Station atlantic city external door replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 37050PR26EXTERNALDOORS
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Atlantic City, New Jersey 08401, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Coast Guard seeks removal and replacement of ten exterior doors and frames at Station Atlantic City, with proposals due June 11 and questions due June 10. The procurement is a 100% small business set-aside, foreclosing competition outside that pool.
Place of performance is Atlantic City, New Jersey (Station Atlantic City, 900 Beach Thorofare). The work encompasses nine single exterior door and frame assemblies and one double exterior door and frame assembly on the UPH and Main Buildings. All new doors must be exterior-grade hollow metal or equivalent, corrosion-resistant, and suitable for coastal environments. Hardware includes Kaba Simplex 1000 Series push-button locks at two locations, BEST 7-Pin cylindrical lever locksets at the remaining eight doors, hinges, door closers, panic/exit devices where code-required, thresholds, door sweeps, weatherstripping, and strike plates. All doors receive epoxy paint sprayed white to match the building. One northern door at UPH housing shall have a blank back plate (exit-only configuration). The contractor must complete work within 90 calendar days of notice to proceed, during normal hours (0730–1700, Monday–Friday, excluding federal holidays), and remove all existing doors and debris in accordance with federal, state, and local regulations.
NAICS code is 236220 (Commercial and Institutional Building Construction); PSC is Z2AA. The contract is firm-fixed-price. Performance and payment bonds at 100% of contract price are required within 10 calendar days of award. Contractor must begin work within 5 calendar days of notice to proceed. Davis-Bacon prevailing wage requirements apply. The contractor must submit a detailed employee list five days prior to commencing work and maintain site security throughout the project. Site visits are encouraged and must be arranged with Jon Christiansen (732-300-1060) with a minimum of three business days' notice.
Notice text
4 versions
Update #4 · Latest ·
6/9/2026 - Question 2: The solicitation submission date has changed from the original SF1442 issue date, but we have not seen any revision or addendum. Do we still use the same form?
Answer 2: An SF-1442 "Extension Doc" can be submited with revised proposals. You can find that Extension Doc in the attachments section. Again, if there are NO CHANGES to previous accepted proposals, no resubmission is required.
6/9/2026 - Question 1: Do we need to resubmit our proposal to you?
Answer 1: If you see fit to adjust your proposal with the clarification posted that you believe makes it more competitive, you may. If this clarification doesn’t change your proposal, then no action is needed on your end and all proposals received will be reviewed after this extended closing date.
6/8/2026 - Question: Can you please verify what changes or updates have been made to the SOW, as the description has not changed and no new documents have been added? I look forward to the update. Thank you
Answer: There is no change to the SOW, a clarification on the Q&A section where it was stated the government expected stainless steel doors. That specification has been removed and stainless steel doors are not the only acceptable type. Steel doors with weather proof coating is the requirement.
- As per the SOW, 3.e exterior grade hollow metal doors are to be provided giving mention to consideration for exterior use and corrosion resistance but does not provide clear specification on the desired product. Does the government intend to receive grade 316 stainless steel doors, marine-grade powder coated doors, aluminum doors, or galvanized/zinc-coated steel doors? Answer: 316 stainless steel coated for weather.
- In coordination with the previous question, is it desired for all hardware to be 316 stainless steel where applicable to resist corrosion? Answer: Yes
- As per SOW, 3.f it is requested to provide new push-button door locks handles at all 10 door locations. It was noted at the site visit that this is desired only at two (2) locations. Can you please confirm if all doors shall receive the Kaba Simplex Series locks or only the two? Answer: Two push button style locks
-
- If only the two locks, can you please confirm all others should be a lever lockset with BEST 7-Pin cylinders to match existing? Answer: All other will be lever lock 7-pin to match what is existing
- Should locksets be mortised lockset or cylindrical? Answer: Cylindrical
- Does the government wish to have the northern door at the UPH housing with a lever lockset or blank plate as requested at the site visit? Answer: Blank back plate. Door is exit only
- As per SOW, 3.i, no fire rating was provided for the various doors, does the glazing require a 45-minute fire rating? Answer: no
- It was noted at the site visit that State Historic Preservation Office (SHPO) approvals were required for this project, will any documentation or coordination with SHPO be required from the contractor? Answer: Proposed materials and doors will be reviewed for compliance with SHIPO. During the site visit it was specified that all doors require to be similar or match what is being replaced.
- What will be the limitations of repair around the doors? Answer: It was noted at the site visit there are existing conditions presenting with considerable damage to walls, floors, and surrounds. Clean professional finish. Some require drywall repairs around the frames. Wall finish(paint) is required. Corner to corner of wall.
-
- Will limitations be only to that which is damaged by the replacement of the door? Answer: All doors and finishes are required within reason for the project.
- The SOW currently provides a 90-day performance period from the notice to proceed. Dependent upon the RFI for the type of doors desired, lead times could by themselves exceed this period of performance timeline. Can the POP be extended to allow for material lead times? Answer: I am unable to answer this question as I am not on that level in this process.
- Is there currently existing attic stock for the new exterior siding installed for use in repairs around the doors that would be available for use? Answer: The unit does have spare siding. Unit does not have the trim
Provide all labor, materials, equipment, and supervision necessary to remove and replace all ten (10) existing exterior doors and frames on the UPH and Main Buildings at USCG Station Atlantic City. Details contained within the Scope of Work labeled "SOW STA Atlantic City door replacement".
Update #3 ·
6/8/2026 - Question: Can you please verify what changes or updates have been made to the SOW, as the description has not changed and no new documents have been added? I look forward to the update. Thank you
Answer: There is no change to the SOW, a clarification on the Q&A section where it was stated the government expected stainless steel doors. That specification has been removed and stainless steel doors are not the only acceptable type. Steel doors with weather proof coating is the requirement.
- As per the SOW, 3.e exterior grade hollow metal doors are to be provided giving mention to consideration for exterior use and corrosion resistance but does not provide clear specification on the desired product. Does the government intend to receive grade 316 stainless steel doors, marine-grade powder coated doors, aluminum doors, or galvanized/zinc-coated steel doors? Answer: 316 stainless steel coated for weather.
- In coordination with the previous question, is it desired for all hardware to be 316 stainless steel where applicable to resist corrosion? Answer: Yes
- As per SOW, 3.f it is requested to provide new push-button door locks handles at all 10 door locations. It was noted at the site visit that this is desired only at two (2) locations. Can you please confirm if all doors shall receive the Kaba Simplex Series locks or only the two? Answer: Two push button style locks
-
- If only the two locks, can you please confirm all others should be a lever lockset with BEST 7-Pin cylinders to match existing? Answer: All other will be lever lock 7-pin to match what is existing
- Should locksets be mortised lockset or cylindrical? Answer: Cylindrical
- Does the government wish to have the northern door at the UPH housing with a lever lockset or blank plate as requested at the site visit? Answer: Blank back plate. Door is exit only
- As per SOW, 3.i, no fire rating was provided for the various doors, does the glazing require a 45-minute fire rating? Answer: no
- It was noted at the site visit that State Historic Preservation Office (SHPO) approvals were required for this project, will any documentation or coordination with SHPO be required from the contractor? Answer: Proposed materials and doors will be reviewed for compliance with SHIPO. During the site visit it was specified that all doors require to be similar or match what is being replaced.
- What will be the limitations of repair around the doors? Answer: It was noted at the site visit there are existing conditions presenting with considerable damage to walls, floors, and surrounds. Clean professional finish. Some require drywall repairs around the frames. Wall finish(paint) is required. Corner to corner of wall.
-
- Will limitations be only to that which is damaged by the replacement of the door? Answer: All doors and finishes are required within reason for the project.
- The SOW currently provides a 90-day performance period from the notice to proceed. Dependent upon the RFI for the type of doors desired, lead times could by themselves exceed this period of performance timeline. Can the POP be extended to allow for material lead times? Answer: I am unable to answer this question as I am not on that level in this process.
- Is there currently existing attic stock for the new exterior siding installed for use in repairs around the doors that would be available for use? Answer: The unit does have spare siding. Unit does not have the trim
Provide all labor, materials, equipment, and supervision necessary to remove and replace all ten (10) existing exterior doors and frames on the UPH and Main Buildings at USCG Station Atlantic City. Details contained within the Scope of Work labeled "SOW STA Atlantic City door replacement".
Update #2 ·
- As per the SOW, 3.e exterior grade hollow metal doors are to be provided giving mention to consideration for exterior use and corrosion resistance but does not provide clear specification on the desired product. Does the government intend to receive grade 316 stainless steel doors, marine-grade powder coated doors, aluminum doors, or galvanized/zinc-coated steel doors? Answer: 316 stainless steel coated for weather.
- In coordination with the previous question, is it desired for all hardware to be 316 stainless steel where applicable to resist corrosion? Answer: Yes
- As per SOW, 3.f it is requested to provide new push-button door locks handles at all 10 door locations. It was noted at the site visit that this is desired only at two (2) locations. Can you please confirm if all doors shall receive the Kaba Simplex Series locks or only the two? Answer: Two push button style locks
-
- If only the two locks, can you please confirm all others should be a lever lockset with BEST 7-Pin cylinders to match existing? Answer: All other will be lever lock 7-pin to match what is existing
- Should locksets be mortised lockset or cylindrical? Answer: Cylindrical
- Does the government wish to have the northern door at the UPH housing with a lever lockset or blank plate as requested at the site visit? Answer: Blank back plate. Door is exit only
- As per SOW, 3.i, no fire rating was provided for the various doors, does the glazing require a 45-minute fire rating? Answer: no
- It was noted at the site visit that State Historic Preservation Office (SHPO) approvals were required for this project, will any documentation or coordination with SHPO be required from the contractor? Answer: Proposed materials and doors will be reviewed for compliance with SHIPO. During the site visit it was specified that all doors require to be similar or match what is being replaced.
- What will be the limitations of repair around the doors? Answer: It was noted at the site visit there are existing conditions presenting with considerable damage to walls, floors, and surrounds. Clean professional finish. Some require drywall repairs around the frames. Wall finish(paint) is required. Corner to corner of wall.
-
- Will limitations be only to that which is damaged by the replacement of the door? Answer: All doors and finishes are required within reason for the project.
- The SOW currently provides a 90-day performance period from the notice to proceed. Dependent upon the RFI for the type of doors desired, lead times could by themselves exceed this period of performance timeline. Can the POP be extended to allow for material lead times? Answer: I am unable to answer this question as I am not on that level in this process.
- Is there currently existing attic stock for the new exterior siding installed for use in repairs around the doors that would be available for use? Answer: The unit does have spare siding. Unit does not have the trim
Provide all labor, materials, equipment, and supervision necessary to remove and replace all ten (10) existing exterior doors and frames on the UPH and Main Buildings at USCG Station Atlantic City. Details contained within the Scope of Work labeled "SOW STA Atlantic City door replacement".
Update #1 ·
Provide all labor, materials, equipment, and supervision necessary to remove and replace all ten (10) existing exterior doors and frames on the UPH and Main Buildings at USCG Station Atlantic City. Details contained within the Scope of Work labeled "SOW STA Atlantic City door replacement".
Files
| File | Type | Posted |
|---|---|---|
| SF-1442_STA AC EXT. DOORS_Extension Doc.pdf | ||
| SOW STA Atlantic City door replacement.pdf | ||
| SF-1442_STA AC EXT. DOORS.pdf | ||
| Construction RFQ Clause Template.pdf | ||
| Wage Determinations_NJ_Atlantic County.txt | TXT text file | |
| SF-1442_STA AC EXT. DOORS.pdf | ||
| SOW STA Atlantic City door replacement.docx | DOCX document | |
| Construction RFQ Clause Template.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Station atlantic city external door replacement | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WV-canaan VLY NWR-VC ADA doors | — | Total Small Business | |
| EC-ECAO Exterior Door Replacement | — | Total Small Business | |
| WJHTC Armed Security Guard Services | Technical Center | Competitive 8(a) |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity