Turnkey Turf Solution for K-9 Obedience Area Building 1780 - Hill Air Force Base
Closed Solicitation Posted
- Solicitation number
- F2D0CM4170A001
- Agency
-
Air Force Sustainment Center
Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238990 All Other Specialty Trade Contractors
- Place of performance
- Hill AFB, Utah 84056, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command Air Force Sustainment Center is seeking proposals for a firm-fixed-price contract to provide a turnkey synthetic turf solution for a K9 obedience area at Hill Air Force Base in Utah. The key requirements include installing 11,181 square feet of uniform, level synthetic turf with a 12-inch concrete border trim around the perimeter. The contractor will be responsible for removing and rearranging existing obstacles, and must provide warranty coverage for any manufacturer or installation defects. Proposals will be evaluated based on the lowest price technically acceptable offer, and are due by July 17, 2024 at 10:00 a.m. MDT.
This opportunity is set aside for small businesses under NAICS code 238990 - All Other Specialty Trade Contractors. The contract will be awarded to the responsible offeror whose conforming proposal is the lowest price technically acceptable. The performance period is not to exceed 120 days from contract award, and the project will take place at Hill Air Force Base in Utah.
Notice text
2 versions
Update #2 · Latest ·
08 July 2024 Update: Additional image showing square footage and dimensions added to SOO, Q&A attached
The objective is to install a comprehensive synthetic turf solution for the K9 obedience area covering 11,181 square feet underneath the current overhang (See images below).
The installed turf should ensure a uniformly level surface without depressions to prevent water accumulation. Additionally, a 12-inch wide concrete border trim will be implemented around the perimeter to secure the turf edges and prevent displacement.
Update #1 ·
The objective is to install a comprehensive synthetic turf solution for the K9 obedience area covering 11,181 square feet underneath the current overhang (See images below).
The installed turf should ensure a uniformly level surface without depressions to prevent water accumulation. Additionally, a 12-inch wide concrete border trim will be implemented around the perimeter to secure the turf edges and prevent displacement.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| HAFB Multiple Award Construction Contract V (MACC V) | Air Force Sustainment Center | Total Small Business | |
| F-35 Composite Repair and Training Facility / F-35 Maintenance Facility, Hill Air Force Base, Utah | ENDIST Sacramento | No set-aside | |
| Office Furniture Bldg. 2213 | Air Force Sustainment Center | No set-aside | |
| SABER V Hill AFB | Air Force Sustainment Center | Competitive 8(a) |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity