W519TC-24-R-2013 - QUESTIONS.xlsx
XLSX spreadsheet 10 KB Posted
- Attached to
- TEAD - Refuse Collection Federal contract opportunity
- Solicitation number
- W519TC24R2013
About this file
This document contains questions and answers regarding a solicitation for refuse collection services at Tooele Army Depot. The solicitation requires a contractor to fully manage and perform all operations for the collection and transportation of refuse and single-stream recyclable material from Tooele Army Depot. The recyclable materials include aluminum cans and foil, aseptic packaging, steel and tin cans, plastics numbered 1 through 7, and various paper fibers. The contractor must transport all recyclable material to a recycling collection facility and transport all refuse to the Utah state-approved solid waste disposal facility under contract with Tooele Army Depot. The solicitation requires the contractor be responsible for all licensing, taxes, permits, and transportation costs but the government will be responsible for landfill fees based on actual tonnage disposed. The period of performance is anticipated to start on March 1, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W519TC-24-R-2013 - AMENDMENT 0002.pdf | ||
| W519TC-24-R-2013-0001.pdf | ||
| SOW 04 Jan 2024.docx | DOCX document | |
| SOW 10 Aug 2023.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS - TEAD - Refuse
| 1 | Would our trucks be allowed to enter the base with a partial load from surrounding collection? Or in other words, can we mix our trash from off base stops with on base stops? | |
| Answer: | No | |
| 2 | What sort of clearances would our drivers need to enter the base? | |
| Answer: | This is addressed in the SOW Section 14. | |
| 3 | Would we be able to do a site visit to get an idea of how spread out the containers will be placed? | |
| Answer: | Yes | |
| 4 | How many roll off containers would physically need to be onsite at any given time? | |
| Answer: | This is addressed in the SOW section 2 | |
| 5 | What is the anticipated starting date for the contract? | |
| Answer: | The pop starts March 1, 2024 | |
| 6 | Is the Tooele County Landfill a TEAD approved landfill/transfer station? | |
| Answer: | As mandated by Tooele County Solid Waste Management Regulation, Section 7-1-5, all refuse generated within the jurisdiction of Tooele County shall be disposed of in Tooele County. | |
| 7 | Are we able to provide a 10 yard container instead of the 6 yard containers? | |
| Answer: | There are no 6YD containers in the contract only 15 and 30YD containers. | |
| 8 | The amendment to the solicitation no longer displays the need for 6-yard containers for recyclables. Is this accurate? | |
| Answer: | There are no 10YD containers in the contract only 15 and 30YD containers. |
File details come from the government source that posted it. Updated .