This document is an Independent Government Cost Estimate (IGCE) for an Asbestos Abatement Project at the QKK Air Route Surveillance Radar Site located in Koke'e State Park, Kauai, Hawaii. The project involves comprehensive asbestos removal and restoration services for multiple buildings, with specific tasks including removal of 6,228 square feet of materials, window abatement (26 windows), drywall restoration, flooring work, and site clean-up. The project is for the Federal Aviation Administration (FAA), with the work to be performed on an active facility that operates 24/7, requiring careful coordination to minimize operational disruptions.

The cost estimate template shows zero dollar amounts for labor and material costs, suggesting this is a preliminary planning document. Key project requirements include coordinating all work with the FAA, obtaining advance approval for any operational outages, storing materials only in approved areas, providing temporary construction services, and ensuring complete site restoration post-project. The site visit is scheduled for 13 January 2026 from 10 AM to 2 PM Hawaii time, and the project will be subject to the Davis Bacon Act. The solicitation is currently in the pre-solicitation phase with the solicitation number 6973GH-26-R-45729.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roll-Up

SAMPLE IGCE FORMAT FOR LABOR HOUR OR TIME & MATERIALS CONTRACT/ORDER
Enter data in highlighted sections only.
Direct Costs by CategoryIndividual BLDG. TotalLoaded* Hourly Rate/ Overall # Bldgs.Total
Project Administrative Costs$ - 0x$ 1.00=$ -
Building 1 Costs$ - 0x$ 1.00=$ -
Building 5 Costs$ - 0x$ 1.00=$ -
Building 10 Costs$ - 0x$ 1.00=$ -
Remote Location Adjustment$ - 0x$ 1.00=$ -
x=$ -
x=$ -
x=$ -
x=$ -
x=$ -
x=$ -
Labor
Subtotal$ -
Direct Material (if any)
Purchased Parts and Supplies$ -
*Other MaterialWindows
Direct
Material
Subtotal$ -
AMS Variance, if applicable,$ -
(15% Direct Material Subtotal)
Enter percentage in the space:0%
TOTAL ESTIMATED CELING PRICE$ -
(Labor+Direct Material+ Material Handling)
*Loaded hourly rates (also referred to as burden rates) include wages, overhead, general and administrative expenses
and profit.

IGCE for SOA 45729 Koke’e, HI Asbestos Abatement Project

Office Title: FAALC
As the preparer of this IGCE, I acknowledge that the IGCE was developed independently and in accordance
with AMS Guidance T3.2.3A.2 Independent Government Cost Estimate.
Prepared By: Keith Bradley
Signature: ___________________________
Date:_____________________________

** Repeat for each option year. "FOR OFFICIAL USE ONLY"

Title of Requirement: SOA 45729 Koke’e, HI Asbestos Abatement Project Program Office: AJW-L511 Solicitation/Contract #: TBD

Abatement.Restoration

SOA 45729 Koke’e, HI Asbestos Abatement/Restoration Project Breakdown"FOR OFFICIAL USE ONLY"
Administration Costs/Labor ClassificationNumber of Laborers/UnitsTotal Estimated Hours for each Labor ClassStraight Time Hours
(S*D)Straight Time RateStraight Time Cost (F*G)Over Time Hours
(D-F)Over Time RateOver Time Cost (I*J)Total Labor Cost (F+I+L)
Management/Planning10.000.00$0.00$0.000.00$0.00$0.00$0.00
Superintendant/Onsite Oversight10.000.00$0.00$0.000.00$0.00$0.00$0.00
Site Surveys/Travel20.000.00$0.00$0.000.00$0.00$0.00$0.00
Mobilization10.000.00$0.00$0.000.00$0.00$0.00$0.00
FAA AJW-L511 COR Project Oversight10.000.00$0.00$0.000.00$0.00$0.00$0.00
FAA AJW-L511 COR Project Oversight Travel20.000.00$0.00$0.000.00$0.00$0.00$0.00
Site Clean-Up10.000.00$0.00$0.000.00$0.00$0.00$0.00
CAI/JAI10.000.00$0.00$0.000.00$0.00$0.00$0.00
If more labor is needed - insert line here
SPECIFIC REQUIREMENTS LABOR TOTALS0.000.00$ - 00.000.00$0.00
Abatement (All Buildings)
Abatement (Base - Building 1)
Removal (Sf)62280.00$0.00$0.000.00$0.00$0.00$0.00
Other Removal Costs62280.00$0.00$0.000.00$0.00$0.00$0.00
Windows (Abatement)260.00$0.00$0.000.00$0.00$0.00$0.00
Restoration (Base - Building 1)
Clean960.00$0.00$0.000.00$0.00$0.00$0.00
Drywall10.00$0.00$0.000.00$0.00$0.00$0.00
Flooring10.00$0.00$0.000.00$0.00$0.00$0.00
Consumables10.00$0.00$0.000.00$0.00$0.00$0.00
Windows260.00$0.00$0.000.00$0.00$0.00$0.00
Signage (Building 5)10.00$0.00$0.000.00$0.00$0.00$0.00
Signage (Building 10)10.00$0.00$0.000.00$0.00$0.00$0.00
Total$0.00
Remote Location Price Adjustment 25-30%$0.00
TOTALS0.00$ - 0$ - 0$ - 0$0.00