Attachment 3_LRT CAMPGROUND PAVING MAP.pdf
PDF 9 MB Posted
- Attached to
- The Dalles Campground Improvements
- Solicitation number
- 12048924R0016
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is an attachment to a federal contract opportunity for the Dalles Campground Paving project in the Mt. Baker-Snoqualmie National Forest. The project scope includes restoring the degraded asphalt surfacing on roads and select camping sites, installing closure devices and gates, removing trees, and installing log rails. Key details include:
The project is managed by the U.S. Department of Agriculture Forest Service. The solicitation number is 12048924R0016, and the opportunity type is a solicitation. The work includes 2-inch asphalt lifts, signage, wheel stops, and log siderails. Alternate items include asphalt teardrop areas, pull-throughs, half-moons, and new pads. The attachment provides detailed drawings, specifications, and a summary of quantities for the various work components. All questions are due by 1000 on 09 Sep 2024.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE
DATE
APPROVED BY:
APPROVED BY:
REVIEWED BY:
DISTRICT RANGER
Title Sheet
NO. DESCRIPTION
INDEX TO SHEETS
General Notes
6-7
Log Siderail Base Project
REVIEWED BY:
DATE
DRAWINGS FOR PROPOSED
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE -- REGION SIX
MT. BAKER - SNOQUALMIE NATIONAL FOREST
SNOQUALMIE RANGER DISTRICT
FOREST ENGINEER
RECREATION LEAD
PROJECT TEAM LEADER
8-9
Buckley
Enumclaw
Greenwater
Snoqualmie Pass
Maple Valley
Startup Gold Bar
Garland Mineral Springs
Stevens Pass
Baring Grotto
Skykomish
Carnation
Fall City
Snoqualmie
North Bend
Bellevue
Redmond Duvall
Monroe
Sultan
Everett
Seattle
Tacoma
Mt. Rainier Nat'l. Park
Rockport Burlington
Mt. Vernon
Glacier
Verlot Granite Falls
Bellingham
Sedro Woolley
Concrete
CANADA
UNITED
STATES
Wilkeson
NOT TO SCALE
VICINITY MAP
Darrington
Mt. Baker
DESIGNED BY:
DATEPROJECT ENGINEER
Option Item B Asphalt Pull Throughs
Option Item D Asphalt New Pads
Option Item A Asphalt Teardrops
LRT CAMPGROUND PAVING
PROJECT
LOCATION
11-12
Asphalt Installation Details
DATE
Dalles Campground Layout
Option Item C Asphalt Half Moons
Silver Springs Layout
12-23
3/17/2023
17-18
Asphalt Base Project
13-14
Signage Base Project
15-16
Wheel Backstop Base Project
Summary of Quantitities
19-21
I I I I
--!._ ...!.. --!.. .J.. Q)
-l_-l_-l_-l_� I I I I
Scale:
Sheet:
LR
T
C A
M
PG
RO
U
N D
P A
V
IN
GGENERAL NOTES
Pay Item 15101 Mobilization-Mobilization includes all movement of equipment and materials to the job site. This pay item includes all traffic control, temporary traffic control signing, public safety, sanitary facilities, cleaning of equipment, and all other work specified as incidental to mobilization, including the following requirements: Seeding and mulching of all exposed soils is to be done with certified weed free material. All equipment shall be cleaned and inspected by the Contracting Officer prior to entering the National Forest. The Contractor shall also provide written certification that the equipment was washed and has not been used on another project since washing prior to use on this project. Forest Roads may be closed at campground entrance for the duration of the project. Post signs and barriers to prevent public access. Use signs and flaggers as necessary when performing work. All signs shall be in accordance with the Manual Uniform Traffic Control Devices (MUTCD).
Pay Item 15713 Soil Erosion and Pollution Control The Memorandum of Understanding (MOU) between the Forest Service the Washington Department of Fish and Wildlife is part of this contract and a copy must be on the project site during all construction activities. All work in and near water sources will comply with the requirements of the MOU. Pay item includes any and all erosion control. The Contractor shall submit a Temporary Erosion and Sediment Control Plan (TESCP) for review and approval by the Contracting Officer. The TESCP shall address the construction sites as well as the waste and borrow areas and include both temporary and permanent erosion control measures. The erosion control plan and all temporary erosion control features are indirect costs to this item. A spill prevention kit must be on hand to prevent any contaminants from entering waterways.
Pay Item 20102 Clearing and Grubbing Includes removal of all understory vegetation and any underground roots.
Pay Item 20207 Removal of Individual Trees Designated trees in the campground are to be cut and decked with select sizes being used as siderails in particular camp spurs as noted in the drawings.
Pay Item 20207A Removal of Hazard Trees Designated trees in the campground are to be cut and decked with select sizes being used as siderails in particular camp spurs as noted in the drawings. Remove any trees which are a threat to life and safety during the project.
Pay Item 30205 Aggregate Base Compact and shape base material in conjunction with surrounding base material. Slope to drain. All work associated with loading, hauling, placement, processing, compacting and compaction testing are indirect costs to this item. All aggregate should be from a commercial, weed free, source.
Pay Item 40304Hot Asphalt Concrete Pavement Place asphalt at locations noted in the drawings. The running surface to be paved in the Dalles Campground is 22’ before the host station and 12’ thereafter with an additional 1’ slope into existing on each side. The Dalles Day use location will be paved with a 22’ running surface aside from the parking stalls. This includes material, compaction, labor, loading and testing. Final asphalt shape should be sloped to drain with a crowned surface and taper into existing ground at edges. Clean off existing asphalt and tack down new asphalt for adhesion.
Pay Item 60910 Wheel stops Install wheel stops as noted in the drawings. Locations to be identified and approved by FS COR after paving.
Pay Item 60910A Log Siderails Install log side rails as noted in the drawings. Locations to be staked and approved by FS. COR Logs should abut edge of new asphalt.
Pay Item 63301 (A&B also) Sign Installation “One Way Do Not Enter” and “5 MPH” signs should be mounted on one post such that the incoming traffic reads “5 MPH” and the opposite side will read “One Way Do Not Enter” to prevent traffic from traveling in the wrong direction. Use vandal proof bolts to secure signs. All signs shall be mounted on 4X4 treated posts and follow MUTCD specifications. One Way Signs at initial camp entrances should be doubled with one sign on each side of the road for added emphasis (All Dalles One Way signs require 2 signs with 2 posts at each indicated entrance.). Sign locations should be approved in writing by the Forest Service COR before installation. Signs may replace existing locations but old signs and posts remain property of the Forest Service and should be stored at Silver Springs Campground Host Site or other location as directed by COR.
G
EN
ER
A
L N
O
TE
S
LR
T
C A
M
PG
RO
U
N D
P A
V
IN
G
SU
M
M A
RY
O
F Q
U A
N
TI
TI
ES
SUMMARY OF QUANTITIES
C A
M
PG
RO
U
N D
P A
V
IN
G
G
EN
ER
A
L N
O
TE
S
DALLES CAMPGROUND LAYOUT
C A
M
PG
RO
U
N D
P A
V
IN
G
G
EN
ER
A
L N
O
TE
S
SILVER SPRINGS CAMPGROUND LAYOUT
HOT MIX ASPHALT BASE PROJECT 2 INCH LIFTS DALLES CAMPGROUND
T
C A
M
PG
RO
U
N D
P A
V
IN
G
TOTAL 1,400 TONS
HOT MIX ASPHALT BASE PROJECT 2 INCH LIFTS DALLES CAMPGROUND
T
C A
M
PG
RO
U
N D
P A
V
IN
G
TOTAL 1400 TONS
SIGNAGE BASE PROJECT - DALLES CAMPGROUND
T
C A
M
PG
RO
U
N D
P A
V
IN
G
SIGNAGE BASE PROJECT SILVER SPRINGS CAMPGROUND
T
C A
M
PG
RO
U
N D
P A
V
IN
WHEEL STOP BASE PROJECT DALLES CAMPGROUND
T
C A
M
PG
RO
U
N D
P A
V
IN
BASE PROJECT PINNED LOG SIDERAILS DALLES CAMPGROUND
T
C A
M
PG
RO
U
N D
P A
V
IN
G
11 23
G A
TE
L
O C
A
TI
O N
M A
P
BASE PROJECT ITEM SIDELOG RAILING DALLES CAMPGROUND
TC
A M
PG
RO
U N
D P
A V
IN
G
S
ID
EL
O
G R
A
IL
IN
G
BURY LOG MIN 1/4 DIAMETER INTO GROUND
SECURE WITH REBAR USING
SMOOTH CAP OR SMOOTH HEAD ON
PRE-DRILLED HOLES
ENSURE PINS ENTER GROUND TO
DEPTH OF 20"
USE PIN EVERY 4' IN LENGTH~" AND
STAY 2' FROM ENDS
<MIN 2'> <MIN 2'>
MIN 4' BETWEEN PINS
OPTION ITEM A TEAR DROP ASPHALT
T
C A
M
PG
RO
U
N D
P A
V
IN
OPTION ITEM A TEAR DROP ASPHALT DALLES CAMPGROUND
T
C A
M
PG
RO
U
N D
P A
V
IN
G
C B
A
TYPICAL SIDES OF TEARDROP
OPTION B HOT-MIX ASPHALT PULL THROUGHS DALLES CAMPGROUND
T
C A
M
PG
RO
U
N D
P A
V
IN
G
P U
LL
T
H
RO
U G
H D
ET
A
IL
OPTION B PULL THROUGH TYPICAL PLAN VIEW DALLES CAMPGROUND
T
C A
M
PG
RO
U
N D
P A
V
IN
G
P U
LL
T
H
RO
U G
H P
LA
N
V
IE
W
CLEAR AND GRUB, COMPACT GRAVEL, AND LAY NEW ASPHALT OVER NEW PULL THROUGH SECTIONS THEN ADD NEW ASPHALT OVER FULL PULL THROUGH SECTION AS ONE UNIFORM LAYER. SEE NEW HOT ASPHALT PATCHING AND PAVING FOR PULL THROUGHS. CREATE PULL THROUGHS AROUND MARKED LEAVE TREES AT SITES #20 AND #40 AS MARKED IN FIELD BY LEAVING ISLAND IN BETWEEN PULL THROUGH AND ROAD. OLD
SPUR ASPHALT OUTSIDE OF PULL THROUGHS MAY BE LEFT.
OPTION C NEW HALF MOON ASPHALT DALLES CAMPGROUND
T
C A
M
PG
RO
U
N D
P A
V
IN
G
H A
LF
M
O O
N D
ET
A
IL
OPTION C HALF MOON ASPHALT PLAN VIEW DALLES CAMPGROUND TYPICAL
TC
A M
PG
RO
U N
D P
A V
IN
G
H A
LF
M
O O
N P
LA
N
V
IE
W
CLEAR AND GRUB, COMPACT GRAVEL, AND LAY NEW 6 INCHES OF ASPHALT OVER NEW HALF MOON SECTIONS . SEE VARIED WIDTHS AND
LENGTHS ON PAGE 17.
TYPICAL CAMP SITE
MAIN CAMP ROAD
TYPICAL CAMP SITE
OPTION D NEW ASPHALT PADS DALLES CAMPGROUND
TC
A M
PG
RO
U N
D P
A V
IN
G
N
EW
A
SP
H A
LT
P
A D
OPTION D NEW TURN OUT LEFT (TOL) AND HOST STORAGE PAD IN DALLES
CAMPGROUND
LR
T
C A
M
PG
RO
U
N D
P A
V
IN
G
20 23
N
EW
A
SP
H A
LT
P
A D
M A
P
INSTALL 14' WIDE BY 23' LONG TOL
IN BETWEEN KIOSK AND WATER ACCESS
INSTALL 22' WIDE BY 60' LONG HOST STORAGE PAD
CLEAR AND GRUB, NEW TOL ONLY, COMPACT ALL GRAVEL, AND LAY 2 INCHES OF NEW ASPHALT OVER SPECIFIED WIDTHS AND LENGTHS
FLUSH WITH SURROUNDING ASPHALT
OPTION D REST ROOM ASPHALT ACCESS PADS DALLES CAMPGROUND
T
C A
M
PG
RO
U
N D
P A
V
IN
G
21 23
R
ES
TR
O
O M
P A
V
IN
G M
A P
COMPACT ALL GRAVEL, AND LAY 2 INCHES OF NEW ASPHALT OVER SPECIFIED WIDTHS AND LENGTHS FLUSH WITH SURROUNDING ASPHALT
HOT-MIX ASPHALT PATCHING AND PAVING TYPICAL
T
A
SP
H A
LT
P
A V
IN
G
PA
V
IN
G
D
ET
A
IL
S
NEW HOT-MIX ASPHALT PATCHING AND PAVING FOR PULL THROUGHS TYPICAL
T
C A
M
PG
RO
U
N D
P A
V
IN
G
A
SP
H A
LT
D
ET
A
IL
S
BUILD UP AGGREGATE AND NEW ASPHALT FOR FINAL UNIFORM DEPTH
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| Blank Page |
| 2023-03-26T16:32:51-0700 | |
| CLARIBEL ORELLANA |
| 2023-03-27T14:51:42-0700 | |
| Brian McNeil |
| 2023-03-27T13:00:18-0700 | |
| YIQIANG GU |
| 2023-03-29T09:55:01-0700 | |
| HEATHER B. RANDALL WILDER |
File details come from the government source that posted it. Updated .