Spire missouri INC. Gas line relocation

Closed Special Notice Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912P923R0016
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Hazelwood Missouri 63042 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This Special Notice from the USACE St Louis District concerns the sole source contracting of relocating a 16-inch diameter natural gas line owned by SPIRE Missouri, Inc. The agency intends to relocate approximately 4,410 linear feet of 16-inch steel gas main and install additional gas lines along McDonnell Boulevard from a facility entrance to an intersection.

The notice provides details for SPIRE Missouri, Inc. to relocate the gas main from the north to the south side of McDonnell Boulevard, including abandoning existing lines. SPIRE has indicated the work will require a seven-month duration to procure materials, prepare the site, perform field work and installation, and abandon pipe sections. There is no set-aside designated and the deadline for the sole source contract is June 1, 2023. The Special Notice was issued to provide public notice of the agency's intent to award a sole source contract directly to SPIRE Missouri, Inc. as the owner and operator of the gas lines due to the specific requirements of the project.

Notice text

USACE St Louis District intends to sole source the following action, in accordance with FAR 6.302-1.

Relocate a 16 in. diameter SF natural gas line main from the North side of McDonnell Blvd. to the South side of McDonnell Blvd. Remediation will be performed at the McDonnell Bridge over Coldwater Creek and at McDonnell Blvd. from the east end parking lot entrance of the Guest, Keen & Nettlefolds  (GKN) Aerospace North America Inc. to the intersection of Eva Road and McDonnell Blvd.  The St. Louis County, Missouri, agreed to provide a road closure to facilitate the remediation effort at and around the bridge over Coldwater Creek and along this alignment of McDonnell Blvd. This natural gas line is owned and controlled by SPIRE Missouri, Inc.

A more concise description on the relocation of the 16-inch diameter steel main will be as follows:

Install 4,410 linear feet of 16 in. Steel  (ST) SF Main on the South side of James S. McDonnell Blvd. 

Install 110 linear feet of 8 in. ST SF Main and Install 180 linear feet of 2 in. ST SF Main

along the south side of James S. McDonnell Blvd.  Abandon 3,910 linear feet of 16 in. ST SF Main

and 95 linear feet of 8 in. ST SF Main along the north side of James S. McDonnell Blvd.

SPIRE Missouri Inc. has indicated that it will require a seven-month duration. It includes but is not limited to procurement of material, site preparation, field work, installation, and abandonment of pipe.

Notice history

Notice Type Posted
Spire missouri INC gas line relocation Award Award Notice
This notice Latest special notice Special Notice
Spire missouri INC. Gas line relocation Pre-Solicitation
Notice of Intent Original Special Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity