Special Warfare Training Wing (SWTW) Rotary Wing Airlift Support
Closed Pre-Solicitation Posted
- Solicitation number
- FA3002SWTWRotaryWing
- Agency
-
Air Education and Training Command
Air Force, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 481211 Nonscheduled Chartered Passenger Air Transportation
- PSC
- Not on record
- Place of performance
- San Antonio, Texas, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Air Education and Training Command (AETC) within the Department of the Air Force is seeking rotary wing airlift support services through the Special Warfare Training Wing (SWTW) located at Joint Base San Antonio-Lackland, Texas. The procurement involves providing helicopter aircraft, personnel, equipment, fuel, and maintenance to conduct air support training for pararescue jumpers (PJ), combat controller specialists (CCT), combat rescue officers (CRO), and special tactics officers (STO) across multiple U.S. locations. Key contract requirements include FAA/AMC CARB certified rotary wing aircraft capable of day and night operations with a minimum 95% operational availability rate, pilots with at least 200 flight hours in type and current FAA commercial licenses, and the ability to conduct various insertion/extraction operations including static line jumps, military free fall, hoist operations, and fast rope insertions at altitudes up to 12,000 feet. The contractor must demonstrate comprehensive safety compliance, OSHA adherence, zero airworthiness directive discrepancies, and 100% student completion of Career Field Education and Training Plan requirements. This is a Request for Information (RFI) only issued on March 17, 2026, with responses due by March 31, 2026, and does not constitute a commitment to issue a formal Request for Proposal.
This procurement includes no set-aside designations and does not identify any current contractors or incumbents in the documentation provided. The baseline contract requirement consists of 585 annual flight hours for operational (wet blade) missions and 185 ferry hours, with the Government reserving the right to adjust flight hours by up to 15% annually with 60-day notice. Operations will be conducted primarily at Pope Army Airfield/Fort Bragg/Camp Mackall in North Carolina, Lake Havasu in Arizona, and Kirtland Air Force Base and Belen Regional Airport in New Mexico, with alternate locations in Florida and Texas. Normal operating hours are Monday through Friday with maximum 12-hour daily operations, requiring minimum 12-hour crew rest periods prior to duty. The contractor must deliver multiple documentation items including a project kick-off meeting agenda within 15 days of award, a final Quality Control Plan within 15 days post-kick-off, a Risk Mitigation Plan, and trip reports within one week of each operational support mission. No specific award value or budget range is provided in this pre-solicitation notice.
Notice text
REQUEST FOR INFORMATION
SPECIAL WARFARE TRAINING WING
ROTARY WING AIRLIFT SUPPORT
17 March 2026
1.0 Description
1.1 The Special Warfare Training Wing (SWTW) is seeking information on how interested contractors would provide services necessary to conduct aircraft lift support to the Special Warfare Air Force Sustainment Center’s (AFSC) Career Field Education and Training Plan (CFETP) schoolhouses. The purpose is to ensure that all required Pararescue Jumpers (PJ) / Combat Controller Specialist (CCT) / Combat Rescue Officer (CRO) / Special Tactics Officers (STO) candidates receive required air support. In both day and night, land and water, this training supports:
- Static Line (SL)
- Military Free Fall (MFF)
- Helocast
- Fast Rope Insertion/Extraction System (FRIES) / Special Patrol Insertion/Extraction System (SPIES)
- Overwater Operations
- Hoist Operations
- Medevac Training
- Mission Planning
- Real-world support to medical emergencies (life, limb, eyesight, or urgent transport during training iterations)
All of these support services serve as instruction to complete the curriculum requirements provided in the CFETP.
1.2 An effective solution must provide all services necessary to conduct aircraft lift support as mentioned in Section 1.1 and also in the attached Draft PWS for Rotary Wing. Additionally, the contractor shall provide all services necessary to conduct aircraft lift support for AETC assigned SW instructors to meet parachuting and aircrew related training/proficiency requirements. The aircraft shall be provided to the Government fully configured for the scheduled operations. All hardware connected to the aircraft will be Contractor-configured and provided to the activity supported.
1.3 THIS IS A REQUEST FOR INFORMATION (RFI) ONLY. This RFI is issued solely for information and planning purposes – it does not constitute a Request for Proposal (RFP) or a promise to issue an RFP in the future. This request for information does not commit the Government to contract for any supply or service whatsoever. Further, the Air Force is not seeking proposals at this time and will not accept unsolicited proposals. Respondees are advised that the Government will not pay for any information or administrative costs incurred in response to this RFI; all costs associated with responding to this RFI will be solely at the interested party's expense. Not responding to this RFI does not preclude participation in any future RFP, if any is issued.
2.0 Background
Current DoD military training air support does not have the capacity to support DoD, AETC training requirements. Additionally, military air support is tasked with operational requirements that prevent consistent access to training assets. This makes it increasingly difficult to schedule and plan training with local assets that have higher operational priorities resulting in the inability to meet training requirements.
- 2.1 Limitations: Vendor must be able to travel and meet the deliverables as set forth in the Performance Work Statement (PWS).
- 2.2 Security Requirements: There are no classified information requirements.
3.0 Purpose
This effort focuses on the technical solution to conduct airlift support for Rotary Wing Aircraft IAW the attached Draft PWS (Rotary Wing).
4.0 Response Format
4.1 Please provide answers for each of the following questions, utilizing the existing numbering scheme for each response and limiting your total response for this RFI to no more than four (4) pages. All interested parties are invited to provide the following information:
- Company Name, Commercial and Government Entity (CAGE) Code and Unique Entity ID (UEI) Number.
- Point of Contact (to include phone and email).
- Website URL, if applicable.
- State if your company is SAM registered under NAICS code 611512.
- State whether your firm is large, small business, small disadvantaged business (SDB), 8(a)-certified small business, historically underutilized business zone (HUBZone) small business, veteran-owned small business (VOSB), service-disabled veteran-owned small business (SDVOSB), woman-owned small business (WOSB) based upon the for North American Industry Classification System (NAICS) code 611512.
- Can your company meet all the description of supplies/services task described in the attached draft performance work statements (PWS)?
- What specific experience does your company have that would be applicable to the requirements stated in the draft PWS?
- Detail your approach to maintaining and supporting aircraft lift support.
- Describe your previous experience providing rotary-wing support services. Include the contract number and contracting agency and provide a POC at that agency if possible.
- How would your company transition from the current contractor to ensure no interruption in services? Please address the transfer of knowledge, data, and systems.
- What if any risk or unknowns would hinder your ability to meet the requirement?
- Should the Government consider a different NAICS for this requirement?
- If your company is on a GSA schedule, please provide your contract number, labor categories, and rates that are applicable to the scope of work described in the draft PWS.
- Do you see an innovative solution to providing rotary-wing support?
- Aircraft Fleet and Configuration: Please provide a comprehensive list of the specific aircraft (including make, model, and year) you propose to use for the rotary-wing requirements. Describe how your proposed fleet meets the specific airframe and configuration requirements detailed in the PWS, including FRIES/SPIES capability, hoist, and litter configurations.
- Aircraft Certification and Compliance: What is the current certification status of your proposed aircraft fleet? Are your aircraft and crew certified for overwater and NVG operations IAW FAA and/or DoD regulations?
- Personnel Qualifications and Specialized Experience: Describe your methodology for recruiting, training, and retaining personnel who meet the specific qualifications in the PWS. How do you ensure your pilots and aircrew possess demonstrated experience with the following military-specific operations: Helocast, FRIES/SPIES, hoist, static line, and MFF operations?
- Logistics for Geographically Dispersed Operations: Describe your logistical framework for managing and executing simultaneous flight operations at the geographically separated primary locations identified in the PWS (e.g., North Carolina, Florida, Arizona). How will you manage crew scheduling, maintenance, and aircraft positioning to ensure consistent and reliable support across all required locations?
- Maintenance and Aircraft Availability: The PWS requires providing a replacement aircraft within 36 hours in case of a maintenance issue. Please detail your specific plan to meet this requirement. Your plan should address the basing locations for replacement aircraft, your maintenance philosophy for maximizing availability, and the logistics of deploying a replacement aircraft and crew to any of the operating locations within the 36-hour timeframe.
- Surge and Scalability Plan: The PWS indicates a potential for significant student load variations. Describe your company's capacity and plan to scale your operations to accommodate both long-term surges and short-term fluctuations in student numbers. How would this affect your proposed fleet, personnel, and maintenance plans?
4.2. The Government reserves the right to decide whether or not a SB set-aside is appropriate based on responses to this notice. In order for the Government to make a SB set-aside determination, it is emphasized that SB concerns provide sufficient written information to indicate their capability to successfully perform and manage all the requirements of this magnitude.
4.3 All interested firms that possess the capabilities and capacities addressed herein are encouraged to respond to the notice by providing the information specified above no later than 12:00 PM (CST), on 31 March 26. Information shall be provided via e-mail in either Microsoft Word and/or Microsoft PowerPoint. Forward your responses regarding this RFI to the POCs identified below.
5.0 Industry Discussions
SWTW representatives may or may not choose to meet with respondees. Such discussions would only be intended to get further clarification of potential capability to meet the requirements, especially any development and certification risks.
6.0 Questions
Questions regarding this announcement shall be submitted in writing by email to Mr. Kevin Harris at kevin.harris.58@us.af.mil. Verbal questions will NOT be accepted. Questions SHALL NOT contain proprietary or classified information. Answers to questions will be shared with all respondees. The Government does not guarantee that questions received after 31 March 26 @ 1200 CST will be answered.
Files
| File | Type | Posted |
|---|---|---|
| Draft PWS Rotary Wing Airlift CAO 3 2 26.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| CSO - U. S. Army Aviation Training | ACC Redstone | No set-aside | |
| C-208/PC-12 Special Missions Aircrew & Maintenance Training | Air Education and Training Command | No set-aside | |
| C-208 and PC-12 Special Missions Training | Air Education and Training Command | No set-aside | |
| Airborne Special Operations Testing Directorate Wet Blade Hours IDIQ | Mission and Installation Contracting Command | Total Small Business | |
| RFI Contractor F-16 Pilot Services | AFLCMC Hill AFB | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity