SOURCES SOUGHT MARKET SURVEY - Asbestos Abatement - QKK Air Route Surveillance Radar Site - Koke'e State Park, Kauai HI
Closed Pre-Solicitation Posted
- Solicitation number
- 6973GH-26-R-45729
- Agency
-
Franchise Acquisition Servies
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 562910 Remediation Services
- PSC
- Not on record
- Place of performance
- Hanapepe, Hawaii 96716, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Aviation Administration is soliciting sources for asbestos abatement services at the QKK Air Route Surveillance Radar Site located in Koke'e State Park, Kauai, Hawaii. The project requires comprehensive removal of asbestos-containing materials (ACM) from three buildings, replacement of 26 windows, installation of regulatory signage, and complete site restoration, with all work performed by a qualified Hawaii-licensed asbestos contractor. Key requirements include strict adherence to OSHA regulations, Davis Bacon Act compliance, submission of a comprehensive safety plan, coordination with FAA personnel to ensure no interference with 24/7 facility operations, and proper disposal of all project waste. The pre-solicitation notice indicates that a site visit was scheduled for January 13, 2026, from 10 AM to 2 PM Hawaii time to allow potential contractors to assess conditions, and interested parties must submit inquiries or indicate interest by the January 30, 2026 deadline. Contractors must comply with access restrictions, store materials only in FAA-approved areas, and obtain approval at least 24 hours in advance for any operational outages or access requirements.
This procurement is not using any set-aside designations and no incumbent contractor information is provided in the pre-solicitation notice. The scope of work involves removal of approximately 6,228 square feet of asbestos-containing floor tiles and joint compound, with the asbestos survey identifying materials containing 2-7% chrysotile in non-friable form across Buildings 1, 5, and 10. While specific contract award values are not disclosed in the pre-solicitation notice, the Independent Government Cost Estimate template and wage determination documents indicate the FAA has conducted preliminary budget planning using Davis Bacon wage rates applicable to Hawaii construction trades, including Asbestos Workers/Insulators classifications. The project was originally scheduled for October 2025; however, the January 2026 pre-solicitation date suggests the timeline has been adjusted, and contractors should anticipate coordinated scheduling that may require after-hours work to minimize disruption to active radar operations. This is categorized under NAICS 562910 (Remediation Services), reflecting the environmental remediation nature of the asbestos abatement work.
Notice text
SITE VISIT SCHEDULED ON LOCATION ON 13 JANUARY 2026 FROM 10AM-2PM HAWAII TIME
The Davis Bacon Act will apply. All other applicable clauses per the QVL will apply and all applicable clauses will be present in the contract once awarded.
1.0 GENERAL SCOPE
The selected Contractor shall furnish all labor, product, equipment, materials, and supervision for the planning and execution associated with the QKK (Koke’e) Asbestos Abatement Project at the Radar site located within Koke’e State Park in Kauai, Hawaii. The extent of the work will be specific to certain areas outlined within this package.
The following items are a summary of the project and are provided solely for the purpose of describing the general nature of the work. The Contractor is responsible for accomplishing all items of work identified in the applicable drawings, specifications, and provisions of the contract:
A. General
1. QKK ARSR is an active facility that supports operations 24 hours a day, 7 days a week.
2. All work shall be coordinated with the FAA and be accomplished on a “Not to interfere with operations” basis.
3. Any outages or access restrictions shall be approved at least 24 hours prior to the associated work
4. Construction material shall be stored only in FAA approved areas.
5. Construction staging shall be allowed only in the FAA approved areas.
6. The Contractor shall provide all temporary services required for construction.
7. The Contractor shall clean up and restore the site grounds to its original condition after the work has been performed and properly dispose of any project waste.
8. The site has access restrictions, and contractor shall comply with facility requirements. This may include providing a list of employees for access prior to beginning work. All access requirements will be coordinate through the project COR/Implementer.