Solicitation-AG-05M6-S-09-0036.pdf

PDF 246 KB Posted

Attached to
TENAS CREEK ROAD ERFO, DARRINGTON RANGER DISTRICT
Solicitation number
AG-05M6-S-09-0036
Issued by

About this file

Solicitation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION PAGE OF PAGES

(THIS IS NOT AN ORDER) THIS RFQ IS IS NOT A SMALL BUSINESS SET- ASIDE 1

1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT.DEF. RATING

AG-05M6-S-09-0036 05/18/2009

UNDER BDSA REG. 2 �

AND/OR DMS REG. 1

5a. ISSUED BY 6. DELIVER BY (Date)

MT. BAKER-SNOQUALMIE NATIONAL FOREST

2930 WETMORE ANUE, STE 3A

EVERETT, WA 98201

60 Calendar days from date of issuance of the Notice to Proceed Estimated Start Work: June 22, 2009

5b. FOR INFORMATION CALL (NO COLLECT CALLS) 7. DELIVERY FOB DESTINATION NAME TELEPHONE NUMBER OTHER (See Schedule)

AREA CODE NUMBER 9. DESTINATION

BONNIE CHILDS (425) 446-2743 a. NAME OF CONSIGNEE

8. TO:

a. NAME b. COMPANY b. STREET ADDRESS

c. STREET ADDRESS c. CITY

d. CITY e. STATE f. ZIP CODE d. STATE e. ZIP CODE

10. PLEASE FURNISH QUOTATIONS TO THE

ISSUING OFFICE IN BLOCK 5A ON OR

BEFORE CLOSE OF BUSINESS

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in BLOCK 5a.

This request does not commit the Government to pay any costs incurred in the preparation of the

June 12, 2009 submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(a) (b) (c) (d) (e) (f)

TENAS CREEKERFO ROAD REPAIR

Darrington Ranger District

MAIL Quote To:

Mt. Baker Snoqualmie National Forest

DO NOT

ENTER

ENTER

ON THE

ATTN: Acquisition 2930 Wetmore Avenue, Suite 3A

PRICES HERE ATTACHED

SCHEDULE

Everett, WA 98201 OF ITEMS

Or FAX Quote To: (425) 783-0129

TECHNICAL CONTACT:

JIM MITCHELL (360) 856-5700 Ext: 316

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

12. DISCOUNT FOR PROMPT PAYMENT � NUMBER PERCENTAGE

NOTE: Additional provisions and representations are are not attached.

13. NAME AND ADDRESS OF QUOTER 14. SIGNATURE OF PERSON AUTHORIZED TO 15. DATE OF

a. NAME OF QUOTER SIGN QUOTATION QUOTATION

b. STREET ADDRESS 16. SIGNER

a. NAME (Type or print) b. TELEPHONE

c. COUNTY AREA CODE

d. CITY e. STATE f. ZIP CODE c. TITLE (Type or Print) NUMBER

NSN 7540-01-152-8084

Previous edition not usable

18-121 STANDARD FORM 18 (Rev. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)

Part I – The Schedule

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

TENAS CREEK ERFO ROAD REPAIR

Skagit County, Washington

METHOD PAY ESTIMATED UNIT AMOUNT

PAY ITEM DESCRIPTION OF MEAS. UNIT QUANTITY PRICE BID

202(02) Removal of Culverts A.Q. Each 1 $__________ $ __________

203(08) Borrow Excavation, L.S. L.S. 1 $ __ $ __________ Placement Method 2

203(16) Drainage Excavation, type L.S. L.S. 1 $ __ $ __________ Inlet Basin

204(07) Silt Fence A.Q. L.F. 100 $ __________ $__________

221(01) Earthwork Geotextiles, D.Q. S.Y. 30 $ __ $ __________ type II

251(01)A Placed Riprap, Class 4, A.Q. Ton 16 $ __ $ __________ Method A

251(01)B Placed Riprap, Class 7, A.Q. Ton 48 $__________ $ __________ Method A

304(11) Crushed Aggregate, Type A.Q. Ton 320 $ __ $ __________ Base, Grading D, Compaction A(Commercial Source)

306(01) Reconditioning of roadbed, D.Q. L.F. 500 $__________ $ __________ Compaction A

556(01)A W-Beam Bridge Railing A.Q. L.F. 69 $ __ $ __________

556(01)B W-Beam Bridge Railing A.Q. L.F. 69 $ __ $ __________ w/pedestrian rail

601(01) Mobilization L.S. LSQ 1 $ __ $ __________

SCHEDULE OF ITEMS

TENAS CREEK ERFO ROAD REPAIR

METHOD PAY ESTIMATED UNIT AMOUNT

PAY ITEM DESCRIPTION OF MEAS. UNIT QUANTITY PRICE BID

603B(03)A 18-Inch, Corrugated A.Q. L.F. 40 $ __ $ __________

Polyethylene Pipe, Backfill Method C

603B(03)B 24-Inch, Corrugated A.Q. L.F. 36 $ __ $ __________

Polyethylene Pipe, Backfill Method C

625(02) Seeding, Dry Method D.Q. Sq.Yd. 200 $ __ $ __________ (With Mulch)

633(01) Wood Posts A.Q. L.F. 64 $__________ $ __________

633(06)A Aluminum Sign Panels A.Q, Each 2 $__________ $ __________ Type W5-3, 36”x36”

633(06)B Aluminum Sign Panels A.Q. Each 2 $__________ $ __________ Type OM-3L

633(06)C Aluminum Sign Panels A.Q. Each 2 $__________ $ __________ Type OM-3R

637(01)A Medium size excavator D.Q. Hour 32 $ __ $ __________ w/thumb, Hitachi 150 or equivalent

637(01)B Medium size Grader, D.Q. Hour 32 $ __ $ __________ Cat 14 or equivalent or equivalent

TOTAL PRICE ----> $____________

Note:

Designed Method of Measurement: DQ – Designed Quantities, AQ – Actual Quantities LSQ – Lump Sum Quantities Pay Units: L.S. = Lump Sum, C.Y. = cubic yards, L.F. = lineal feet, S.F. = square feet, Hr. = hour

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 DESCRIPTION OF WORK: Tenas Creek ERFO Road Repair

This work involves repairing Forest Service #2660, Tenas Creek Road at and near Milepost 4.2, the Tenas Creek Bridge. During the 2006-2007 flood event, the Tenas Creek road was severely washed out at the Bridge and the road just before and after the Bridge. Some work has already been done at this location in the channel and equipment access to the bridge. To reconstruct the road at this location, the work includes: mobilization, erosion control, culvert removal, culvert installation, borrow excavation, placing riprap rock, removing damaged bridge railing, installing new bridge W-beam railing, installing W-beam railing with handrail, placing crushed aggregate, installation of signs and seeding & mulching.

C.2 PROJECT LOCATION:

From the town of Darrington, Washington, travel north on State Highway 530 to the junction with Forest Development Road 26. Turn right (east) on FDR 26. Follow road 26 to the junction with road 2660. Turn left onto road 2660 and go 4 miles to the road closure. The project begins at this closure.

C.3 PRICE RANGE:

The Government's estimate is between $25,000 and $100,000.

C.4 PROJECT SCHEDULING:

All Work on this project is planned to begin by June 22. Contract time is 60 calendar days from the date of the Notice to Proceed.

C.5 SPECIFICATIONS

The August 1996 "Forest Service Specifications for Construction of Roads and Bridges" is applicable to this project and attached Special Project Specifications.

Note: See “Special Project Specification 106.03F1”.

The Forest Service Specifications for Construction of Roads and Bridges are based on Modern Metric units of measurement. The dimensions and units of measure SHOWN ON THE DRAWINGS for this contract utilize U.S. Standard English units of measure. The SPECIAL PROJECT SPECIFICATIONS developed for this contract, utilize dual units of both Modern Metric and U.S. Standard English units of measure. Convert all measurements referenced in the August 1996 Forest Service Standard Specifications (EM-7720-100) to U.S. Standard English units of measure.

C.6 CERTIFICATIONS, INVOICES, TESTING REPORTS & OTHER SUBMITTALS

Work associated with the following specification sections will require certifications, invoices, testing reports, or other submittals to the Contracting Officer.

Section 204, 221, 251, 304, 556, 603B, and 625.

Refer to the Forest Service Specifications for required submittals for sections mentioned above.

C.7 MATERIAL SOURCES

The Government will provide the following sources of material to the Contractor for use in the performance of his contract.

Item No. Description Quantity Location

None

C.8 AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS

(FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-1 Contractor Inspection Requirements (APR 1984) 52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

52.242-14 Suspension of Work (APR 1984)

F.2 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within 14 days after the date of contract award. The conference will be held at (location to be determined after contract award).

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 PHYSICAL DATA

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

The indications of physical conditions on the drawings and in the specifications are the result of site investigations by Forest Personnel.

• Weather Conditions: Normal Cascade Mountain conditions.

• Elevation of this project is approximately 1300’.

• Due to snow, the project is usually not accessible from October through May yearly.

• Transportation facilities: Road access is adequate.

• Other Physical Data: State Highway 530 is a double-lane paved road. Forest Service Road #26 is a narrow double lane road to the intersection with road #2660 at approximately Milepost 8. Expect light traffic on week days, tourist site seeing, recreational traffic, and administrative traffic. Expect heavy tourist and recreational traffic on Fridays and weekends.

H.2 FISH AND WILDLIFE RESTRICTIONS

For fish and wildlife considerations, the following restrictions are applicable to this contract:

From April 1 to September 15, all work activities shall begin two hours after official sunrise and must stop two hours before official sunset.

All work associated with in stream channels shall be done between July 1 and Sept 15.

H.3 CONTROL OF NOXIOUS WEEDS--CLEANING OF EQUIPMENT (March 2004)

To prevent the introduction and control the spread of seeds of noxious weeds onto and around National Forest land, the Contractor shall ensure all equipment moved onto National Forest land is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. When the Contractor is working in an area that has been identified as a noxious weed infestation area, the Contractor shall ensure equipment is cleaned of weed seeds prior to moving to another work area on the Forest. The Contractor shall employ whatever cleaning methods necessary to ensure compliance with the terms of this provision, and shall notify the Forest Service prior to moving each piece of equipment onto National Forest land, unless otherwise agreed in writing. Notification will include identifying the location of the equipment's most recent operations.

The Contractor shall certify, in writing, compliance with the terms of this clause prior to each start-up of operations. For the purposes of this clause, "equipment" includes all motorized equipment operated off system roads, transport vehicles, and all motorized equipment used in road maintenance. Not included are log trucks, chip vans, pickup trucks, cars, or other vehicles used to daily transport personnel.

H.4 WDFW-USFS MOU PROVISIONS (JAN 2005)

(Washington State Department of Fish & Wildlife – US Forest Service Memorandum of Understanding)

A complete copy of the MOU document will be provided to the Contractor at the Pre-Work

Meeting. The Contractor shall have it readily available on the jobsite at all times.

The following provisions are applicable to this contract:

H.5 GENERAL PROVISIONS APPLICABLE TO ALL APPENDIX A PROJECTS

Timing

1. Freshwater hydraulic projects shall normally be implemented only during the work periods outlined in Appendix D. Other timing will be allowed on a site-specific basis if the Forest Service fish biologist and WDFW Area Habitat Biologist agree that implementing the activity outside of the normal period would be unlikely to cause negative impacts to fish. Any agreements to modify the work periods in Appendix D for specific projects or specific sites shall be documented by WDFW.

2. Those portions of hydraulic project work that occur outside or above the bankfull channel and have little or no potential to negatively affect fish or fish habitat are not subject to the work periods specified in Appendix D. Examples of such work include replacing bridge decking, constructing a bridge superstructure after footings are in place, and building up the fill of a culvert that is in place. These projects are still bound the other provisions in Appendix A. The Forest Service shall notify the appropriate WDFW Regional Habitat Program Manager prior to implementing work on these hydraulic projects outside the work periods specified in Appendix D.

3. Hydraulic projects conducted in intermittent non-fish-bearing streams that are dry during the proposed work are not subject to the work periods specified in Appendix D unless USFS fish biologist determine the activities are likely to negatively affect fish life, in which case the work periods specified in Appendix D apply.

Hydraulic projects conducted in wetted non-fish-bearing streams that are greater than ¼ mile from fish-bearing water are not subject to the work periods specified in Appendix D unless USFS fish biologist determine the activities are likely to negatively affect fish life, in which case the work periods specified in Appendix D apply.

Fish Protection

4. Any pump used for diverting water from a fish-bearing waterbody shall be equipped with a fish guard to prevent passage of fish into the pump. The pump intake shall be screened with 3/32 inch or smaller mesh. Screen maintenance shall be adequate to prevent injury or entrapment to juvenile fish and shall remain in place whenever water is withdrawn from the water body through the pump intake.

5. Fish within construction sites that will be dewatered or isolated from the main water body will be captured and safely moved from the job site. Fish capture and transportation equipment shall be available on the job site during all in water activities.

6. If at any time, as a result of project activities, a fish kill occurs, fish are observed in distress, or water quality problems develop that may present a threat to fish life, the Forest Service shall immediately notify the appropriate WDFW Regional Habitat Program Manager. Outside of business hours, notification shall be made to the Washington State Emergency Management Division of the Department of Ecology at 1-800-258-5990.

Erosion and Wastewater Control

7. Alteration or disturbance of the bed, banks, and vegetation of waterbodies shall be minimized and limited to that necessary to construct the project.

8. Erosion prevention and control methods shall be used as necessary during and immediately after project implementation to minimize loss or displacement of soils and to prevent delivery of sediment into waterbody. These may include, but are not limited to, operational techniques, straw bales, silt fencing, erosion control blankets, temporary sediment ponds, and/or immediate mulching of exposed areas. Disturbed ground with the potential to deliver sediment into waterbodies shall be revegetated or protected from surface erosion by seeding, mulching, other methods prior to the fall rainy season.

9. After project completion, disturbed streambanks and lakeshores shall be revegetated with site-appropriate vegetation to maintain soil stability and provide shade and future sources of large wood.

10. Wastewater from project activities shall be routed to an area outside the bankfull channel to allow removal of fine sediment and other contaminants prior to infiltrating back into waterbodies.

Heavy Equipment

11. The use of heavy equipment within the bankfull channel in streams and below the ordinary high water line in lakes is discouraged. If such work is necessary, operation of heavy equipment in these areas shall be minimized.

12. Accumulations of soil or debris shall be removed from drive mechanisms (wheels, tires, tracks, etc.) and undercarriage of all heavy equipment prior to its working within the bankfull channel in streams or below the ordinary high water line in lakes.

13. To prevent contamination, equipment used around waterbodies shall be free of external petroleum-based products. Equipment shall be checked daily for leaks and any necessary repairs shall be completed prior to commencing work activities. All machinery fueling and maintenance involving petroleum products shall occur at a sufficient distance from stream channels, waterbodies, or wetlands to prevent delivery of potential contaminants. Spill containment equipment and material shall be on site.

Concrete and Treated Wood

15. Fresh concrete, concrete by-products, or other chemical contaminants shall not be allowed to enter waterbodies. Structures containing concrete shall be sufficiently cured to prevent leaching prior to contact with the waterbody.

16. Treated wood used for hydraulic projects shall meet or exceed the standards established in the most current edition of "Best Management Practices For the Use of Treated Wood in Aquatic Environments” developed by the Western Wood Preservers Institute.

At the time of the signing of this MOU, the most current version is the July 1996 edition.

Other

17. A copy of this MOU shall be available on site at all times when work is conducted under the provisions of Appendix A.

WDFW-USFS INTERIM MOU SPECIFIC PROJECT PROVISIONS

Permanent Culvert Installation and Replacement

NOTE: Permanent culvert installation and replacement projects include installation of new culverts that are installed for more than one year and replacement of existing culverts with similar or larger structures.

In addition to the General Provisions Applicable to All Projects, the following project-specific provisions apply when conducting permanent culvert installation or replacement projects.

1. In non fish-bearing waters, Provisions 2-6 (highlighted with a *) are not required.

2. *Culverts in fish-bearing streams shall be designed, installed, and maintained to provide passage for all fish species and all life stages that are likely to be encountered at the site.

3. *Culverts in fish-bearing streams shall be designed and installed based on the stream simulation approach. Stream simulation designs are intended to mimic the natural stream characteristics and processes.

4. *Site investigations and selections of appropriate stream simulation culvert designs should be guided by Washington State “Design of Road Culverts for Fish Passage”, R-6 Training Manual, or an equivalent process.

5. *Forest Service shall notify WDFW when they begin the design process for a fish passage culvert. Collaboration is encouraged on these projects and can be initiated by either agency when there are concerns about any of these projects.

6. *A Forest Service staff with expertise in stream processes and fish habitat shall be on-site during initial culvert placement and placement of streambed materials inside the pipe for all culverts in fish-bearing streams.

7. *Installation of baffled culverts in fish-bearing streams is not included under Appendix A.

8. Culverts shall be designed, installed and maintained to accommodate the 100-year peak flow with consideration of the sediment load and large wood likely to be encountered.

9. Culverts shall be designed, installed and maintained to avoid negative channel changes such as inlet scouring or erosion of the streambed or banks downstream of the project.

10. The crossing structure shall consist of a single culvert.

11. Construction sites shall be dewatered or isolated from flowing waters to prevent generation of sediment and minimize turbidity.

12. Every effort shall be made to avoid stream crossings with heavy equipment. A single round-trip equipment crossing of the stream channel shall be allowed, if necessary. Equipment operation within the stream channel inside of the approximate culvert footprint is permissible so long as the stream has been dewatered.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I-1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.usda.gov/procurement/policy/agar.html

52.209-6 Protecting the Government's Interest when Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment (MAY 2008) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.219-6 Notice of Total Small Business Set-Aside (JUN 2003 52.222-3 Convict Labor (JUN 2003) 52.222-6 Davis-Bacon Act (JUL 2005) 52.222-7 Withholding of Funds (FEB 1988) 52.222-8 Payrolls and Basic Records (FEB 1988) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (JUL 2005) 52.222-12 Contract Termination - Debarment (FEB 1988) 52.222-13 Compliance with Davis-Bacon and Related Act Regulations (FEB 1988) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (FEB 1988) 52.222-20 Walsh-Healy Public Contracts Act (DEC 1996) 52.222-21 Prohibition of Segregated Facilities (FEB 1999) 52.222-26 Equal Opportunity (MAR 2007) 52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999) 52.222-36 Affirmative Action for Workers with Disabilities (JUN 1998) 52.222-50 Combating Trafficking in Persons (SEP 2007) 52.223-6 Drug-Free Workplace (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.224-1 Privacy Act Notification (APR 1984) 52.224-2 Privacy Act (APR 1984) 52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-11 Pledges of Assets (FEB 1992) 52.228-12 Prospective Subcontractor Requests for Bonds (OCT 1995) 52.228-14 Irrevocable Letter of Credit (DEC 1999) 52.232-5 Payments Under Fixed-Price Construction Contracts (SEP 2002) 52.232-18 Availability of Funds (APR 1984) 52.232-23 Assignment of Claims (JAN 1986)

52.232-27 Prompt Payment for Construction Contracts (OCT 2008) 52.232-33 Payment by Electronic Funds Transfer – Central Contractor Registration

(OCT 2003)

52.233-1 Disputes (JUL 2002) 52.233-3 Protest After Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) 52.236-15 Schedules for Construction Contracts (APR 1984) 52.236-16 Quantity Surveys (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items (DEC 2008) 52.245-1 Property Records (JUN 2007) 52.245-2 Government Property (Fixed-Price Contracts) (JUN 2007) 52.246-21 Warranty of Construction (MAR 1994) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From)

(APR 1984)

52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.253-1 Computer Generated Forms (JAN 1991)

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.232-70 Reimbursement for Bond Premiums – Fixed-Price Construction Contracts (NOV

1996) (Applicable if contract is over $30,000) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-76 Samples and Certificates (FEB 1988) 452.236-77 Emergency Response (NOV 1996)

I.2 52.204-7 CENTRAL CONTRACTOR REGISTRATION (APR 2008)

(a) Definitions. As used in this clause—

“Central Contractor Registration (CCR) database” means the primary Government repository for Contractor information required for the conduct of business with the Government.

“Data Universal Numbering System (DUNS) number” means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

“Data Universal Numbering System+4 (DUNS+4) number” means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

“Registered in the CCR database” means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record “Active”. The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)

(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS or DUNS+4 number that identifies the offeror’s name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number—

(i) Via the internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States;

or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government’s reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)

(1)

(i) If a Contractor has legally changed its business name, “doing business as” name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day’s written notification of its intention to:

(A) Change the name in the CCR database;

(B) Comply with the requirements of Subpart 42.12 of the FAR;

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the “Suspension of Payment” paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR record to reflect an assignee for the purpose of assignment of claims (see FAR Subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the CCR database. Information provided to the Contractor’s CCR record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the “Suspension of payment” paragraph of the EFT clause of this contract.

(h) Offerors and Contractors may obtain information on registration and annual confirmation requirements via the Internet at http://www.ccr.gov or by calling 1-888-227-2423, or 269-961- 5757.

I.3 FAR 52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (FEB

2009)

(a) Definitions. As used in this clause--

“Commercially available off-the-shelf (COTS) item”—

(1) Means any item of supply (including construction material) that is—

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.

“Component” means an article, material, or supply incorporated directly into a construction material.

“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.

However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Cost of components” means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if—

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

“Foreign construction material” means a construction material other than a domestic construction material.

“United States” means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to the construction material or components listed by the Government as follows: NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) *

Item 1

Foreign construction material

Domestic construction material

Item 2

Foreign construction material

Domestic construction material

[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]

I.4 FAR 52.228-13 ALTERNATIVE PAYMENT PROTECTION (JUL 2000)

(a) The Contractor shall submit one of the following payment protections

• Payment Bond

• Irrevocable Letter of Credit

• Cashier’s Check

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

I.5 AGAR 452.228-70 ALTERNATIVE FORMS OF SECURITY (NOV 1996)

If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to: USDA Forest Service.

I.6 ORDER OF PRECEDENCE—CONSTRUCTION

Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The Schedule (excluding the specifications)

(2) Representations and Other Instructions

(3) Contract Clauses

(4) Other Documents, Exhibits, and Attachments

(5) The Specifications

(6) Drawings

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

J.1 LIST OF ATTACHMENTS (AGAR 452.252-70) (FEB 1988)

The attachments to the Statement of Work/Specifications listed below are hereby made part of this solicitation and any resultant contract.

Exhibit or Attachment Number of Pages

1. Specification List 2

2. Special Project Specifications 12

3. Project Drawings 22

Page Number Description 1 Title Sheet 2 Project Location Map

3 Summary of Quantities 4-5 General Notes 6 Guard Rail Detail 7 Object Marker Detail 8 Culvert Cross Section at Station 0+80

9-10 Work List 11-14 Pictures

15-22 Silt Fence Details

5. Fire Protection and Suppression Requirements, 6

4. Current Wage Rate 5

TENAS ERFO ROAD REPAIR

FOREST SERVICE SPECIFICATIONS FOR CONSTRUCTION OF ROADS & BRIDGES

SPECIFICATION LIST

LATEST

SPEC. NO. DESCRIPTION REVISION DATE

100 ERRATA 7/12/99

101 ABBREVIATIONS, ACRONYMS, & TERMS 1996

101.01F1 Terms, Organizations & Standards 7/28/00

101.021 Abbreviations 8/6/97

102 DEFINITIONS 1996

103 INTENT OF CONTRACT 1996

104 MAINTENANCE FOR TRAFFIC 1996

104.013 Roads to be Constructed (Signing) 8/10/00

104.021 Use of Roads by Contractor 8/26/96

105 CONTROL OF MATERIALS 1996

105.011 Handling Materials 8/26/96

106 MEASUREMENT AND PAYMENT 1996

106.03F1 Units of Measurement 8/1/03

106.031 Units of Measurement (d) Hectare: 4/03/97

160 QUALITY CONTROL & QUANTITY MEASUREMENT 1996

170 CONSTRUCTION STAKING, L-LINE 1996

201 CLEARING & GRUBBING 1996

201.021 Clearing & Grubbing 3/26/98

203 EXCAVATION AND EMBANKMENT 1996

203.082 Sloping, Shaping, & Finishing 3/26/98

204 SOIL EROSION & WATER POLLUTION CONTROL 1996

206 STRUCTURAL EXCAVATION FOR MAJOR STRUCTURES 1996

206.04F1 General 8/24/01

206A STRUCTURAL EXCAVATION FOR MINOR STRUCTURES 1996

251 RIPRAP 1996

304 AGGREGATE BASE OR SURFACE COURSE 1996

403 MINOR HOT ASPHALT CONCRETE PAVEMENT 1996

552 STRUCTURAL CONCRETE 1996

552.01F1 Work 7/28/00

553 PRESTRESSED CONCRETE 1996

553A PRECAST CONCRETE STRUCTURES 1996

554 REINFORCING STEEL 1996

554.08F1 Placing & Fastening 7/28/00

555 STEEL STRUCTURES 1996

555.18F1 Welding 7/28/00

556 BRIDGE RAILING 1996

556.02F1 Requirements 8/03/01

557 TIMBER STRUCTURES 1996

564 BEARING DEVICES 1996

564.02F1 Requirements 8/24/01

601 MOBILIZATION 1996

603B PLASTIC PIPE 1996

HANNEGAN ERFO ROAD REPAIR

FOREST SERVICE SPECIFICATIONS FOR CONSTRUCTION OF ROADS & BRIDGES

SPECIFICATION LIST

LATEST

SPEC. NO. DESCRIPTION REVISION DATE

603B.081 Basis 6/27/97

625 SEEDING AND MULCHING 1996

625.02F1 Requirements 4/8/01

633 SIGNS 1996

634 PAINTED TRAFFIC MARKINGS 1996

637 EQUIPMENT RENTAL 1996

701 CEMENT, GROUT, & MORTAR 1996

703 AGGREGATE 1996

705 ROCK 1996

705.021 Riprap Rock 4/6/06

706 CONCRETE & PLASTIC PIPE 1996

706.081F1 Plastic Pipe 8/10/97

709 REINFORCING STEEL & WIRE ROPE 1996

709.01F1 Reinforcing Steel 7/28/00

711 CONCRETE CURING MATERIAL & ADMIXTURE 1996

712 JOINT MATERIAL 1996

713 ROADSIDE IMPROVEMENT MATERIAL 1996

716 MATERIAL FOR TIMBER STRUCTURES 1996

717 STRUCTURAL METAL 1996

717.01F1 Structural Steel 7/28/00

718 TRAFFIC SIGNING & MARKING MATERIAL 1996

718.11F1 Signposts 7/28/00

725 MISCELLANEOUS MATERIAL 1996

SPECIAL PROJECT SPECIFICATIONS

ERRATA

LAST REVISION DATE 07/12/99

105.06 Material Sources - under (a) change the third paragraph to read: “The weight/volume relationship used for determining planned quantities of material in designated sources subject to weight measurement is SHOWN ON THE DRAWINGS.”

201.03 Utilization of Timber - under (b) (4) change second word from “of” to “as”.

201.05 Slash Treatment - Change the second paragraph to read; “ Pieces of wood less than 75mm in diameter and 1m in length may be scattered, outside the roadbed, within the clearing limits.”

203.08 Sloping, Shaping, & Finishing (d) Finishing - Change last sentence to read: “Finish roadbeds to the tolerances from table 203-1 as SHOWN ON THE DRAWINGS.”

401.04 Mixing Plant - under (b) (3) delete last sentence.

401.09 Aggregate Preparation - 2nd paragraph, 2nd sentence change "and contamination of" to ", and contamination of,".

401.17 Acceptance Sampling & Testing of Asphalt Concrete Pavement - 2nd paragraph, 3rd sentence change "0.3 m" to "300 mm".

Table 401-7 Quality Level Analysis by the Standard Deviation Method - delete first sentence of the "Note".

402.04 Mixing Plant - under (b) (2) add "Stockpile the material according to Subsection 305.03 and 305.04."

402.13 Compacting - 2nd paragraph, 3rd sentence, change "roller marks" to "roller ridges, ruts, and humps".

402.17 Acceptance Sampling & Testing of Asphalt Concrete Pavement - 2nd paragraph, 3rd sentence change "0.3 m" to "300 mm".

404.05 Acceptance Sampling & Testing - under (c) change "404.04(g)" to "404.04(h)".

414.05 Joint Cleaning & Sealing - in first paragraph, first sentence change "414.06" to "414.04".

415.02 Requirements - change "703.12" to "703.11".

Table 702-1 Application Temperatures - change "RC, MC, or SC-30" to "RC, MC, or SC-70"

703.09 Asphalt Surface Treatment Aggregate - under (f) change "FLH 508" to "FLH T 508".

703.14 Superpave Asphalt Concrete Pavement Aggregate - under (b) change "AASHOT T 104" to

AASHTO T 104".

707.15 Repair of Damaged Coatings - change the ASTM reference from A849 to A760

716.05 Substitution for Solid Sawn Structural Timber & Lumber - change in second sentence to read.....Ensure that all substitutions have approximately equal dimensions and will provide equal or greater bending and shear strength per member.

R6/SPS-101.01F1 July 28, 2000

101.01 Terms, Organizations, & Standards

(a) Acronyms

Add the following:

BMP Best Management Practice EPA Environmental Protection Agency FPL Forest Products Laboratory SSPC The Society for Protective Coatings WCLIB West Coast Lumber Inspection Bureau WWPA Western Wood Products Association USN United States Navy

R6/SPS-101.021 August 6, 1997

101.02 Pay Items & Pay Units. Add the following:

ABBREVIATIONS

Aggregate Agg.

Corrugated Metal Pipe Arch CMPA Full Bituminous Coated FBC Government Furnished Materials GFM Individual Removal Indiv. Remov.

Large Lrg.

Medium Med.

Miscellaneous Misc Slash Treatment Sl. Trt.

Small Sm.

Steel St.

Structural-Plate Arch S.P.A.

Structural-Plate Pipe S.P.P.

Structural-Plate Pipe Arch S.P.P.A.

R6/SPS-104.013 August 10, 2000

104.01 Roads to be Constructed. Delete the second sentence of paragraph one. Add the following at the end of paragraph one:

Furnish, install and maintain temporary traffic controls prior to beginning construction on, or utilization of, existing roads. The minimum necessary signing, sign legend and locations are shown below and will be installed as appropriate. Contractor shall furnish the Contracting Officer a traffic control plan for approval.

All signs shall meet MUTCD Standards and shall be orange & black reflectorized

LEGEND SHAPE & MINIMUM SIZE REQUIREMENTS & LOCATION

ROAD

CONSTRUCTION

AHEAD

Diamond 760 mm X 760 mm

Place 150 meters prior to initial activity

END CONSTRUCTION Rectangle

1524 mm X 610 mm Place 150 meters beyond the end of activity

BLASTING ZONE AHEAD Diamond

760 mm X 760 mm Place 300 meters prior to any blasting operation

TURN OFF 2-WAY

RADIOS AND CELLULAR

TELEPHONES

Rectangle 1070 mm X 915 mm

Place 300 meters prior to any blasting operation

END BLASTING ZONE Rectangle

1070 mm X 915 mm Place 300 meters beyond any blasting operation when access is possible beyond blasting area

ROAD MACHINERY AHEAD Diamond

915 mm X 915 mm Place 150 meters on each side of areas where heavy equipment is operating in or adjacent to the roadway.

TRUCKS Diamond

760 mm X 760 mm Place either side of each road junction on single-lane roads when haul is in progress.

If specified in the table below, road segments may be closed by the Contractor to all traffic during the period(s) construction is in progress. The maximum consecutive days/hours of closure period shall be followed by a minimum consecutive days/hours of open period as specified.

In the event the Contractor elects to close any of the listed roads during construction operations, give the Contracting Officer at least 10 days advance written notice.

Termini Max. Closure Min. Open Purpose of Road No. From To Period Period Closure

2260 MP 1.0 End Total All Contract work.

When construction activity is in progress and total closure has not been provided for herein, a delay not to exceed 60 minutes shall be employed to reasonably accommodate traffic.

R6/SPS-104.021 August 26,1996

104.02 Use of Roads by Contractor. Add the following:

Maintenance requirements for roads that are to be constructed or reconstructed as part of this contract apply only after the roads have been completed and accepted. For other roads, prehaul maintenance must be completed before use begins. Other maintenance requirements apply when Contractor's use of roads begins.

Maintenance required, and applicable maintenance specifications, are shown in the Road Listing.

Perform maintenance in accordance with the Standard Maintenance Specifications as published in the Forest Service Handbook - Transportation System Maintenance Handbook in effect on the date of advertisement. These maintenance specifications are available from the local Forest Supervisor's office. Special Project Specifications shown in the Road Listing supersede or clarify standard maintenance specifications and are attached hereto.

ROAD LISTING:

Maintenance Requirements Special Termini Dust Post Spot Project Use Road # From To Abate Routine Haul Rock Spec Limits

2660 MP 0.00 to MP 4.2 No Yes None

USE LIMITATIONS: Loads should not exceed state highway load limits.

If the Contractor requests use of a National Forest road or road segment not listed above, authorization to use such additional roads may include maintenance requirements…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .