Upstream embankment RIP-RAP extension, mosquito creek DAM, cortland, trumbull county, ohio
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911WN22B8005
- Agency
-
ENDIST Pittsburgh
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KA Maintenance Of Dams
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation from the U.S. Army Corps of Engineers, Pittsburgh District seeks bids to extend the upstream riprap on the embankment of Mosquito Creek Dam in Cortland, Ohio. The base contract will remove approximately 3 feet of soil from the main portion of the upstream embankment and place a 3-foot thick layer of R-6 stone riprap. There are also optional line items to perform similar work in other embankment areas. Requirements include erosion and sediment controls, instrumentation protection, excavation and disposal, riprap placement, earthwork, limited demolition, traffic controls, and guiderail and stair removal and replacement. The bid due date is July 26, 2022.
This is a 100% small business set-aside with a NAICS code of 237990 and size standard of $39.5 million. The estimated value ranges from $1-5 million. The period of performance is one year from notice to proceed. The apparent low bidder is Aspen Construction Company at $1,605,065.20. The place of performance is the dam located in Cortland, Ohio.
Notice text
5 versions
Update #5 · Latest ·
UPSTREAM EMBANKMENT RIP-RAP EXTENSION, MOSQUITO CREEK DAM, CORTLAND, TRUMBULL COUNTY, OHIOThe U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves extending the upstream riprap from the current top of riprap elevation up the embankment to the crest at Mosquito Creek Dam, Cortland, Trumbull County Ohio. The work is to be performed from the areas adjacent to the upstream embankment, which may be accessed from Ohio Rt. 305 or the Recreational Area. The work will be performed in the dry. The solicitation will be structured in a base contract and awardable options. The base contract generally includes the removal of approximately 3 foot of soil and then placing a 3 foot thick layer of R-6 stone riprap along the main portion of the upstream dam embankment. Additionally, a temporary laydown area for the project is available to the Contractor at the project site. The contract includes options which include excavating approximately 3 foot of embankment soil and placing 3 feet of riprap material at other locations on other areas of the upstream dam embankment. The major features of the requirements are identified below:T he contract specifically includes: a.Erosion and sediment controls consistent with the magnitude and scope of projects involving work on an earthen embankment dam. b.Installation of instrumentation protection. c.Excavation and disposal of excavated materials. d.Placement of stone riprap materials. e.General earthwork including excavation and slope grading. f.Limited mechanical demolition of concrete rubble and large diameter rock to facilitate construction. g.Traffic controls along public roads, as needed. h.Removal and replacement of guiderail. i.Removal, storage and reinstallation of metal stairs for recreation use. Excavated soils must be disposed of at a commercially available and permitted facility licensed to accept the material. Concrete rubble, riprap and other construction waste material must also be disposed of at a commercially available and permitted facility licensed to accept the waste or recycled, if applicable.AMENDMENT 0001. AMENDMENT 0002 *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN22B8005' to obtain more details.*
BID OPENING HELD.
Update #4 ·
UPSTREAM EMBANKMENT RIP-RAP EXTENSION, MOSQUITO CREEK DAM, CORTLAND, TRUMBULL COUNTY, OHIOThe U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves extending the upstream riprap from the current top of riprap elevation up the embankment to the crest at Mosquito Creek Dam, Cortland, Trumbull County Ohio. The work is to be performed from the areas adjacent to the upstream embankment, which may be accessed from Ohio Rt. 305 or the Recreational Area. The work will be performed in the dry. The solicitation will be structured in a base contract and awardable options. The base contract generally includes the removal of approximately 3 foot of soil and then placing a 3 foot thick layer of R-6 stone riprap along the main portion of the upstream dam embankment. Additionally, a temporary laydown area for the project is available to the Contractor at the project site. The contract includes options which include excavating approximately 3 foot of embankment soil and placing 3 feet of riprap material at other locations on other areas of the upstream dam embankment. The major features of the requirements are identified below:T he contract specifically includes: a.Erosion and sediment controls consistent with the magnitude and scope of projects involving work on an earthen embankment dam. b.Installation of instrumentation protection. c.Excavation and disposal of excavated materials. d.Placement of stone riprap materials. e.General earthwork including excavation and slope grading. f.Limited mechanical demolition of concrete rubble and large diameter rock to facilitate construction. g.Traffic controls along public roads, as needed. h.Removal and replacement of guiderail. i.Removal, storage and reinstallation of metal stairs for recreation use. Excavated soils must be disposed of at a commercially available and permitted facility licensed to accept the material. Concrete rubble, riprap and other construction waste material must also be disposed of at a commercially available and permitted facility licensed to accept the waste or recycled, if applicable.AMENDMENT 0001. AMENDMENT 0002 *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN22B8005' to obtain more details.*
Update #3 ·
UPSTREAM EMBANKMENT RIP-RAP EXTENSION, MOSQUITO CREEK DAM, CORTLAND, TRUMBULL COUNTY, OHIOThe U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves extending the upstream riprap from the current top of riprap elevation up the embankment to the crest at Mosquito Creek Dam, Cortland, Trumbull County Ohio. The work is to be performed from the areas adjacent to the upstream embankment, which may be accessed from Ohio Rt. 305 or the Recreational Area. The work will be performed in the dry. The solicitation will be structured in a base contract and awardable options. The base contract generally includes the removal of approximately 3 foot of soil and then placing a 3 foot thick layer of R-6 stone riprap along the main portion of the upstream dam embankment. Additionally, a temporary laydown area for the project is available to the Contractor at the project site. The contract includes options which include excavating approximately 3 foot of embankment soil and placing 3 feet of riprap material at other locations on other areas of the upstream dam embankment. The major features of the requirements are identified below:T he contract specifically includes: a.Erosion and sediment controls consistent with the magnitude and scope of projects involving work on an earthen embankment dam. b.Installation of instrumentation protection. c.Excavation and disposal of excavated materials. d.Placement of stone riprap materials. e.General earthwork including excavation and slope grading. f.Limited mechanical demolition of concrete rubble and large diameter rock to facilitate construction. g.Traffic controls along public roads, as needed. h.Removal and replacement of guiderail. i.Removal, storage and reinstallation of metal stairs for recreation use. Excavated soils must be disposed of at a commercially available and permitted facility licensed to accept the material. Concrete rubble, riprap and other construction waste material must also be disposed of at a commercially available and permitted facility licensed to accept the waste or recycled, if applicable.AMENDMENT 0001. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN22B8005' to obtain more details.*
Update #2 ·
UPSTREAM EMBANKMENT RIP-RAP EXTENSION, MOSQUITO CREEK DAM, CORTLAND, TRUMBULL COUNTY, OHIOThe U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves extending the upstream riprap from the current top of riprap elevation up the embankment to the crest at Mosquito Creek Dam, Cortland, Trumbull County Ohio. The work is to be performed from the areas adjacent to the upstream embankment, which may be accessed from Ohio Rt. 305 or the Recreational Area. The work will be performed in the dry. The solicitation will be structured in a base contract and awardable options. The base contract generally includes the removal of approximately 3 foot of soil and then placing a 3 foot thick layer of R-6 stone riprap along the main portion of the upstream dam embankment. Additionally, a temporary laydown area for the project is available to the Contractor at the project site. The contract includes options which include excavating approximately 3 foot of embankment soil and placing 3 feet of riprap material at other locations on other areas of the upstream dam embankment. The major features of the requirements are identified below:The contract specifically includes:a.Erosion and sediment controls consistent with the magnitude and scope of projects involving work on an earthen embankment dam.b.Installation of instrumentation protection.c.Excavation and disposal of excavated materials.d.Placement of stone riprap materials.e.General earthwork including excavation and slope grading.f.Limited mechanical demolition of concrete rubble and large diameter rock to facilitate construction.g.Traffic controls along public roads, as needed.h.Removal and replacement of guiderail.i.Removal, storage and reinstallation of metal stairs for recreation use.Excavated soils must be disposed of at a commercially available and permitted facility licensed to accept the material. Concrete rubble, riprap and other construction waste material must also be disposed of at a commercially available and permitted facility licensed to accept the waste or recycled, if applicable. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN22B8005' to obtain more details.*
SITE VISIT DOCUMENTS ADDED
Update #1 ·
UPSTREAM EMBANKMENT RIP-RAP EXTENSION, MOSQUITO CREEK DAM, CORTLAND, TRUMBULL COUNTY, OHIOThe U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves extending the upstream riprap from the current top of riprap elevation up the embankment to the crest at Mosquito Creek Dam, Cortland, Trumbull County Ohio. The work is to be performed from the areas adjacent to the upstream embankment, which may be accessed from Ohio Rt. 305 or the Recreational Area. The work will be performed in the dry. The solicitation will be structured in a base contract and awardable options. The base contract generally includes the removal of approximately 3 foot of soil and then placing a 3 foot thick layer of R-6 stone riprap along the main portion of the upstream dam embankment. Additionally, a temporary laydown area for the project is available to the Contractor at the project site. The contract includes options which include excavating approximately 3 foot of embankment soil and placing 3 feet of riprap material at other locations on other areas of the upstream dam embankment. The major features of the requirements are identified below:The contract specifically includes:a.Erosion and sediment controls consistent with the magnitude and scope of projects involving work on an earthen embankment dam.b.Installation of instrumentation protection.c.Excavation and disposal of excavated materials.d.Placement of stone riprap materials.e.General earthwork including excavation and slope grading.f.Limited mechanical demolition of concrete rubble and large diameter rock to facilitate construction.g.Traffic controls along public roads, as needed.h.Removal and replacement of guiderail.i.Removal, storage and reinstallation of metal stairs for recreation use.Excavated soils must be disposed of at a commercially available and permitted facility licensed to accept the material. Concrete rubble, riprap and other construction waste material must also be disposed of at a commercially available and permitted facility licensed to accept the waste or recycled, if applicable. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN22B8005' to obtain more details.*
Files
| File | Type | Posted |
|---|---|---|
| BID RESULTS.pdf | ||
| Attendance Sheet for Bid Opening.pdf | ||
| Site Visit Sign In Sheet - W911WN22B8005.pdf | ||
| Contracting Discussion.pdf | ||
| Site Visit Agenda.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Upstream embankment RIP-RAP extension, mosquito creek DAM, cortland, trumbull county, ohio | Award Notice | |
| This notice | Solicitation | |
| Mosquito RIP RAP extension | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Delaware Lake Rip Rap Supply | ENDIST Huntington | Total Small Business | |
| FY27 Euclid Creek Fishway Construction | ENDIST Buffalo | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity