This notice seeks to procure construction services for the replacement and repair of roofs at Building 4002 at Thule Air Base in Greenland. The U.S. Army Corps of Engineers, New York District will issue an invitation for bid seeking a firm-fixed price contract for the replacement of the built-up low slope ballasted flat roof surrounding the Radar Tower and repairs to the double-pitched sloped metal panel roof above mechanical rooms, dining hall and staff offices. Questions must be submitted by February 8th, 2023 and specifications will be posted on January 31st, 2023 with bid opening tentatively scheduled for mid-March 2023.

There is no set-aside designated for this procurement. The project value is estimated between $5,000,000 to $10,000,000 and the performance period is approximately 400 calendar days from notice to proceed. As Thule Air Base has a short construction season from June through September due to weather, the specifications require that all supplies, personnel and materials must be shipped via air or sealift transportation methods.

Notice text

Note: This solicitation and award is restricted in accordance with 10 U.S.C. 2304(c)(4) International Agreement, to Danish and Greenlandic firms ONLY.

The U.S. Army Corps of Engineers, New York District intends to issue an Invitation for Bid solicitation package seeking to award a firm-fixed price contract for the construction of the replacement and/or repairs to the roof on Bldg. 4002. The construction is the replacement of the built-up low slope ballasted flat roof surrounding the Radar Tower (lower level) and repairs of the double-pitched sloped metal panel roof above mechanical rooms, dining hall and staff offices at 2nd floor to solve the numerous leaking problems of the roofs identified within the past 10 to 15 years. Demolition will include the removal of the top layers down to the concrete layer, removal of double-pitched metal sheet roofing down to main insulation layer and removal of built-up low-sloped roof top layers down to main thermo insulation layer in flashing area for the Tower at roof level. All roof penetrations, roof drains, membrane welding and weather stripping and strip sealing connections shall be repaired and/or replaced.  Penetrations through roofs shall be constructed with HEMP-securing material. Drainage system shall be provided leading roof water away from the building towards the terrains.

The construction season is short at Thule Air Base. General conditions at Thule Air Base are as follows: the location of Thule Air Base limits exterior work to the months of June through September. Additionally, Thule's location demands that all supplies & personnel must be shipped and/or transported, in or out, via air and/or sealift. Thule Air Base is not a commercial air/sea port and there is no other access. Shipping schedules are dictated by Defense contracts, and materials and labor are not available locally. Average winter temperature is 20 -30 degrees F below zero while average summer temperature is 40-50 degrees F above zero. One annual military cargo sealift departs from Norfolk, Virginia to Thule AB, approximately 1 July. There are two sealifts that go from Denmark to Thule AB, one in July & one in August, approximately. Airlifting any materials or equipment via military aircraft is very expensive and only on an emergency-need basis.                 

The project magnitude is between $5,000,000 to $10,000,000. The performance period for this project is approximately 400 calendar days from the Notice to Proceed date. The specifications will be posted electronically via this website on or about 31 Jan 2023 with a bid opening on or about beginning to mid-March 2023.  Any and all amendments shall be likewise posted on this website. It is the contractor’s responsibility to monitor the website for any amendments. The specifications will be posted electronically via the Contract Opportunities website at https://beta.sam.gov/. 

 All questions must be submitted in writing via email (Microsoft word format) to the Contract Specialist.  In accordance with DFARS 252.204-7007, all vendors who want access to the solicitation must be registered with System for Award Management (SAM), located at https://www.sam.gov/portal/public/SAM/, and Contract Opportunities, located at https://beta.sam.gov/, in order to safeguard acquisition related information for all Federal Agencies. Interested parties may download and print the solicitation at no charge from the Contract Opportunities website at https://beta.sam.gov/.

Point of Contact is Adrian Stafford-Browne, Contract Specialist, U.S. Army Corps of Engineers, New York District, 26 Federal Plaza, Room 1743, New York, 10278-0090, email adrian.j.stafford-browne@usace.army.mil

Notice history

Notice Type Posted
Thule Roof Repair, Building 4002 Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
GAOA Remove and Replace Roofing on Island Park Admin Site Housing Units Island Park, Idaho 83429, United States · NAICS 238160 Forest Service Total Small Business
WWYK260004 - repair structural integrity, B1134, post 34 & north wall Tinker AFB, Oklahoma 73145, United States · NAICS 238190 Air Force Sustainment Center Total Small Business
Roof Repair Wilmington, North Carolina 28405, United States · NAICS 238160 Animal and Plant Health Inspection Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity