 388th Apron Repair, Hill AFB, UT. Replacement of approximately 735,000 square feet of existing Portland Cement Concrete (PCC) pavement, along with full rework of structural base materials to include the addition of an aggregate base course with stabilized drainage layer and geotextile filter fabric, as required for seasonal frost conditions. Replace existing shoulder asphalt pavement, along with rework of the shoulder base course, provide anchored tie-downs and pavement markings on the new pavements, removal of underground asbestos piping, and installation and/or removal of crew shacks. Demolition includes removal of 52 existing sunshades, PCC apron slabs, and asphalt shoulders. Any asbestos/LBP removal shall be accomplished by a certified asbestos/LBP removal contractor. 1The purpose of this amendment is to: Change Section 00 22 00, Phase One Evaluation Factors, paragraph C. FACTORS TO BE EVALUATED, Tab 2 of the Technical Proposal: Factor 1 - Past Performance, paragraph viii - Formatting and other restrictions: From Example projects are limited to four (4) 8.5 x 11 PDF pages each and a maximum of 24PDF pages total, for all projects To Example projects are limited to four (4) 8.5 x 11 PDF pages each and a maximum of 12PDF pages total, for all projects.
Update #1 ·
USACE SPK 2 Phase DB Construction ? East 388th Apron Repair, Hill AFB, UT. Replacement of approximately 735,000 square feet of existing Portland Cement Concrete (PCC) pavement, along with full rework of structural base materials to include the addition of an aggregate base course with stabilized drainage layer and geotextile filter fabric, as required for seasonal frost conditions. Replace existing shoulder asphalt pavement, along with rework of the shoulder base course, provide anchored tie-downs and pavement markings on the new pavements, removal of underground asbestos piping, and installation and/or removal of crew shacks. Demolition includes removal of 52 existing sunshades, PCC apron slabs, and asphalt shoulders. Any asbestos/LBP removal shall be accomplished by a certified asbestos/LBP removal contractor.
Notice history
| Notice | Type | Posted |
|---|---|---|
| East 388th Apron Repair | Award Notice | |
| USACE SPK DB Construction East 388th Apron Repair, Hill AFB, UT. | Award Notice | |
| This notice | Solicitation | |
| USACE SPK Design Bid Build (DBB) Construction – East 388th Apron Repairs – Hill Air Force Base (AFB), Utah | Pre-Solicitation | |
| USACE SPK Design Bid Build (DBB) Construction – East 388th Apron Repairs – Hill Air Force Base (AFB), Utah | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah | ENDIST Sacramento | No set-aside | |
| HAFB Multiple Award Construction Contract V (MACC V) | Air Force Sustainment Center | Total Small Business | |
| Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance | MICC Fort Hood | Competitive 8(a) | |
| SABER V Hill AFB | Air Force Sustainment Center | Competitive 8(a) | |
| WWYK260004 - repair structural integrity, B1134, post 34 & north wall | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity