About this opportunity

The Special Notice from the USACE St Louis District announces their intent to sole source a contract to relocate a 16 inch diameter natural gas line main from the north to the south side of McDonnell Boulevard in St. Louis County, Missouri. The relocation will require installation of over 4,400 linear feet of 16 inch steel pipe and additional smaller pipes, as well as abandonment of existing pipes, and is expected to take approximately six months to complete.

The purpose of the sole source contract is to facilitate remediation work around the McDonnell Boulevard bridge over Coldwater Creek and along the roadway from an east parking lot entrance to the intersection with Eva Road. Contractors must be able to complete procurement, site preparation, installation, and abandonment activities. Only Spire Missouri Inc. qualifies for this contract as they own and control the natural gas lines requiring relocation. The Special Notice establishes a deadline of May 15, 2023 for completion of the work and is being issued by the USACE St Louis District on behalf of the Department of the Army Corps of Engineers.

Notice text

USACE St Louis District intends to sole source the following action, in accordance with FAR 6.301-1(a)(2).  This authority is appropriate for the application of utility services in accordance with FAR 6.302-1(b)(3). 

Relocate a 16 in. diameter SF natural gas line main from the North side of McDonnell Blvd. to the South side of McDonnell Blvd. Remediation will be performed at the McDonnell Bridge over Coldwater Creek and at McDonnell Blvd. from the east end parking lot entrance of the Guest, Keen & Nettlefolds (GKN) Aerospace North America Inc. to the intersection of Eva Road and McDonnell Blvd. The St. Louis County, Missouri, agreed to provide a road closure to facilitate the remediation effort at and around the bridge over Coldwater Creek and along this alignment of McDonnell Blvd.  This natural gas line is owned and controlled by Spire Missouri inc.

A more descriptive service on the relocation of the 16-inch diameter steel main will be as follows:

Install 4,410 linear feet of 16 in. Steel (ST) SF Main on the South side of James S. McDonnell

Blvd. Install 110 linear feet of 8 in. ST SF Main and Install 180 linear feet of 2 in. ST SF Main

along the south side of James S. McDonnell Blvd. Abandon 3,910 linear feet of 16 in. ST SF Main

and 95 linear feet of 8 in. ST SF Main along the north side of James S. McDonnell Blvd.

SPIRE Missouri Inc. has indicated that it will require a six-month duration. It includes but not limited to procurement of material, site preparation, field work, installation, and abandonment of pipe.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Spire missouri INC gas line relocation Award Award Notice
Spire missouri INC. Gas line relocation Latest special notice Special Notice
Spire missouri INC. Gas line relocation Pre-Solicitation
Notice of Intent This notice · Original Special Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity