Smart Manufacturing
Closed Solicitation Posted
- Solicitation number
- OSW26BZ06-DV032
- Agency
-
Office of the Secretary of Defense
Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology)
- More information
Notice details come from DoD SBIR/STTR (DSIP). Updated .
About this opportunity
The Office of the Secretary of Defense, through its FutureG Office, seeks Phase II SBIR proposals under topic OSW26BZ06-DV032, "Smart Manufacturing," for a fully open-source private 5G network platform, and proposals were due October 21, 2026. The Set Aside is Total Small Business. The topic accepts only Direct-to-Phase II proposals and requires Feasibility Documentation demonstrating completed Phase I-equivalent work.
The 18-month effort will design, validate, and demonstrate a vendor-neutral platform integrating OCUDU, SD-Core, SD-RAN, and OSC components, with zero proprietary core, RIC, or SMO components. Proposers must address at least two of four use cases: AGV/AMR connectivity and mobility, machine vision backhaul, connected-worker safety, and secure outdoor yard and logistics coverage. Performance targets include sub-30 millisecond threshold latency for machine-vision backhaul (sub-15 millisecond objective), 99.5% handover success at operational AGV/AMR speeds, and five-nines availability for safety-critical services. Fully loaded single-plant deployment cost has a threshold of $250,000 and an objective of $100,000. Phase II funding is capped at $2,153,927 over 18 months, and technical and business assistance is available up to $50,000.
Milestones are a kickoff and Technical Integration Meeting at Month 1, Critical Design Review at Month 12, prototype demonstration at Month 16, and final Phase II report at Month 18. The technology targets commercial small and medium-sized manufacturers and Department of War-affiliated depots, maintenance facilities, and logistics operations. Submission runs through the DoW SBIR/STTR Innovation Portal (DSIP). Required volumes include a technical volume, cost volume, Company Commercialization Report, and Foreign Affiliations disclosure. Projected CMMC requirement is Level 2 (Self). Proposals are evaluated under DoW solicitation criteria, with no weighting stated.
Notice text
DoD SBIR topic OSW26BZ06-DV032
Component: OSD
Command: FUTUREG
Phase: SBIR Program Phase II Action
Technology Areas: Information Systems
Focus Areas: Advanced Infrastructure & Advanced Manufacturing; FutureG; Sustainment & Logistics
Keywords: Smart Manufacturing; AI; Robotics; Smart Factories; Industry 4.0; 5G Connected Warehouse
ITAR: No
CMMC: Level 2 (Self)
Objective:
The objective of this Phase II effort is to design, validate, and demonstrate a fully open-source, private 5G network platform for smart manufacturing that integrates OCUDU, SD-Core, SD-RAN, and OSC components into a secure, vendor-neutral architecture. This platform will deliver highly reliable, low-latency connectivity to support autonomous robotics, machine vision, and connected-worker safety, providing a cost-effective, FutureG-ready solution for both commercial manufacturers and dual-use defense logistics facilities.
Description:
The realistic near-to-mid-term serviceable addressable market for private 5G among U.S. small and medium-sized manufacturers is not "all manufacturers." It is the subset with real mobility, reliability, coverage, or security pain: plants using automated guided vehicles (AGVs), autonomous mobile robots (AMRs), machine vision, connected workers, outdoor yards, large indoor spaces, or metal-heavy RF environments. Manufacturing is already among the leading sectors for private mobile network deployments worldwide, and published case studies show double-digit productivity gains and lower infrastructure capex versus Wi-Fi deployments. Based on data compiled by the National Association of Manufacturers, roughly 50,000 U.S. manufacturing firms fall in the 20-99-employee band alone, with several thousand more in the 100-250 range.
This segment buys on simplicity, speed, fit, and economics, not on global platform standardization, and its stated barriers to adoption are consistent and compounding: ROI ambiguity, legacy equipment and retrofit costs, spectrum and regulatory fragmentation, uneven device ecosystems, IT/OT integration complexity, in-house skills shortages, and tight capital budgets. A proprietary platform from a tier-one vendor addresses almost none of these barriers directly; it is priced and supported for large campuses and multi-site accounts, not a single plant with one connectivity problem to solve.
An all-open-source stack removes the structural cost and lock-in that makes proprietary platforms a poor fit for this segment. Because OCUDU's O-CU/O-DU communicate with the rest of the network over open, standardized interfaces (especially the O-RAN 7.2x split to the O-RU), the network can be assembled from whichever RU vendor best fits a given plant's bands, form factor, and budget, rather than a single bundled radio line. Together, OCUDU, SD-Core, SD-RAN, and OSC form one integrated, fully open-source 5G stack that a smaller solution provider or systems integrator can deploy, support, and price as a right-sized, as-a-service offer for a single plant, instead of selling a broad, vendor-locked platform. That directly answers this market's stated preference for outcome-first, economically flexible offers, and it supports a Wi-Fi-coexistence posture (private 5G for the hard problem zones, Wi-Fi where it already works) rather than a rip-and-replace sale.
The trade-off of an all-open-source stack is that the burden of proving interoperability, stability, and security shifts from a single vendor's warranty to the integrator and the open-source community itself. SMM buyers, who by their own account lack in-house cellular and associated cybersecurity expertise, have little tolerance for integration failures discovered after deployment. This is exactly the gap the on-going OCUDU Testing & Validation Plan, and its RTEC-centered extensions, are designed to close: independently witnessed, multi-vendor testing of device diversity, RU diversity, outdoor RF performance, Core/RIC/SMO integration, and security. The proposal should leverage the current, on-going testing and evaluation activities in RTECs and associated results on this front.
Although this topic is anchored in a specific vertical to ensure a concrete deployment environment, real users, and a defensible commercialization path, proposers should recognize and are required to present the technical work in terms of the generic network performance classes it advances. Improvements made to the OCUDU O-CU/O-DU under this effort (scheduler behavior, mobility management, uplink capacity, stability under sustained load, security features) are expected to generalize across verticals and to benefit the broader community of RAN developers building on OCUDU. The Technical Volume shall include a mapping of each selected use case, and its associated KPMs, to the performance class or classes it exercises, and shall identify which anticipated OCUDU code or feature enhancements correspond to each class.
For this topic, the dominant performance classes are ultra-reliable low-latency communication (URLLC) and high-mobility reliability: sustained sub-30 ms (threshold) to sub-15 ms (objective) latency for machine-vision backhaul, ≥99.5% handover success at operational AGV/AMR speeds, and ≥ five-nines availability for safety-critical services, all in dense, metal-heavy RF environments.
Research and development for this effort should address, at minimum, the following questions:
- All-Open-Source Economics: What is the fully loaded cost (integration, support, spectrum, hardware) of an OCUDU + SD-Core + SD-RAN + OSC deployment relative to a proprietary platform at SMM scale, and how should that be packaged as a CBRS-based, as-a-service offer within the price point SMM buyers require ($100,000-$250,000)?
- Use-Case-First Automation: Which of the use cases defined below deliver the fastest, most measurable ROI on the open-source stack, and what RTEC-executed interoperability tests (Device, RU, Core, RIC/SMO, and Infrastructure dimensions) are needed to validate each one end-to-end?
- Trust in Open Source: How does RTEC-executed testing of the full open-source stack (not just OCUDU) reduce the integration risk and skills-shortage barrier that SMM buyers most often cite, and what evidence package best converts community-maintained, no-license-fee software into a procurement-ready proof point for a buyer with no in-house cellular expertise?
Solutions leveraging artificial intelligence (AI) and machine learning (ML) for predictive maintenance, network optimization, or automated fault resolution are encouraged but not required. DoW will consider any novel concept that increases the reliability, economics, and trustworthiness of an all-open-source private 5G/FutureG platform for the manufacturing vertical. Dual-use opportunities are expected across both commercial SMM and DoW facility networks.
Phase I:
This topic is accepting Direct to Phase II proposals ONLY. Therefore, a formal Phase I award will not be issued.
To qualify for a Phase II award, proposers must submit Feasibility Documentation (as part of their proposal package) demonstrating that they have already completed "Phase I-type" research and development. The purpose of this documentation is to prove that the underlying technology is mature, scientifically sound, and ready to transition immediately into the Phase II prototyping and testing environment.
The Government will accept a wide variety of documentation styles. Proposers do not need to have a perfect, finished product, but they must show that their core ideas have been successfully tested. One or more of the following items should be included to prove technology readiness:
- Test Data & Metrics: Real-world measurements, performance charts, or network test data from previous lab environments or early field trials.
- Technical Reports & White Papers: Written summaries explaining your previous research, system designs, or software integration efforts.
- Prototype Designs & Simulation Models: Diagrams, architectural blueprints, or computer simulation results showing how your proposed software and hardware components interact.
- Previous Project Outcomes: Success criteria, milestone reports, or commercialization results from prior private, academic, or non-SBIR federally funded work.
Phase II:
This Phase II effort will design, validate, and demonstrate a fully open-source private 5G network platform purpose-built for manufacturing facilities, integrating OCUDU (O-CU/O-DU), SD-Core, SD-RAN, and the OSC stack with no proprietary core, RIC, or SMO components. The platform addresses four manufacturing-specific needs: high-mobility connectivity for automated guided vehicles (AGVs) and mobile plant equipment; low-latency video/camera backhaul for quality inspection and process monitoring; worker and plant safety communications; and outdoor yard and logistics coverage extending beyond the factory floor. Phase II work will produce a validated reference architecture, RTEC-executed interoperability testing across RU, Core, RIC/SMO, and infrastructure dimensions, and a working MVP demonstrated at a representative manufacturing site, along with a documented technical bridge path toward FutureG capability.
Anticipated benefits include a lower-cost, vendor-neutral alternative to proprietary industrial wireless systems, improved reliability for mobile robotics and safety-critical communications in dense industrial RF environments, and a reusable open-source deployment model. Commercial applications span discrete and process manufacturing facilities of varying scale, with dual-use potential for DoW-affiliated depots, maintenance facilities, and logistics operations requiring resilient, high-mobility industrial wireless connectivity.
Proposers must address at least two of the following four use cases in their Phase II Statement of Work, and must identify which use case(s) their reference architecture and pilot deployment are designed to validate. Each use case below is defined in terms of the operational scenario it supports, the connectivity requirement it places on the platform, and the corresponding KPM table. Device-Class Diversity and 5G RedCap. Each use-case set spans device classes from full-capability UEs (equipment modems, cameras, broadcast and production units) to reduced-capability IoT endpoints (sensors, wearables, tags, and trackers). Proposers shall address how the platform serves reduced-capability device classes, including 3GPP Release 17 Reduced Capability (RedCap) and Release 18 eRedCap UEs, and shall identify any OCUDU scheduler or feature enhancements required to support RedCap operation; such enhancements are strongly encouraged as upstream contributions under the common OCUDU benchmarking and enhancement work package. Where RedCap-certified devices are not commercially available for a given endpoint type at demonstration time, proposers may demonstrate with available device classes (or emulated RedCap UE profiles) and shall document the RedCap migration path.
For the manufacturing vertical specifically, proposers shall additionally address Industrial IoT (IIoT) service characteristics as framed by 3GPP TS 22.104 (service requirements for cyber-physical control applications), including: the mapping of selected use cases to TS 22.104 communication service classes; support for private-network (NPN) operation; awareness of Time-Sensitive Communication (TSC) and IEEE TSN integration concepts in the platform architecture (see also the latency-class scope note in Section 3.0); and secure IT/OT segmentation for IIoT traffic (e.g., via network slicing or 5G-LAN group management).
Use Case 1: AGV/AMR Connectivity & Mobility
Automated guided vehicles (AGVs) and autonomous mobile robots (AMRs) move continuously across the plant floor, between production cells, and into staging or storage areas, requiring an uninterrupted control-plane and telemetry connection as they roam. Roaming interruptions have historically been a common source of dropped sessions and stalled vehicles in Wi-Fi-served plants. Modern Wi-Fi roaming standards (IEEE 802.11k neighbor reports, 802.11r fast BSS transition, and 802.11v BSS transition management) substantially mitigate fixed-AP handoff behavior when properly deployed on capable client devices; the more fundamental challenges in this environment are contention-based access on unlicensed, shared spectrum and the severe attenuation, multipath, and reflection conditions of metal-heavy plants, which degrade any RF system absent careful network planning. The advantage sought under this topic is therefore not that Wi-Fi cannot roam, but that a 3GPP system provides deterministic, network-scheduled access on interference-managed spectrum, standardized mobility management under network control, and quality-of-service guarantees that remain enforceable under load. This use case requires the platform to sustain low-latency, high-reliability connectivity and seamless handover as AGVs/AMRs move between small cells, indoors and, where applicable, into adjoining outdoor areas.
This use case additionally requires on-floor localization of AGVs/AMRs and tagged mobile assets for fleet management, geofencing, and safety zoning. Network-native positioning using 3GPP NR positioning methods (Release 16/17) is preferred; hybrid approaches that fuse NR positioning with existing plant localization systems may be proposed with justification.
Use Case 2: Machine Vision Backhaul
Quality-inspection and process-monitoring cameras generate continuous, high-bandwidth video or image streams that must reach an on-prem or edge analytics system with minimal delay and jitter to support real-time defect detection and line-stoppage decisions. This use case requires the platform to sustain high uplink throughput with low jitter for multiple simultaneous camera streams, including in metal-heavy or RF-reflective areas of the plant where Wi-Fi performance typically degrades.
Use Case 3: Connected-Worker Safety
Plant personnel increasingly carry or wear connected devices (such as gas/hazard sensors, push-to-talk radios, panic buttons, or health/location monitors) that must reliably reach a monitoring system without gaps in coverage, including in areas (mezzanines, tank farms, loading docks) that legacy Wi-Fi does not reliably reach. This use case requires the platform to sustain consistent, low-latency coverage for safety-critical alerting across the full indoor plant footprint.
Use Case 4: Secure Outdoor Yard & Logistics Coverage
Loading docks, staging yards, rail sidings, and outdoor storage areas typically fall outside indoor Wi-Fi coverage entirely, yet increasingly require connectivity for yard trucks, RFID/asset tracking, outdoor cameras, and inventory handling equipment. This use case requires the platform to extend secure, private coverage into outdoor areas immediately adjacent to the plant, using the same OCUDU-based infrastructure rather than a separate outdoor Wi-Fi buildout.
KPMs For Phase II
For Phase II, proposers should address specific, relevant, measurable, and quantifiable KPMs, including, for example, session success rate, handover success rate, latency, jitter, and service availability. An example KPM in context could be as follows: "The platform must sustain a session success rate greater than 99.5% for AGV/AMR connections while handing over between at least 3 small cells at speeds up to 10 mph." Other suggested KPMs for the various use cases and system requirements are given below for reference.
The KPM values in the tables below are suggested reference values, not pass/fail contract requirements. Proposers shall propose specific, justified KPM targets in the Technical Volume, calibrated to their selected use cases, demonstration environment, spectrum plan, and channel bandwidth; deviations from the suggested values must be technically justified. Threshold values represent the intended standard of Phase II demonstration success; Objective values are stretch goals, some of which are expected to mature during Phase III or along the FutureG evolution path. Final KPM targets will be agreed with the Government at kickoff and confirmed at the Critical Design Review. Consistent with key milestones outlined below, partial achievement within a defined and documented scope may be considered successful.
Latency measurement definition. Latency KPMs in this document denote round-trip application-layer latency measured between the UE application interface and the local edge application endpoint served behind the on-site/edge UPF (i.e., device-to-edge through the RAN and core user plane, excluding external WAN transport). Handover time denotes user-plane interruption time at the RAN, per 3GPP definitions. For each latency KPM adopted, proposers shall specify the measurement reference points, the traffic type and packet size, and the measurement methodology (e.g., KPI definitions per 3GPP TS 28.554), and shall include in the Critical Design Document a latency budget decomposition across air interface, DU/CU processing, fronthaul and F1 transport, core user plane, and application processing.
Scope note on latency classes. Hard-real-time machine motion control (isochronous traffic with cycle times of approximately 0.5–2 ms per 3GPP TS 22.104) is outside the Phase II demonstration scope. The latency KPMs in this topic target AGV/AMR supervision and control-plane traffic, machine-vision backhaul, and safety alerting. Proposers shall, however, address in their FutureG evolution path the OCUDU enhancements required to approach the 1 ms latency class over time (including deterministic/priority scheduling, Time-Sensitive Communication support, mini-slot and preemption features etc.).
Suggested KPMs for Use Case 1: AGV/AMR Connectivity & Mobility
These metrics focus on the platform's ability to maintain reliable, low-latency connectivity for mobile robotics moving throughout a plant.
| KPM Category | Key Performance Metric (KPM) | Suggested Threshold (Minimum Success) | Suggested Objective (Desired Success) |
|---|---|---|---|
| Timeliness | Handover Time: Time to complete a handover between small cells during AGV/AMR movement. | < 50 ms | < 20 ms |
| Reliability | Handover Success Rate: Percentage of handovers completed without session drop. | > 99% | > 99.9% |
| Latency | End-to-End Latency: Round-trip latency for AGV/AMR control-plane traffic. | < 20 ms | < 10 ms |
| Reliability | Session Success Rate: Percentage of data sessions completed without error or drop. | > 99% | > 99.9% |
| Coverage | Mobility Range: Sustained connectivity across the full indoor/outdoor yard footprint at operational AGV/AMR speeds. | Full indoor footprint | Full indoor + outdoor yard footprint |
| Positioning | Device Localization Accuracy: horizontal positioning error for AGV/AMR and asset-tag devices using NR positioning methods, at 90% confidence, indoors | < 3 m | < 1 m |
Suggested KPMs for Use Case 2: Machine Vision Backhaul
These metrics measure the platform's ability to support high-bandwidth, low-jitter traffic for quality-inspection and process-monitoring cameras.
| KPM Category | Key Performance Metric (KPM) | Suggested Threshold (Minimum Success) | Suggested Objective (Desired Success) |
|---|---|---|---|
| Throughput | Sustained Uplink Throughput: Per-camera uplink throughput supported for machine-vision backhaul. | > 50 Mbps | > 150 Mbps |
| Timeliness | Latency & Jitter: Round-trip latency and jitter for real-time inspection traffic. | < 30 ms latency, < 10 ms jitter | < 15 ms latency, < 5 ms jitter |
| Reliability | Packet Loss/Error Rate: Percentage of packets lost or corrupted in transit. | < 0.5% | < 0.1% |
| Scalability | Concurrent Camera Streams: Number of simultaneous camera streams supported per cell without degradation. | 10 streams | 30 streams |
Suggested KPMs for Use Case 3: Connected-Worker Safety
These metrics measure the platform's ability to deliver reliable, low-latency coverage for safety-critical wearables and alerting devices across the full plant footprint.
| KPM Category | Key Performance Metric (KPM) | Suggested Threshold (Minimum Success) | Suggested Objective (Desired Success) |
|---|---|---|---|
| Timeliness | Alert Latency: Time from a safety-event trigger (e.g., gas sensor, panic button) to alert receipt at the monitoring system. | < 2 seconds | < 500 ms |
| Availability | Service Availability: Percentage of time the network is operational and able to provide service in safety-monitored zones. | > 99.9% | > 99.999% |
| Coverage | Coverage Completeness: Percentage of designated safety zones (mezzanines, tank farms, loading docks) with verified signal coverage. | > 95% | 100% |
| Reliability | False Negative Rate: Percentage of safety-alert transmissions that fail to reach the monitoring system. | < 0.1% | < 0.01% |
Suggested KPMs for Use Case 4: Secure Outdoor Yard & Logistics Coverage
These metrics measure the platform's ability to extend secure, private coverage into outdoor yard and logistics areas adjacent to the plant.
| KPM Category | Key Performance Metric (KPM) | Suggested Threshold (Minimum Success) | Suggested Objective (Desired Success) |
|---|---|---|---|
| Coverage | Outdoor Coverage Radius: Distance from the nearest small cell at which the platform maintains a usable connection for yard trucks and asset tracking. | > 200 meters | > 500 meters |
| Reliability | Session Success Rate (Outdoor): Percentage of data sessions completed without error or drop in outdoor yard conditions. | > 98% | > 99.5% |
| Security | Unauthorized Access Attempts Blocked: Percentage of unauthorized association/connection attempts detected and blocked at the outdoor perimeter. | > 99% | 100% |
| Mobility | Yard-Truck Handover Success Rate: Percentage of handovers completed without session drop as yard trucks move between outdoor and indoor coverage. | > 98% | > 99.5% |
Suggested KPMs for General System & Architectural Requirements
These metrics focus on the non-functional requirements of the all-open-source stack itself, ensuring it is efficient, scalable, interoperable, and compliant with the O-RAN architecture.
| KPM Category | Key Performance Metric (KPM) | Suggested Threshold (Minimum Success) | Suggested Objective (Desired Success) |
|---|---|---|---|
| Interoperability | RTEC-Validated Reference Configurations: Number of distinct RU/hardware-accelerator/RIC-SMO combinations validated through RTEC testing and available as reusable reference configurations. | ≥ 2 combinations | ≥ 5 combinations |
| Compliance | O-RAN Interface Compliance: Adherence to specified O-RAN Alliance interface standards (E1, F1-C/F1-U, O-RAN 7.2x, O1, E2). | 100% pass of a defined conformance test suite | 100% pass of a defined conformance test suite |
| Economics | Fully Loaded Deployment Cost: Total cost (hardware, integration, support) for a single-plant deployment. | ≤ $250,000 | ≤ $100,000 |
| Scalability | Managed Device Capacity: Number of concurrent AGV/AMR, camera, and connected-worker devices a single deployment can support. | 100 devices | 500 devices |
| Licensing | Proprietary Component Count: Number of proprietary core, RIC, or SMO components in the deployed stack. | 0 | 0 |
| Device-Class Support | RedCap UE Support: demonstrated attach, session establishment, and mobility for Rel-17 RedCap UEs (or emulated RedCap profiles where commercial devices are unavailable). | Lab-validated | Field-demonstrated at the pilot/demonstration site |
Phase II – Eighteen Months
Phase II consists of an eighteen-month PoP focused on prototype production, test, and evaluation. Key milestones include:
- Month 1: Kickoff and TIM
- Monthly Status Reports (MSRs)
- Month 12: Critical Design Review (CDR)
- Month 16: Prototype demonstration
- Month 14: Final design review, demonstration, and assessment
- Month 18: Final Phase II Report
Note that Monthly Status Reports must be presented to the OCUDU T&E Working Group also, bringing the community up to speed on the progress.
Prototype demonstrations will be performed at the proposer's site, ideally an operating or representative manufacturing facility (such as a partner SMM plant, a manufacturing institute or applied-research factory floor, or a comparable industrial or laboratory environment) where live plant access is not feasible during Phase II. The demonstration environment must be representative of the target deployment class in RF character (metal-heavy, multipath-rich industrial construction) and in scale (a footprint and cell count at minimum three cells, sufficient to exercise inter-cell handover at operational AGV/AMR speeds), and its fidelity to plant conditions must be documented in the MVP demonstration package.
Partial solutions may be considered successful if effective within a defined scope. A final technical report detailing the capabilities demonstrated will be required. Extended user evaluations or additional prototypes may be pursued based on utility.
OCUDU and Open-Source Integration
The Open Centralized Unit Distributed Unit (OCUDU) software codebase is released and continuously enhanced with a 3GPP-compliant open-source Centralized Unit (CU) and Distributed Unit (DU) implementation supporting open interfaces. Proposers should integrate OCUDU together with SD-Core (5G Core), SD-RAN (Near-RT RIC), and OSC stack (Non-RT RIC and SMO) into a single, fully open-source reference architecture, with no proprietary core, RIC, or SMO component anywhere in the stack. The MVP demonstration, including physical RUs and Ues, will need to occur at the factory-representative site described above (as close to a real environment). Performers should address scalability, including testing across multiple RU vendors and hardware-accelerator options, and should leverage RTEC-executed interoperability testing to address integration risks ahead of the demonstration wherever a validated reference configuration already exists.
OCUDU Baseline Benchmarking and Upstream Enhancement:
All performers under this topic shall execute the following common work package, which is a required element of the Phase II Statement of Work regardless of the use cases selected.
Task A: Baseline Benchmark. Establish a quantified performance baseline of the integrated open-source stack (OCUDU + SD-Core + SD-RAN + OSC) against the Phase II KPMs relevant to the selected use cases, including the General System and Architectural Requirements. An emulated end-to-end configuration (emulated RUs and UEs, RF channel emulation, and/or synthetic load generation) is acceptable and encouraged for the baseline, provided the benchmark methodology, tooling, configurations, and results are fully documented and reproducible. Where an RTEC-validated reference configuration already exists for the proposed RU/Core/RIC/SMO combination, the baseline shall incorporate available RTEC results rather than duplicate them. Baseline methodology and results shall be presented to the OCUDU T&E Working Group.
Task B: Code and Feature Enhancement. Identify the gaps between baseline performance and threshold and objective values, and develop the OCUDU code improvements and features required to close them (e.g., scheduler and QoS enhancements, mobility/handover optimization, uplink capacity improvements, stability hardening, security features). All modifications to OCUDU shall be contributed upstream through the project's standard contribution and review process; enhancements that cannot be upstreamed shall be documented with rationale. Progress against each targeted KPM, and the status of each upstream contribution, shall be reported in the Monthly Status Reports presented to the OCUDU T&E Working Group.
Task C: Benchmark and Regression Harness. Deliver the emulation-based end-to-end benchmark suite developed under Task A as a repeatable, documented, open-source harness suitable for adoption by the OCUDU community and RTECs for regression testing of future OCUDU releases.
This work package complements, and does not replace, the interoperability testing and the physical MVP demonstration required elsewhere in this topic. Emulated results establish the baseline and guide enhancement work; over-the-air performance with physical RUs and UEs at the RTEC and/or representative demonstration site remains the standard of evidence for final KPM achievement.
RF Network Planning and Site Engineering
Industrial facilities are among the most difficult RF environments for any wireless system: dense metal structures, racking, and machinery produce severe attenuation, multipath, and reflection conditions that directly affect handover performance, throughput, jitter, and coverage completeness. Performers shall execute a representative facility-specific RF engineering task comprising: (1) predictive propagation modeling incorporating facility-specific features (metal racking, machinery, mezzanines, tank farms, loading areas); (2) an RF design that mitigates identified dead spots and multipath-driven impairments through cell placement, antenna selection and orientation, and mobility-parameter tuning; and (3) address installation engineering practices that protect radio hardware, including antenna placement clearances from nearby reflective metal and verification of antenna-system return loss/VSWR at commissioning, with monitoring thereafter, to prevent reflected-power damage to RU front-ends.
Security Requirements
Security shall be a first-class design requirement of the platform, not a demonstration afterthought. Performers shall implement and document a security architecture covering: 3GPP security per TS 33.501 (mutual authentication, air-interface encryption and integrity protection); protection of the O-RAN open interfaces (open fronthaul, E2, A1, O1) per O-RAN WG11 specifications; zero-trust principles per NIST SP 800-207, including least-privilege access and separation of management and user traffic; monitoring of Common Vulnerabilities and Exposures (CVEs) affecting OCUDU and its dependencies, and timely upstream patching. Security features and hardening developed for OCUDU shall be contributed upstream under the common benchmarking and enhancement work package. The security architecture shall be documented at CDR and validated in RTEC testing, and the MVP demonstration shall include at least one security capability shown live (e.g., rejection of an unauthorized device, encrypted fronthaul, or detection of a simulated intrusion).
Phase II Deliverables
- Kickoff and TIM slides
- Monthly Status Reports (MSRs)
- Critical Design Document (full reference architecture: OCUDU + SD-Core + SD-RAN + OSC)
- Key Performance Metrics (see Section 3)
- MVP Demonstration Slides and Documentation, including a description of the demonstration site's fidelity to factory conditions and the KPI results achieved against Section 3.0 thresholds
- Reference Configuration Package: executables, integration documentation, and RTEC test results for the validated RU/Core/RIC/SMO combination(s) used
- Integration of the platform into an RTEC-affiliated test/evaluation network and/or a factory-representative demonstration site, demonstrating at least one of the two selected use cases.
- OCUDU Baseline Benchmark Report: methodology, emulation environment description, configurations, and measured baseline results against Section 3.0 KPMs (expected by Month 3)
- Upstream Contribution Log: itemized record of OCUDU code contributions (patches/pull requests), their review status, and the KPM gap each addresses (updated in each MSR; final version in the Final Technical Report)
- Open-source benchmark and regression harness, with documentation sufficient for independent execution by RTECs and the OCUDU community
- RF Design Report (including representative coverage maps and return-loss/VSWR commissioning approaches).
- Final Design Document
- Final Technical Report
Phase III:
The development of an open-source private 5G network platform for smart manufacturing offers significant dual-use potential, benefiting both commercial industry and DoW operations.
For the commercial sector, this technology provides small and medium-sized manufacturers (SMMs) with a low-cost, secure, and vendor-neutral wireless solution. It directly addresses key manufacturing needs such as enhancing automated guided vehicle (AGV) mobility, enabling real-time machine vision for quality control, improving connected-worker safety, and extending secure connectivity to outdoor logistics yards.
For the DoW, this same technology can be applied to its own industrial and logistical environments. It offers a pathway to modernize DoW-affiliated depots, maintenance facilities, and logistics operations with resilient, high-mobility wireless connectivity. This is particularly relevant for contested logistics, where reliable, secure, and private communication networks are critical for maintaining operational tempo and supply chain integrity. The platform's open-source nature reduces dependency on proprietary systems and enhances security, aligning with key DoW modernization goals.
Files
| File | Type | Posted |
|---|---|---|
| OSW26BZ06-DV032.pdf | ||
| FutureG_SBIR_26BZ_R6_v2.pdf | ||
| 26.BZ_Modifications_10202026.xlsx | XLSX spreadsheet |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Resilient Tactical Edge Networks | Office of the Secretary of Defense | Total Small Business | |
| Real-World Applications for Prototype ISAC Demonstrations (RAPID) Small Business | Office of the Secretary of Defense | Total Small Business | |
| DIRECT TO PHASE II: Ultra-Low Latency Technology for Radio Applications 5G | Department of the Navy | Total Small Business | |
| DIRECT TO PHASE II: Modular Software Reference Implementation for Waveforms | Department of the Navy | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity