W519TC-24-R-2013 - QUESTIONS.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
TEAD - Refuse Collection Federal contract opportunity
Solicitation number
W519TC24R2013
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This document contains questions and answers regarding a solicitation for refuse collection services at Tooele Army Depot. The solicitation requires a contractor to fully manage and perform all operations for the collection and transportation of refuse and single-stream recyclable material from Tooele Army Depot. The recyclable materials include aluminum cans and foil, aseptic packaging, steel and tin cans, plastics numbered 1 through 7, and various paper fibers. The contractor must transport all recyclable material to a recycling collection facility and transport all refuse to the Utah state-approved solid waste disposal facility under contract with Tooele Army Depot. The solicitation requires the contractor be responsible for all licensing, taxes, permits, and transportation costs but the government will be responsible for landfill fees based on actual tonnage disposed. The period of performance is anticipated to start on March 1, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to TEAD - Refuse Collection, newest first.
File Type Posted
W519TC-24-R-2013 - AMENDMENT 0002.pdf PDF
W519TC-24-R-2013-0001.pdf PDF
SOW 04 Jan 2024.docx DOCX document
SOW 10 Aug 2023.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS - TEAD - Refuse

1Would our trucks be allowed to enter the base with a partial load from surrounding collection? Or in other words, can we mix our trash from off base stops with on base stops?
Answer:No
2What sort of clearances would our drivers need to enter the base?
Answer:This is addressed in the SOW Section 14.
3Would we be able to do a site visit to get an idea of how spread out the containers will be placed?
Answer:Yes
4How many roll off containers would physically need to be onsite at any given time?
Answer:This is addressed in the SOW section 2
5What is the anticipated starting date for the contract?
Answer:The pop starts March 1, 2024
6Is the Tooele County Landfill a TEAD approved landfill/transfer station?
Answer:As mandated by Tooele County Solid Waste Management Regulation, Section 7-1-5, all refuse generated within the jurisdiction of Tooele County shall be disposed of in Tooele County.
7Are we able to provide a 10 yard container instead of the 6 yard containers?
Answer:There are no 6YD containers in the contract only 15 and 30YD containers.
8The amendment to the solicitation no longer displays the need for 6-yard containers for recyclables. Is this accurate?
Answer:There are no 10YD containers in the contract only 15 and 30YD containers.