Stonewall Jackson Lake Dam Replace Pylon Building Roofs

Closed Solicitation Posted

Solicitation number
W911WN19Q0189
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238160 Roofing Contractors
PSC
Z Maint, Repair, Alter Real Property
Place of performance
Stonewall Jackson Lake Dam 1012 Skin Creek Road Weston Wv 26452 USA

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Quotation due date has been extended until Tuesday August 20, 2019.
Awardable Options have been added to the RFQ, and as such CLINs have been revised. 

Update #3 ·

An amendment will be forthcoming to revise this RFQ, and to extend the due date for this project, please refrain from submitting any quotes until this Amendment is posted. 
If you have any questions, please feel free to contact the Contract Specialist listed for this project. 

Update #2 ·

Amendment 0001 extends the quotation due date to Thursday August 15, 2019.

Update #1 ·

This is a Request for Quote (RFQ) issued in accordance with FAR Parts 13 and 36. The U.S. Army Corps of Engineers, Pittsburgh District has a requirement for Roofing Replacement at the Stonewall Jackson Lake Dam Pylong Building located at 1012 Skin Creek Rd. Weston, WV 26452-7435. The site of work may be reached from state and local roads and streets.  
The work includes the removal of existing roofing systems on three roof levels down to the concrete decks and the placement of new tapered insulation and modified bitumen built up roofing system on these roofs at the pylon building on the dam. The general description of the work is to furnish all equipment, labor, layout of work, supervision and materials necessary to complete the work as shown and as specified. Typical detail of the new roof is indicated on the attached “TYPICAL NEW MODIFIED  BITUMEN ROOF DETAIL”.
The existing roofs on the pylon building at the dam consist of two lower level roofs that function as observation decks and one upper level penthouse roof.
Details of the building construction are shown on the attached reference drawings, however, the penthouse roofing has been replaced at one time with a spray-applied system over foam insulation.  No further information on the penthouse roof is available.  The work shall include removal and disposal of all roofing materials over the all three roofs down to the existing concrete decks, including all flashing, roof drains, flashing around penthouse roof scuttle, and installation of new tapered insulation, flashing, roof drains, and all other work to furnish all equipment, labor, layout of work, supervision and materials necessary to complete the work as shown and as specified. 

The Contractor shall be responsible for transport of materials to the site and to prevent demolished materials from entering the lake. All material provided in the performance of this contract shall be unused and meet the requirements of the specifications. 
The Contractor shall verify dimensions and clearances in the field before beginning work.

Files

File Type Posted
Amendment_0003_(9-25-19).pdf PDF
Amendment_0002(8-14-19).pdf PDF
Amendment_0001.pdf PDF
RFQ_W911WN19Q0189.pdf PDF
Technical_Specifications_and_Contract-Reference_Drawings.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity