Sustainment, Restoration, Modernization (SRM) – Indefinite Delivery Contract, Various locations, Alaska

Closed Solicitation Posted

Not the latest version. See the latest special notice from .

Solicitation number
W911KB-24-R-0011
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Anchorage, Alaska, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers (USACE) Alaska District is issuing a solicitation for a Multiple Award Task Order Contract (MATOC) for Sustainment, Restoration, and Modernization (SRM) projects at various military installations and locations in Alaska and Wake Island. The contract will cover a broad range of construction, renovation, repair, infrastructure, environmental, and systems maintenance work, including horizontal construction, vertical construction, sustainment, renovation, and modernization of real property. Task orders may be fully designed (Design-Bid-Build) or Design-Build, and the contractor will be required to furnish all materials, equipment, and personnel necessary to manage and accomplish the work. The evaluation process will consist of two phases - Phase 1 evaluates performance capability, and Phase 2 evaluates technical proposals and pricing for the initial seed task order as well as the overall MATOC awards.

This opportunity is set aside for small businesses under NAICS code 236220 with a $45 million size standard. The USACE Alaska District plans to award a target of five IDIQ MATOC contracts with a shared $450 million capacity and a seven-year ordering period. The work will be performed at various locations in Alaska and Wake Island.

Notice text

4 versions

Update #4 · Latest ·

THIS IS TO IDENTIFY THE SIX CONTRACTORS SELECTED TO MOVE ON TO PHASE 2 FOR THIS ACQUISITION.  THE SIX CONTRACTORS ARE AS FOLLOWS:

Brice Solutions Inc

Bristol Prime Contractors LLC

Eklutna Construction and Maintenance

Orion Construction

Red Point Construction LLC

Weldin Construction LLC

Amendment has been posted on 3 OCT 2024 to extend proposal due date to 7 OCT 2024.

Amendment has been posted on 18 JUN 2024 to extend proposal due date to 9 JUL 2024.

The contract(s) are for a broad range of Sustainment, Restoration, Modernization (SRM) and other small
construction of various facilities and infrastructure on various military installations, as well as, at other locations in
Alaska and Wake Island. The contracts will be a Multiple Award Task Order Contract (MATOC) and will list a
variety of individual construction tasks. During the contract period, the U.S. Army Corps of Engineers (USACE)
will identify the scope of work required to complete each specific job, negotiate a price and performance time for
each job, and issue task orders to the MATOC contractor(s) to complete the work. The task orders may be
horizontal construction, vertical construction, sustainment, renovation and modernization of real property, or a
combination, and may be fully designed or Design-Build. The contractor will be required to furnish all materials,
equipment, and personnel necessary to manage and accomplish the job. The task orders will include a variety of
construction, infrastructure site improvements (such as fencing, roads, parking, airfield paving, and drainage), facility
repairs, incidental environmental work (including Hazardous Materials (HazMat), soil, and asbestos testing, removal,
disposal and containment), facility upgrades, and, system maintenance (such as Heat Ventilation Air-Conditioning
(HVAC), plumbing, electrical, wastewater treatment systems, elevators, building envelope, fire protection, Anti-
Terrorism Force Protection (AT/FP), demolition, electronic security systems), and may be fully designed (Design-
Bid-Build) or Design-Build.

Update #3 ·

Amendment has been posted on 3 OCT 2024 to extend proposal due date to 7 OCT 2024.

Amendment has been posted on 18 JUN 2024 to extend proposal due date to 9 JUL 2024.

The contract(s) are for a broad range of Sustainment, Restoration, Modernization (SRM) and other small
construction of various facilities and infrastructure on various military installations, as well as, at other locations in
Alaska and Wake Island. The contracts will be a Multiple Award Task Order Contract (MATOC) and will list a
variety of individual construction tasks. During the contract period, the U.S. Army Corps of Engineers (USACE)
will identify the scope of work required to complete each specific job, negotiate a price and performance time for
each job, and issue task orders to the MATOC contractor(s) to complete the work. The task orders may be
horizontal construction, vertical construction, sustainment, renovation and modernization of real property, or a
combination, and may be fully designed or Design-Build. The contractor will be required to furnish all materials,
equipment, and personnel necessary to manage and accomplish the job. The task orders will include a variety of
construction, infrastructure site improvements (such as fencing, roads, parking, airfield paving, and drainage), facility
repairs, incidental environmental work (including Hazardous Materials (HazMat), soil, and asbestos testing, removal,
disposal and containment), facility upgrades, and, system maintenance (such as Heat Ventilation Air-Conditioning
(HVAC), plumbing, electrical, wastewater treatment systems, elevators, building envelope, fire protection, Anti-
Terrorism Force Protection (AT/FP), demolition, electronic security systems), and may be fully designed (Design-
Bid-Build) or Design-Build.

Update #2 ·

Amendment has been posted on 18 JUN 2024 to extend proposal due date to 9 JUL 2024.

The contract(s) are for a broad range of Sustainment, Restoration, Modernization (SRM) and other small
construction of various facilities and infrastructure on various military installations, as well as, at other locations in
Alaska and Wake Island. The contracts will be a Multiple Award Task Order Contract (MATOC) and will list a
variety of individual construction tasks. During the contract period, the U.S. Army Corps of Engineers (USACE)
will identify the scope of work required to complete each specific job, negotiate a price and performance time for
each job, and issue task orders to the MATOC contractor(s) to complete the work. The task orders may be
horizontal construction, vertical construction, sustainment, renovation and modernization of real property, or a
combination, and may be fully designed or Design-Build. The contractor will be required to furnish all materials,
equipment, and personnel necessary to manage and accomplish the job. The task orders will include a variety of
construction, infrastructure site improvements (such as fencing, roads, parking, airfield paving, and drainage), facility
repairs, incidental environmental work (including Hazardous Materials (HazMat), soil, and asbestos testing, removal,
disposal and containment), facility upgrades, and, system maintenance (such as Heat Ventilation Air-Conditioning
(HVAC), plumbing, electrical, wastewater treatment systems, elevators, building envelope, fire protection, Anti-
Terrorism Force Protection (AT/FP), demolition, electronic security systems), and may be fully designed (Design-
Bid-Build) or Design-Build.

Update #1 ·

The contract(s) are for a broad range of Sustainment, Restoration, Modernization (SRM) and other small
construction of various facilities and infrastructure on various military installations, as well as, at other locations in
Alaska and Wake Island. The contracts will be a Multiple Award Task Order Contract (MATOC) and will list a
variety of individual construction tasks. During the contract period, the U.S. Army Corps of Engineers (USACE)
will identify the scope of work required to complete each specific job, negotiate a price and performance time for
each job, and issue task orders to the MATOC contractor(s) to complete the work. The task orders may be
horizontal construction, vertical construction, sustainment, renovation and modernization of real property, or a
combination, and may be fully designed or Design-Build. The contractor will be required to furnish all materials,
equipment, and personnel necessary to manage and accomplish the job. The task orders will include a variety of
construction, infrastructure site improvements (such as fencing, roads, parking, airfield paving, and drainage), facility
repairs, incidental environmental work (including Hazardous Materials (HazMat), soil, and asbestos testing, removal,
disposal and containment), facility upgrades, and, system maintenance (such as Heat Ventilation Air-Conditioning
(HVAC), plumbing, electrical, wastewater treatment systems, elevators, building envelope, fire protection, Anti-
Terrorism Force Protection (AT/FP), demolition, electronic security systems), and may be fully designed (Design-
Bid-Build) or Design-Build.

Files

Notice history

Notice Type Posted
JBR050 AKARNG Aircraft Maintenance Hangar Latest special notice Special Notice
This notice Solicitation
Sustainment, Restoration, Modernization (SRM) – Indefinite Delivery Contract, Various locations, Alaska Pre-Solicitation
Sustainment, Restoration, Modernization (SRM) – Indefinite Delivery Contract, Various locations, Alaska Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors