SUBASE Kings Bay Car Wash Equipment Replacement
Closed Solicitation Posted
- Solicitation number
- NAVMWR-25-Q-0018
- Agency
-
Naval Supply Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 811192 Car Washes
- Place of performance
- Kings Bay, Georgia 31547, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Navy Naval Supply Systems Command is seeking a contractor to provide comprehensive car wash equipment replacement services at SUBASE Kings Bay, Georgia. The solicitation requires a full removal and replacement of a four-bay self-service car wash system, including site investigation, material procurement, demolition, and installation of new equipment. Key contract requirements include installing a multi-pressure car wash system with nine specific functions, new 360-degree pressure spray wand booms, 180-degree foam conditioner booms, and POS control meters compatible with NAYAX payment systems. The contractor must also provide chemicals and detergents for start-up testing, install a weatherproof vending machine and bill changer, and submit a signage graphics package for approval. The response deadline is January 23, 2025, with an expectation that the contractor will provide a comprehensive operations and maintenance manual and conduct staff training.
The solicitation is not set aside for any specific business category and falls under the NAICS category 811192 for Car Washes. The estimated project cost ranges between $132,000 to $150,500, with a performance period of 60 calendar days after the Notice to Proceed (potentially extendable to 90 days). The place of performance is Kings Bay Base in Georgia, and the project is a Non-Appropriated Fund (NAF) procurement. The contractor must provide warranties for materials and labor for a minimum of one year and is required to submit performance and payment bonds within 10 calendar days of award notification. The project includes comprehensive requirements for site protection, restoration, and daily cleanup, with all work to be completed to the satisfaction of the Point of Contact and Contracting Officer.
Notice text
The Contractor shall provide all services, including materials, labor and installation required for the complete removal and replacement of a four (4) bay self-service car wash system located at SUBASE Kings Bay.
Work shall include but is not limited to the following:
1. Site Investigation: The Contractor shall provide and perform all necessary site investigation and utility locates (including, but not limited to, sub-surface utility “pot holing”) as required to complete the project. All site investigation activities shall be coordinated with appropriate Installation personnel through the Point of Contact (POC).
2. Materials: The Contractor shall provide all materials, equipment and fixtures, including all required accessories, necessary to produce a complete and useable facility. Additionally, the Contractor is responsible for all material handling, staging, delivery/transportation, receipt confirmation, loading/unloading of all materials, including any lifting equipment required, during all phases of work.
3. Disposal: The Contractor is responsible for the disposal of all waste materials generated as part of this project and shall remove all waste and equipment to an offsite area. All and laydown area will be designated for the new equipment and disposal containers. Also, the Contractor shall clean up the work site daily to the satisfaction of the POC.
4. Demolition: The Contractor shall remove all materials not required for the operation of the proposed systems within all four (4) existing car wash bays and supporting spaces, while retaining all code required items. The existing Self-Service Multi-Pressure Car Wash system including water hoses and plumbing lines, all existing bay controls and meters, and all existing 360 degree and 180 degree pressure booms. The Contractor shall remove the existing bill changer and dispose of as stated above. The Contractor shall also remove and dispose of all existing operational wall signage, and all wall accessories typical for all four (4) bays.
5. Renovation: The Contractor shall furnish install a new Self-Service Multi-Pressure Car Wash System. The new Self-Service Car Wash System shall include all new hoses and plumbing lines to support the new system. The system shall include the minimum of the following functions:
- Tire Cleaner
- Presoak
- High Pressure Soap
- Wax
- Rinse
- Spot-Free Rinse
- Bug Off
- Foam Brush
- Foam Conditioner
6. The Contractor shall provide all the chemicals and detergents for the duration of start-up testing and inspections to ensure the Self-Service Car Wash System is fully operational.
7. The Contractor shall furnish and install four (4) new 360-degree Pressure Spray Wand Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required. The Contactor shall install four (4) new 180- degree Foam Conditioner Booms and any attachments needed to connect to the existing system supply piping within each wash bay as required.
8. Renovation: The Contractor shall furnish and install in all four (4) bays the following accessories:
- Foam Brush Buckets
- High Pressure Wand Holders
- Bay Hooks
- Matt Clamps
- Menu Board and Operational Signage
9. Renovation: The Contractor shall furnish and install four (4) new Self-Serve Car Wash
POS Control Meters. The new Bay Control Meters shall have a coin and credit card option.
The individual credit card reader must be compatible with NAYAX payment and
management system. The Contractor shall insure that the Point of Sale (POS) system is
compatible with the Installation Morale Welfare and Recreation (MWR) department’s
existing NAYAX system. The Government will provide 3rd party encryption and process
separately from this contract.
10. Renovation: The Contractor shall install a new weatherproof electrical vending machine
that will be compatible with the same payment option as line item ten (10) above. The
vending machine options shall include items such as:
- Towels
- Wipes
- Protectants
- Shines
- Cleaners
- Deodorizers
- Air Fresheners
11. The Contractor shall furnish and install a new bill changer matching existing unit
configurations at the same location as existing.
12. Renovation: The Contractor shall install all new equipment and related accessories, as
per manufacturer’s installation guidelines.
If the Contractor is quoting an “equal” to the listed product herein, the Contractor shall
submit complete specifications on the “equal” product with the response to this RFQ. The
specifications will be reviewed by the POC and Contracting Officer (KO) for possible use
on this project.
13. Submittal: The Contractor shall submit a Signage Graphics package to the POC for
approval fifteen (15) days prior to fabrication. All new merchandising and operational
signage must comply with the MWR Brand Standards.
14. Preservation: The Contractor shall protect existing adjacent materials, especially wall and
floor surfaces, from any and all damage during the work, by utilizing walk pads,
construction screens and other industry best practices protection methods.
15. Restoration: The Contractor shall repair and/or replace all facility elements impacted
and/or damaged by work, to the satisfaction of the POC. The Contractor shall patch, paint
and/or otherwise restore all building materials, including but not limited to, wall and floor
surfaces damaged by work; to the satisfaction of the POC.
16. Warranties: The Contractor shall provide a warranty on all materials i.e chemicals and
detergents/equipment and labor for a period of one (1) year, or longer if standard for materials/equipment, from the date of acceptance by the KO. The Contractor shall refer to Section H and I for additional information regarding warranties and extended warranties.
17. The Contractor shall provide an Operations and Maintenance (O&M) Manual to the POC and KO, as instructed. Also, the Contractor shall provide instruction and training to the POC, MWR facility staff and PWD representatives on the care and maintenance of all installed equipment and systems, using the O&M Manual as the training basis.
Site Inspection
The Contractor shall examine the site and determine for themselves the existing conditions and
general character of the site. Claims for additional costs due to conditions that could have been
verified by site investigation will not be authorized. Contractor shall contact the POC to schedule
the Site Inspection.
Files
| File | Type | Posted |
|---|---|---|
| NAVMWR-25-Q-0018-0001.pdf | ||
| NAVMWR-25-Q-0018.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Washer/Dryer Lease and Maintenance, Naval Submarine Base (NSB), Kings Bay, GA | Naval Supply Systems Command | Total Small Business | |
| Replacement of Automatic Car Wash | AFLCMC Hanscom AFB | Total Small Business | |
| Tank and Parts Washer Cleaning and Desludging Services | Naval Sea Systems Command | Total Small Business | |
| Sources sought: commercial availablility of fully automated clean shop wet process system and associated equipment B794 NAS JAX, FL | Naval Facilities Engineering Command | No set-aside | |
| PNSY- Sanitary Tank Cleaning | Naval Sea Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity