This is a Pre-Solicitation Notice from the Bureau of Land Management (BLM) for a construction project to reconstruct boundary fencing at the San Pedro Riparian Conservation Area (SPRNCA) in Cochise County, Arizona. The solicitation number is 140L0625B0003 and will be issued as an Invitation for Bid around January 3, 2025, with proposals due 30 days after issuance.
The project involves five phases of fence reconstruction totaling 28.21 miles (Phase 1B: 6.86 miles, Phase 1C: 8 miles, Phase 1D: 4.84 miles, Phase 2B: 3.87 miles, and Option-Phase 3A: 5 miles). The work includes vegetation clearing, T-post installation, stress/stretch/end/corner panels, panel gate installation, and removal of non-functioning fence materials. The estimated value is between $1M-$5M with a 455-day period of performance. This is a total small business set-aside under NAICS code 238990 with a $19M size standard. Contractors must have an active SAM registration and UEI number. A site visit will be conducted 1-2 weeks after RFP issuance. Draft specifications and drawings are included for comment, with the government reserving the right to use submitted comments without restriction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_SPRNCA_II_Boundary_Fence_Specs_-_Sept17_2024_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
National Operations Center
Denver Federal Center, Building 85 P.O. Box 25047
Denver, Colorado 80225-0047 http://www.blm.gov
Pre-Solicitation Notice 18 December 2024
Solicitation Number: 140L0625B0003 (Invitation for Bid) Project Identification: San Pedro Riparian Conservation Area (SPRNCA) Boundary Fence Reconstruction Phase 1B, 1C, 1D, 2B and Option 3A Point of Contact: Paula Johnson, Contracting Officer, pjohnson@blm.gov Project Location: Multiple Locations Within SPRNCA, Cochise County, AZ Magnitude of Construction: Between $1M – $5M Estimated Period of Performance: 455 calendar days after issuance of the notice to proceed North American Industry Classification System (NAICS) Code: 238990 – All Other Specialty Trade Contractors Produce Service Code: Z2PZ – Repair or Alteration of Other Non-Building Facilities Small Business Size Standard: $19.M Solicitation Set-Aside: Total Small Business – Only companies that qualify as a small business under the applicable size standard will be considered.
Solicitation Issuance Date: The BLM anticipates issuing a subsequent request for proposals (RFP) on or around 3 January 2025.
Proposal Submission Deadline: Exact date unknown at this time / 30-days after the issuance of the RFP.
Registration Requirements: Prospective offerors must have a Unique Entity ID (UEI) and an active System for Award Management (SAM) profile to included completed representations and certifications.
https://sam.gov/content/home Site Visit: Yes – Approximately 1-2 weeks after the issuance of the RFP. Refer to FAR provision 52.236-27 within the subsequent solicitation.
Project Description: The Bureau of Land Management (BLM) has a construction requirement in Cochise County, Arizona for five phases of the San Pedro Riparian National Conservation Area (SPRNCA) boundary fence reconstruction and maintenance project to conserve, protect, and enhance the SPRNCA conservation values outlined in Public Law 100-696. The total mileage for these five phases is 28.21 miles. All distances in this document are estimates only.
1. Phase 1B -- approximately 6.86 miles
2. Phase 1C -- approximately 8 miles
3. Phase 1D -- approximately 4.84 miles
4. Phase 2B -- approximately 3.87 miles
5. Option-Phase 3A -- approximately 5 miles
Reconstruction of the fence will include vegetation clearing; installation of T-posts; stress, stretch, end and corner panels; installation of panel gates; and removal of non-functioning and remnant fence or unused fence materials. Equipment needed to implement construction may include trucks, equipment trailer, UTV, skid steer loader (hydraulic driver, possibly mower, bucket), backhoe or excavator, and/or pneumatic drivers.
mailto:pjohnson@blm.gov https://sam.gov/content/home
Additional Information: Specification and drawings have been included with this notice. All documentation is considered to be in a DRAFT format and has been provided for comment. Comments received may be used to make corrections, revisions, and/or other requirement changes depending on the nature and type of information received. Any comments provided shall be considered public information and the government reserves the right to use the information provided without restriction.
| BUREAU OF LAND MANAGEMENT |
| National Operations Center |
| Denver Federal Center, Building 85 |
| P.O. Box 25047 |
| Denver, Colorado 80225-0047 |
| http://www.blm.gov |
File details come from the government source that posted it. Updated .