Steam Plant Chemical Maintenance and Supplies

Award Notice Posted

Solicitation number
M67001-16-Q-0040
Agency
Awarded
to Coastline LTD.
Set-aside
No set-aside

Opportunity facts

Contract number
M67001-16-D-0008 Federal IDV award
NAICS code
325998 All Other Miscellaneous Chemical Product and Preparation Manufacturing
PSC
Not on record
Place of performance
Camp Lejeune, North Carolina 28542, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

QUESTIONS AND ANSWERS
RFQ M67001-16-Q-0040
Steam Plant Chemicals


QUESTION: 2 Technical Requirements. b). Sodium sulfite oxygen scavenger - are you requesting a dry or liquid based sulfite? If dry do you have mix tanks? You do want catalyzed sodium sulfite, correct?


ANSWER: We are requesting dry sulfite treatment. Yes, catalyzed sodium sulfite. We have batch tanks for mixing dry sulfite at the larger plants.


QUESTION: Section 2.1.9.4 Weekly. Are routine service visits at a weekly interval? *as an example per month: large steam plants week 1, small steam plants group A week 2, small steam plants group B week 3, hot water boilers (first 20) week 4 *hot water boilers would be checked monthly at 20 site intervals....month 1 - 20, month 2 - 20, month 3 - 20, month 4 - 20, month 5 - 20, month 6 - none (repeat for months 7 - 12 to get the loops checked twice annually)


ANSWER: Routine service visits are weekly for steam plant monitoring and treatment only. We would like our treatment inventory monitored and maintained so that we don't run out of treatment. The example above is good for routine visits. Our current contractor tests the steam supply and condensate return systems at least monthly. This has worked well for us.
We would expect the contractor to inform operations and the chemist of any plant related issues they might find. This may include visiting and testing one or more plants multiple times to help resolve any issues.


Hot water boiler monitoring by the contractor is not included in this contract. This contract covers chemical supply and test kits and reagents for hot water boiler systems.


QUESTION: Section 2.2 Equipment Requirements 2.2.2 - Should these tanks be double walled tanks (self-contained) and will they be located inside or outside?


ANSWER: We currently have both inside and outside tanks. Outside tanks are double walled except where they have secondary containment. Inside or outside tanks installed under this contract should be double walled. The Environmental Management Division MCBCL specifies storage tanks 50 gal. and above be double walled or have secondary containment.


QUESTION: 2.2.3 - How many chemical feed pumps will need to be replaced and are these to be included in the fixed price?


ANSWER: Currently there are no chemical feed pumps that need to be replaced. Price of pumps will be included in the fixed price.

QUESTION: 2.2.4 - How many neat chemical feed tanks and pumps for future small plants will there be and are these to be included in the fixed price?


ANSWER: We have plans for 7 new steam plants to go online in the future. This should include 14 chemical tanks and 14 chemical pumps. These should be included in the fixed price.


 


QUESTION: 2.2.5 - Is the heat tracing to be included in the fixed price and if so is there a specific scope / # locations / etc.?


ANSWER: Heat tracing will be included in the fixed price if required. We have been able in the past to place our treatments inside plants to avoid freezing. We don't have a specific scope or location where heat tracing may be required in the future.


QUESTION: (4) Service. h & j state to provide 8 combined water test kits and 8 conductivity meters, but in 2.1.11 & 2.1.13 it states to provide 6 of each?


ANSWER: Please provide 6 combined test kits and 6 conductivity meters.


QUESTION: (5) Equipment. Do the tanks have to be stainless?


ANSWER: Tanks do not need to be stainless unless required for storage of treatment or required for chemical feed.


QUESTION: Install stainless chemical feed piping, valves and gauges for bulk neat feed. In section 2.2 Equipment Requirements it states **The Government will install and maintain feed lines pertaining to all chemical pumps included in this contract**. Just some clarification on whose responsibility this will be?


ANSWER: Feed lines will be the responsibility of the government.


QUESTION: Do you know if liquid for powdered sulfite is required? The other chemicals are all liquid as the unit of measure is gallons, but the sulfite unit of measure is pounds. The problem is that sometimes liquids are priced in pounds also.


ANSWER: Solid sulfite.

Additional QUESTIONS AND ANSWERS
RFQ M67001-16-Q-0040
Steam Plant Chemicals


QUESTION: The main question that we have regarding the bid is about the products you are requesting. I see you show quantities but there is nothing stating the active ingredient and the % active of the products. Can you tell us for each product what that is? Or if you have Safety Data sheets on the
materials we should be able to get the information from there.


ANSWER: The treatments are listed in UFC 3-240-13FN Unified Facilities Criteria Industrial Water Treatment Operation and Maintenance. There may be other information in the ASME documents.
An appendix in the UFC gives examples of these treatments. Some are also available on GSA. SDS forms can be found online at GSA or most chemical treatment sites. They may also be available from boiler manufacturer's sites. We do not have SDS forms from DOD.


The active ingredients are:
•Amine mixture of morpholine, DEAE (Diethylaminoethanol) and cyclohexylamine for steam and condensate pH control
•Sulfite mixture catalyzed, sodium sulfite with sodium metabisulfite as an oxygen scavenger
•Phosphate: a polyphosphate used to precipitate solids in the boiler
•Combined treatment will include all these together or some combination
•Nitrite is typically a nitrite-azole borate combination for hot water heating systems
Concentrations may vary with manufacturer.

Update #3 ·

QUESTIONS AND ANSWERS
RFQ M67001-16-Q-0040
Steam Plant Chemicals


QUESTION: 2 Technical Requirements. b). Sodium sulfite oxygen scavenger - are you requesting a dry or liquid based sulfite? If dry do you have mix tanks? You do want catalyzed sodium sulfite, correct?


ANSWER: We are requesting dry sulfite treatment. Yes, catalyzed sodium sulfite. We have batch tanks for mixing dry sulfite at the larger plants.


QUESTION: Section 2.1.9.4 Weekly. Are routine service visits at a weekly interval? *as an example per month: large steam plants week 1, small steam plants group A week 2, small steam plants group B week 3, hot water boilers (first 20) week 4 *hot water boilers would be checked monthly at 20 site intervals....month 1 - 20, month 2 - 20, month 3 - 20, month 4 - 20, month 5 - 20, month 6 - none (repeat for months 7 - 12 to get the loops checked twice annually)


ANSWER: Routine service visits are weekly for steam plant monitoring and treatment only. We would like our treatment inventory monitored and maintained so that we don't run out of treatment. The example above is good for routine visits. Our current contractor tests the steam supply and condensate return systems at least monthly. This has worked well for us.
We would expect the contractor to inform operations and the chemist of any plant related issues they might find. This may include visiting and testing one or more plants multiple times to help resolve any issues.


Hot water boiler monitoring by the contractor is not included in this contract. This contract covers chemical supply and test kits and reagents for hot water boiler systems.


QUESTION: Section 2.2 Equipment Requirements 2.2.2 - Should these tanks be double walled tanks (self-contained) and will they be located inside or outside?


ANSWER: We currently have both inside and outside tanks. Outside tanks are double walled except where they have secondary containment. Inside or outside tanks installed under this contract should be double walled. The Environmental Management Division MCBCL specifies storage tanks 50 gal. and above be double walled or have secondary containment.


QUESTION: 2.2.3 - How many chemical feed pumps will need to be replaced and are these to be included in the fixed price?


ANSWER: Currently there are no chemical feed pumps that need to be replaced. Price of pumps will be included in the fixed price.

QUESTION: 2.2.4 - How many neat chemical feed tanks and pumps for future small plants will there be and are these to be included in the fixed price?


ANSWER: We have plans for 7 new steam plants to go online in the future. This should include 14 chemical tanks and 14 chemical pumps. These should be included in the fixed price.


 


QUESTION: 2.2.5 - Is the heat tracing to be included in the fixed price and if so is there a specific scope / # locations / etc.?


ANSWER: Heat tracing will be included in the fixed price if required. We have been able in the past to place our treatments inside plants to avoid freezing. We don't have a specific scope or location where heat tracing may be required in the future.


QUESTION: (4) Service. h & j state to provide 8 combined water test kits and 8 conductivity meters, but in 2.1.11 & 2.1.13 it states to provide 6 of each?


ANSWER: Please provide 6 combined test kits and 6 conductivity meters.


QUESTION: (5) Equipment. Do the tanks have to be stainless?


ANSWER: Tanks do not need to be stainless unless required for storage of treatment or required for chemical feed.


QUESTION: Install stainless chemical feed piping, valves and gauges for bulk neat feed. In section 2.2 Equipment Requirements it states **The Government will install and maintain feed lines pertaining to all chemical pumps included in this contract**. Just some clarification on whose responsibility this will be?


ANSWER: Feed lines will be the responsibility of the government.


QUESTION: Do you know if liquid for powdered sulfite is required? The other chemicals are all liquid as the unit of measure is gallons, but the sulfite unit of measure is pounds. The problem is that sometimes liquids are priced in pounds also.


ANSWER: Solid sulfite.

Update #2 ·

Solicitation is attached.

Update #1 ·

Synopsis - M67001-16-Q-0040

The Utilities Division at Marine Corps Base (MCB) Camp Lejeune, NC has a requirement for Steam Plant Chemical maintenance supplies and services.


The Government will solicit (M67001-16-Q-0040) and award this contract using simplified acquisition procedures, in accordance with FAR subpart 13.5. The Government intends to award to the quoter who represents the lowest price technically acceptable to the government. Award will be issued on a firm-fixed purchase order on an all or none basis. This requirement is 100% Small Business set aside, the associated North American Industrial Classification System (NAICS) code for this requirement is 325998, All Other Miscellaneous Chemical Product and Preparation Manufacturing, business size standard is 500 employees. The RFQ documents and incorporates provisions and clauses that are in effect through Federal Acquisition Circular 2005-85, effective 04 January 2016 and DFARS Change Notice (DCN) 20151230, effective 30 December 2015.


The solicitation will be available for download via the electronic data interchange at FedBizOpps, www.fedbizopps.gov, on or about 04 January 2016. It is the responsibility of the quoter to continually view the website for the solicitation and any amendments. Contractors interested in doing business with the government must be registered in the System For Award Management (SAM) database, http://www.sam.gov/ and agree to implement the Department of Defense web-based software application Wide Area Workflow Receipt and Acceptance (WAWF-RA) at https://wawf.eb.mil/. All responsible small businesses may submit an offer, which will be considered.

Files

File Type Posted
Additional_Questions_and_Answers.pdf PDF
Questions_and_Answers_Final.pdf PDF
M67001-16-Q-0040_RFQ.pdf PDF
M67001-16-Q-0040_RFQ.pdf PDF
Synopsis.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors