Tenas creek road erfo, darrington ranger district

Award Notice Posted

Solicitation number
AG-05M6-S-09-0036
Agency
Awarded
to D.g. Buchanan Construction, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
AG-05M6-C-09-0013 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Mt. Baker-Snqoualmie National Forest Darrington Ranger District Skagit County, Washington, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Awarded

Update #1 ·

This project if for the reconstruction of the road due to flood damage on FS Road 2660 Tenas Creek Road, at and near MP 4.2 and repair of the adjacent Tenas Creek Bridg railing. During the 2006-2007 flood event, the Tenas Creek road was severely washed out at the bridge and the road just before and after the Bridge. Some work has already been done at this location in the channel and equipment access to the bridge. Work include but is not limited to erosion control, culvert removal, culvert installation, borrow excavation, placement of riprap rock, removal of the damaged bridge railing, installation of a new bridge W-beam railing, installation of W-beam railing with handrail, placement of crushed aggregate, installation of signs, seeding and mulching. The project is located on Forest Road 2660, Tenas Creek, at MP 4.2 on the Darrington Ranger District in Township 33 N, Range 11 E, Section 21. Travel north of Darrington Washington on State Route 530 approx. 5 miles to the intersection of Forest Road 26, Suiattle. Turn right onto Forest Road 26 and travel east approx 7 miles to the intersection of Forest Road 2660, Tenas Creek. Turn left on Tenas Creek Road and travel north 4.2 miles to the project site. A District map showing the road system is available for viewing at the district office. Estimated issue date of the solicitation is on or about May 18, 2009. Estimated start work date is approx June 22, 2009 when the snow melts giving access to the project area. Contract work time is approx 40 days. The Governments estimated price range is between $25,000 and $100,000. Payment security shall be required for this project. The technical contact for this project is James Mitchell, Mt. baker Ranger District. His phone number (360) 856-5700 ext 316. Interested parties can download a copy of the solicitation documents from this website when they are available.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors