TEAD - Refuse Collection
Closed Solicitation Posted
- Solicitation number
- W519TC24R2013
- Agency
- ACC Rock Island Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 562111 Solid Waste Collection
- Place of performance
- Tooele, Utah 84074, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a contractor to provide refuse collection and recycling services at Tooele Army Depot in Tooele, Utah. The Department of the Army Materiel Command Contracting Command at Rock Island Arsenal requires the contractor to collect refuse and single-stream recyclable materials from containers at TEAD and TEAD South locations on an as-needed basis, transporting all refuse to the local approved landfill and recycling materials to a recycling collection company. The contractor must be responsible for all licensing, taxes, permits, and transportation costs. Responses are due by January 29, 2024.
No set-aside is designated for this procurement. The NAICS code is 562212 and PSC code S206. The contractor will provide refuse collection services for TEAD in Tooele, Utah for one base year with four one-year option periods. Key details include collection from roll-off containers in 15-yard and 30-yard sizes on an as-needed basis within 24 hours of notification, transportation of collected materials to the approved landfill and recycling facilities, and responsibility for all associated transportation costs.
Notice text
4 versions
Update #4 · Latest ·
QUESTION - Excel Spreadsheet with answers to querstions that were due 16 Jan 2024 are attached.
PLEASE CHECK AMENDED SOLICITATION ATTACHMENT. Added due date for questions.
PROJECT SUMMARY: Tooele Army Depot (TEAD) has a projected requirement to furnish all labor, material, and equipment needed to fully manage and perform all operations for the collection and transportation of refuse and single-stream recyclable material. Single-stream recycling consist of aluminum cans and foil; Aseptic packaging and gable top containers (milk and juice cartons); Steel and tin cans; Plastics (#1 through 7); Paper Fiber (newspaper, cardboard, Kraft bags, magazines, catalogs, office and computer paper, notebook, chipboard, carrier stock, junk mail and envelops, paperback and hard cover books). The contractor shall transport all recyclable material collected to a recycle collection/recycler company. The contractor shall transport all refuse collected to the Utah State approved solid waste disposal facility under contract with TEAD. All licenses, taxes, and permits required by local, state, or federal governments shall be the contractor’s responsibility. Landfill fees for the actual tonnage disposed shall be the Government’s responsibility. Services provided shall be according to the specifications contained herein and current local, state, and federal regulations. The contractor is responsible for all transportation costs.
Update #3 ·
PLEASE CHECK AMENDED SOLICITATION ATTACHMENT. Added due date for questions.
PROJECT SUMMARY: Tooele Army Depot (TEAD) has a projected requirement to furnish all labor, material, and equipment needed to fully manage and perform all operations for the collection and transportation of refuse and single-stream recyclable material. Single-stream recycling consist of aluminum cans and foil; Aseptic packaging and gable top containers (milk and juice cartons); Steel and tin cans; Plastics (#1 through 7); Paper Fiber (newspaper, cardboard, Kraft bags, magazines, catalogs, office and computer paper, notebook, chipboard, carrier stock, junk mail and envelops, paperback and hard cover books). The contractor shall transport all recyclable material collected to a recycle collection/recycler company. The contractor shall transport all refuse collected to the Utah State approved solid waste disposal facility under contract with TEAD. All licenses, taxes, and permits required by local, state, or federal governments shall be the contractor’s responsibility. Landfill fees for the actual tonnage disposed shall be the Government’s responsibility. Services provided shall be according to the specifications contained herein and current local, state, and federal regulations. The contractor is responsible for all transportation costs.
Update #2 ·
PLEASE CHECK AMENDED SOLICITATION ATTACHMENT. NARRATIVE BEGINS ON PAGE 24.
PROJECT SUMMARY: Tooele Army Depot (TEAD) has a projected requirement to furnish all labor, material, and equipment needed to fully manage and perform all operations for the collection and transportation of refuse and single-stream recyclable material. Single-stream recycling consist of aluminum cans and foil; Aseptic packaging and gable top containers (milk and juice cartons); Steel and tin cans; Plastics (#1 through 7); Paper Fiber (newspaper, cardboard, Kraft bags, magazines, catalogs, office and computer paper, notebook, chipboard, carrier stock, junk mail and envelops, paperback and hard cover books). The contractor shall transport all recyclable material collected to a recycle collection/recycler company. The contractor shall transport all refuse collected to the Utah State approved solid waste disposal facility under contract with TEAD. All licenses, taxes, and permits required by local, state, or federal governments shall be the contractor’s responsibility. Landfill fees for the actual tonnage disposed shall be the Government’s responsibility. Services provided shall be according to the specifications contained herein and current local, state, and federal regulations. The contractor is responsible for all transportation costs.
Update #1 ·
PROJECT SUMMARY: Tooele Army Depot (TEAD) has a projected requirement to furnish all labor, material, and equipment needed to fully manage and perform all operations for the collection and transportation of refuse and single-stream recyclable material. Single-stream recycling consist of aluminum cans and foil; Aseptic packaging and gable top containers (milk and juice cartons); Steel and tin cans; Plastics (#1 through 7); Paper Fiber (newspaper, cardboard, Kraft bags, magazines, catalogs, office and computer paper, notebook, chipboard, carrier stock, junk mail and envelops, paperback and hard cover books). The contractor shall transport all recyclable material collected to a recycle collection/recycler company. The contractor shall transport all refuse collected to the Utah State approved solid waste disposal facility under contract with TEAD. All licenses, taxes, and permits required by local, state, or federal governments shall be the contractor’s responsibility. Landfill fees for the actual tonnage disposed shall be the Government’s responsibility. Services provided shall be according to the specifications contained herein and current local, state, and federal regulations. The contractor is responsible for all transportation costs.
Attachments
| File | Type | Posted |
|---|---|---|
| W519TC-24-R-2013 - QUESTIONS.xlsx | XLSX spreadsheet | |
| W519TC-24-R-2013 - AMENDMENT 0002.pdf | ||
| W519TC-24-R-2013-0001.pdf | ||
| SOW 04 Jan 2024.docx | DOCX document | |
| SOW 10 Aug 2023.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| TEAD - Refuse Collection | Solicitation | |
| TEAD - Refuse Collection | Pre-Solicitation | |
| TEAD - Refuse Collection | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity