The Dalles Campground Improvements
Closed Solicitation Posted
- Solicitation number
- 12048924R0016
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Enumclaw, Washington 98022, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Agriculture Forest Service is seeking bids for the restoration and improvement of the Dalles Campground located in the Mt. Baker-Snoqualmie National Forest in Enumclaw, Washington. The project scope includes the restoration of degraded asphalt surfacing on roads and select camping sites, the installation of closure devices, gates, and log rails, as well as the removal of trees. Key contract requirements include asphalt paving, sign installations, parking backstop installation, and all associated mobilization. The solicitation number is 12048924R0016, and all vendor questions are due by September 9, 2024.
This contract opportunity is set aside for small businesses. The estimated price range for the project is between $500,000 and $1,000,000, and the period of performance is from October 1, 2024, to November 30, 2025. The work is to be performed in Enumclaw, Washington, within the Mt. Baker-Snoqualmie National Forest. The applicable NAICS code is 237310 - Highway, Street, and Bridge Construction, and the PSC category is Z2LB - Repair Or Alteration Of Highways/Roads/Streets/Bridges/Railways.
Notice text
3 versions
Update #3 · Latest ·
The intent of this project is to restore the degraded asphalt surfacing on all roads and select camping sites in the Dalles Campground to provide for access, upkeep and safety as well as install 8 closure devices, single and double arm steel gates and rock barriers in the Mt. Baker-Snoqualmie National Forest.
The scope of work includes asphalt laying, sign installations, parking backstop installation, removing trees in various stages and log rail installation including the following: asphalt compaction, base rock laying and compaction, tree cutting and removal, pick up and deliver prepared gates to forest roads, gate installation, place signs on gates, painting gates and calibrate them to open and close smoothly including all associated mobilization.
All questions are due no later than 1000 on 06 Sep 2024.
SUBMITTED QUESTION ATTACHED ON 04 SEP 2024
VENDOR QUESTION
Attachment 3 Paving Map appears to include drawings of an additional camp area, not the Dalles campground.
- Was this campground to be included as part of our pricing? The pricing schedule doesn’t appear to include these quantities.
GOVERNMENT ANSWER
That additional campground has some signage needs only. A separate summary for each campground was not included but rather just totaled all of the signs for both projects. These campgrounds are only a few miles apart so there is not a huge mobilization cost.
VENDOR QUESTION
The performance period states from 10/1/2024 to 11/1/2025 but contract period is 120 days
- What duration is correct?
- Can some work be accomplished in fall of 2024 or all work starting in June through October
- What restriction do we have from starting work in the campground outside of the stated work window.
GOVERNMENT ANSWER
We can make the performance period 10/1/2024 to 11/1/2025 so that they will have time next year to perform work in suitable weather. All work could be performed this Fall if weather is favorable. Some work can begin today, such as putting up signs, since it would not displace any pre-registered guests that would be bumped if major construction were to start outside of this window. All campgrounds typically close a few weeks after Labor Day but if weather is great, they can opt to stay open a little longer.
Update #2 ·
The intent of this project is to restore the degraded asphalt surfacing on all roads and select camping sites in the Dalles Campground to provide for access, upkeep and safety as well as install 8 closure devices, single and double arm steel gates and rock barriers in the Mt. Baker-Snoqualmie National Forest.
The scope of work includes asphalt laying, sign installations, parking backstop installation, removing trees in various stages and log rail installation including the following: asphalt compaction, base rock laying and compaction, tree cutting and removal, pick up and deliver prepared gates to forest roads, gate installation, place signs on gates, painting gates and calibrate them to open and close smoothly including all associated mobilization.
All questions are due no later than 1000 on 03 Sep 2024.
SUBMITTED QUESTION ATTACHED ON 04 SEP 2024
VENDOR QUESTION
Attachment 3 Paving Map appears to include drawings of an additional camp area, not the Dalles campground.
- Was this campground to be included as part of our pricing? The pricing schedule doesn’t appear to include these quantities.
GOVERNMENT ANSWER
That additional campground has some signage needs only. A separate summary for each campground was not included but rather just totaled all of the signs for both projects. These campgrounds are only a few miles apart so there is not a huge mobilization cost.
VENDOR QUESTION
The performance period states from 10/1/2024 to 11/1/2025 but contract period is 120 days
- What duration is correct?
- Can some work be accomplished in fall of 2024 or all work starting in June through October
- What restriction do we have from starting work in the campground outside of the stated work window.
GOVERNMENT ANSWER
We can make the performance period 10/1/2024 to 11/1/2025 so that they will have time next year to perform work in suitable weather. All work could be performed this Fall if weather is favorable. Some work can begin today, such as putting up signs, since it would not displace any pre-registered guests that would be bumped if major construction were to start outside of this window. All campgrounds typically close a few weeks after Labor Day but if weather is great, they can opt to stay open a little longer.
Update #1 ·
The intent of this project is to restore the degraded asphalt surfacing on all roads and select camping sites in the Dalles Campground to provide for access, upkeep and safety as well as install 8 closure devices, single and double arm steel gates and rock barriers in the Mt. Baker-Snoqualmie National Forest.
The scope of work includes asphalt laying, sign installations, parking backstop installation, removing trees in various stages and log rail installation including the following: asphalt compaction, base rock laying and compaction, tree cutting and removal, pick up and deliver prepared gates to forest roads, gate installation, place signs on gates, painting gates and calibrate them to open and close smoothly including all associated mobilization.
All questions are due no later than 1000 on 09 Sep 2024.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity