Site Visit Agenda.pdf
PDF 177 KB Posted
- Attached to
- UPSTREAM EMBANKMENT RIP-RAP EXTENSION, MOSQUITO CREEK DAM, CORTLAND, TRUMBULL COUNTY, OHIO
- Solicitation number
- W911WN22B8005
About this file
This document provides details of a site visit agenda and related federal contract opportunity for upstream embankment rip-rap extension work at Mosquito Creek Dam in Cortland, Ohio. The site visit agenda outlines presentations that will provide an overview of the contract requirements, submission process, award details, project description and technical specifications, and safety protocols. It also includes a tour of the project facility.
The related federal contract opportunity solicitation seeks bids to extend the upstream riprap on the embankment to the crest of Mosquito Creek Dam. The base contract will remove approximately 3 feet of soil and place a 3 foot thick layer of R6 stone riprap along the main portion of the upstream embankment. Optional work includes similar excavation and riprap placement at other embankment areas. The requirements include erosion and instrumentation protection installation, excavation and disposal, riprap placement, earthwork and grading, limited demolition of concrete and rock, traffic control, guiderail removal and replacement, and recreation stair removal and reinstallation. Excavated materials must be disposed of at a permitted facility, while concrete, riprap and other waste must be recycled or disposed of appropriately. The pre-bid site visit agenda provides additional project details to inform potential bidders.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attendance Sheet for Bid Opening.pdf | ||
| BID RESULTS.pdf | ||
| Site Visit Sign In Sheet - W911WN22B8005.pdf | ||
| Contracting Discussion.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE VISIT AGENDA
W911WN22B8009
Upstream Embankment Rip-Rap Extension at Mosquito Creek Dam, Cortland, OH June 29, 2022
Purpose of Conference: To provide potential offerors and other interested parties the opportunity to obtain information and ask questions regarding the requirements for the above mentioned project.
TIME TOPIC
10:00 – 10:05 Welcome and Introductions
Connie Ferguson, Contract Specialist 10:05 – 10:15 Overview of Contract, Submission Requirements and Award Process
Connie Ferguson, Contract Specialist 10:15 – 10:30 Overview of Project
Joshua Shaffer, Project Manager 10:30 – 10:45 Overview of Project/Technical Requirements
Deepak Neupane, Geotechnical Civil Engineer 10:45 – 10:50 Safety Brief
Tim Hough 10:50 – 11:30 Tour of Facility 11:30 – 11:45 Final Comments
Connie Ferguson, Contract Specialist 11:30 Adjourn