Spire missouri INC. Gas line relocation
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- W912P923R0016
- Agency
-
ENDIST St Louis
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237120 Oil and Gas Pipeline and Related Structures Construction
- Place of performance
- Hazelwood, Missouri 63042, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Engineering District St. Louis seeks proposals to relocate a 16-inch diameter gas main along McDonnell Boulevard in Missouri to facilitate remediation under the Formerly Utilized Sites Remedial Action Program. Interested offerors must have experience relocating large diameter gas lines and be able to complete the work within the required timeline. Proposals will be evaluated based on technical approach, past performance, and price. The deadline for proposals is April 17, 2023.
There is no set-aside designated for this procurement. The NAICS code is 237120 and PSC code is R499. The pre-solicitation notice does not provide any budget ranges or identify incumbent contractors. Relocating the 16-inch gas main will require moving it from the north side of McDonnell Boulevard to the south side for approximately 1 mile to allow remediation at the McDonnell Bridge over Coldwater Creek and along McDonnell Boulevard from the Guest, Keen & Nettlefolds parking lot entrance to Eva Road.
Notice text
Relocate a 16 in. diameter SF main from the North side of McDonnell Blvd. to the South side of McDonnell Blvd. to facilitate Formerly Utilized Sites Remedial Action Program (FUSRAP) remediation. Remediation will be performed at the McDonnell Bridge over Coldwater Creek and at McDonnell Blvd. from the east end parking lot entrance of the Guest, Keen & Nettlefolds (GKN) Aerospace North America Inc. to the intersection of Eva Road and McDonnell Blvd. The St. Louis County has provided an agreement with USACE STL-FUSRAP to provide a road closure to facilitate the remediation effort at and around the bridge over Coldwater Creek and along this alignment of McDonnell Blvd.
NOTE: The NAICS code and PSC code have changed and are reflected in this notice.
*****PLEASE READ ALL ATTACHMENTS****
Files
| File | Type | Posted |
|---|---|---|
| W912P923R0016.pdf | ||
| JandA FAR Part 6 (MAR 2022)-SPIRE_approved.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Spire missouri INC gas line relocation | Award Notice | |
| Spire missouri INC. Gas line relocation | Special Notice | |
| This notice | Pre-Solicitation | |
| Notice of Intent | Special Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity