FutureG_SBIR_26BZ_R6_v2.pdf
PDF 483 KB Posted
- Attached to
- Smart Manufacturing
- Solicitation number
- OSW26BZ06-DV032
- Issued by
-
Office of the Secretary of Defense
About this file
This is a Broad Agency Announcement (BAA) for the Office of the Undersecretary of War, Research and Engineering's FutureG Office, containing proposal submission instructions and three research topics for the FY26 Small Business Innovation Research (SBIR) program.
The announcement covers three research topics: (1) OSW26BZ06-NV028 "5G Signature Tracking Mitigation via Cyber Deception," (2) OSW26BZ06-DV031 "Smart Venues and Stadiums," and (3) OSW26BZ06-DV032 "Smart Manufacturing." Topic NV028 seeks development of a digital signature management and deception system to protect personnel from adversarial surveillance on commercial cellular networks, with Phase I funding capped at $323,090 for six months. Topics DV031 and DV032 accept only Direct-to-Phase II proposals (no Phase I awards), with Phase II funding capped at $2,153,927 for 18 months; both require demonstrated feasibility documentation proving Phase I-equivalent work has already been completed. All topics require submissions through the DoW SBIR/STTR Innovation Portal (DSIP), with proposals consisting of a cover sheet, technical volume (20-page maximum for Phase I; 20 pages maximum for Phase II with 5-page Phase I justification and 15-page Phase II proposal), cost volume, Company Commercialization Report, supporting documents, Fraud Waste and Abuse training certification, and Foreign Affiliations disclosure forms. Phase I awardees will be notified within 90 days of topic closing; proposals may be protested per FAR 33.106(b) with protests after award submitted to osd.ncr.ousd-r-e.mbx.SBIR-STTR-Protest@mail.mil. All proposals are evaluated per DoW solicitation criteria, and proposers are encouraged to register for the DSIP Listserv and review the full DoW SBIR Program BAA at https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations. Technical and business assistance (TABA) funding is available up to $6,500 for Phase I awardees and $50,000 for Phase II awardees, submitted via the SBIR/STTR TABA Request Form in Volume 5. The projected CMMC Level requirement is Level 2 (Self) for all topics.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OSW26BZ06-DV032.pdf | ||
| 26.BZ_Modifications_10202026.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version 2
OSW/Future G - 1
OSW - FutureG Office FY26 Small Business Innovation Research (SBIR) BAA
Release 6 Proposal Submission Instructions
INTRODUCTION
The Office of the Undersecretary of War, Research and Engineering’s (OUSW(R&E’s)) FutureG Office (FutureG) aims to accelerate the adoption, adaptation, and advancement of next-generation wireless technologies—beyond 5G and into 6G—for U.S. defense and national security needs. FutureG seeks to leverage commercial innovation, open standards, and interoperable solutions to deliver secure, resilient, and high-performance wireless capabilities that give the warfighter a decisive advantage.
Proposers responding to a topic in this Broad Agency Announcement (BAA) must follow all general instructions provided in the Department of War (DoW) SBIR Program BAA. OUSW(R&E) FutureG requirements in addition to or deviating from the DoW Program BAA are provided in the instructions below.
Proposers are encouraged to thoroughly review the DoW solicitation and register for the DSIP Listserv to remain apprised of important programmatic and contractual changes.
• The full DoW solicitation is available on DSIP at https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations. Be sure to select the tab for the appropriate solicitation cycle.
• Register for the DSIP Listserv at: https://www.dodsbirsttr.mil/submissions/login.
Specific questions pertaining to the administration of the FutureG SBIR Program and these proposal preparation instructions should be directed to: OUSW(R&E) FutureG Office, OSDRE- FutureG@groups.mail.mil.
PHASE I PROPOSAL GUIDELINES
The DoW SBIR/STTR Innovation Portal (DSIP) is the official portal for DoW SBIR/STTR proposal submission. Proposers are required to submit proposals via DSIP; proposals submitted by any other means will be disregarded. Detailed instructions regarding registration and proposal submission via DSIP are provided in the DoW solicitation.
Proposal Coversheet (Volume 1)
The proposal coversheet is prepared on DSIP and in accordance with the DoW solicitation.
Technical Volume (Volume 2) The technical volume is not to exceed 20 pages and must follow the formatting requirements provided in the DoW SBIR Program BAA. Any pages in the technical volume over 20 pages will not be considered in proposal evaluations.
Content of the Technical Volume Utilize the Phase I Proposal Template provided in the DoW SBIR Program BAA, Appendix A.
Cost Volume (Volume 3) The Phase I Base amount must not exceed $323,090 and a duration of 6 months.
https://www.dodsbirsttr.mil/submissions/solicitation-documents/active-solicitations https://www.dodsbirsttr.mil/submissions/login mailto:OSDRE-FutureG@groups.mail.mil mailto:OSDRE-FutureG@groups.mail.mil
OSW/Future G - 2
Please review the updated Percentage of Work (POW) calculation details included in the DoW SBIR Program BAA. FutureG Office will not accept any deviation to the POW requirements Company Commercialization Report (CCR) (Volume 4) Completion of the CCR as Volume 4 of the proposal submission in DSIP is required. Please refer to the DoW solicitation for full details on this requirement. Information contained in the CCR will be considered by FutureG Office during proposal evaluations.
Supporting Documents (Volume 5) Volume 5 is provided for proposing SBCs to submit additional documentation to support the Coversheet (Volume 1), Technical Volume (Volume 2), and the Cost Volume (Volume 3). Please refer to the DoW solicitation for more information.
Fraud, Waste and Abuse Training (Volume 6) Fraud, Waste and Abuse training material can be found in the Volume 6 section of the proposal submission module in DSIP and must be thoroughly reviewed once per year to proceed with proposal submission.
Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Volume 7) Small business concerns must complete the Disclosures of Foreign Affiliations or Relationships to Foreign Countries webform in Volume 7 of the DSIP proposal submission. Please be aware that the Disclosures of Foreign Affiliations or Relationships to Foreign Countries WILL NOT be accepted as a PDF Supporting Document in Volume 5 of the DSIP proposal submission. Do not upload any previous versions of this form to Volume 5. For additional details, please refer to the DoW Program BAA.
DIRECT TO PHASE II PROPOSAL GUIDELINES
15 U.S.C. §638 (cc), allows DoW to make a SBIR Phase II award to a small business concern with respect to a project, without regard to whether the small business concern was provided an award under Phase I of the SBIR program with respect to such project.
Each eligible topic requires that proposers provide documentation to demonstrate that the feasibility described in the Phase I section of the topic has been met. Feasibility documentation cannot be based upon or logically extend from any prior or ongoing federally funded SBIR or STTR work. Work submitted within the feasibility documentation must have been substantially performed by the proposer and/or the principal investigator (PI). If technology in the feasibility documentation is subject to intellectual property (IP), the proposer must either own the IP or must have obtained license rights to such technology prior to proposal submission, to enable it and its subcontractors to legally carry out the proposed work.
If the proposer fails to demonstrate technical merit and feasibility equivalent to the Phase I level as described in the associated topic, the related Phase II proposal will not be evaluated.
Complete DP2 proposals must include the following:
• Volume 1: Proposal Cover Sheet
• Volume 2: Technical Volume (20 page Maximum) o Part 1: Phase I Justification (5 Pages Maximum) o Part 2: Phase II Technical Proposal (15 Pages Maximum)
• Volume 3: Cost Volume
• Volume 4: Company Commercialization Report
• Volume 5: Supporting Documents
OSW/Future G - 3
• Volume 6: Fraud Waste and Abuse Certification
• Volume 7: Disclosure of Foreign Affiliations or Relationships to Foreign Countries
Phase II proposals require a comprehensive, detailed submission of the proposed effort. Commercial and military potential of the technology under development is extremely important. Proposals emphasizing dual-use applications and commercial exploitation of resulting technologies are sought.
Volume 1 - Cover Sheet The proposal cover sheet is prepared on DSIP. The cover sheet must include a brief technical abstract that describes the proposed R&D project and an anticipated benefits and potential commercial applications discussion. Each section should be no more than 3,000 characters. Do not include proprietary or classified information in the proposal cover sheet. If your proposal is selected for negotiation and possible award, the technical abstract and anticipated benefits discussion may be publicly released online.
DSIP will assign a proposal number once the cover sheet is saved. You may modify the cover sheet as needed until the topic closes.
Volume 2 – Technical Volume (20 pages)
• Phase I Feasibility Documentation (5 Pages Maximum). Offerors are required to provide information demonstrating the establishment of the scientific and technical merit and feasibility.
Feasibility documentation MUST NOT be solely based on work performed under prior or ongoing Federally funded SBIR or STTR work.
• Phase II Technical Objectives and Approach (15 Pages Maximum). List the specific technical objectives of the Phase II research and provide a detailed technical approach to meet these objectives.
• Phase II Work Plan. Provide an explicit, detailed description of the Phase II approach. The plan should indicate what is planned, how and where the work will be carried out, a schedule of major events, and the final product to be developed. A Phase II effort should attempt to accomplish the technical feasibility demonstrated in Phase I, including potential commercialization of results. Phase II is the principal research and development effort and is expected to produce a well-defined deliverable product or process.
• Related Work. Describe significant activities directly related to the proposed effort, including those conducted by the Principal Investigator, the proposing firm, consultants, or others. Report how the activities interface with the proposed project and discuss any planned coordination with outside sources. The proposers’ awareness of the state-of-the-art technology and associated science must be demonstrated.
• Relationship with Future Research or Research and Development. State the anticipated results of the proposed approach if the project is successful. Discuss the significance of the Phase II effort in providing a foundation for a Phase III research or research and development effort.
• Technology Transition and Commercialization Strategy (NTE 2 pages, counts toward 15 page limit of Phase II technical objective section). Describe your company’s strategy for converting the proposed SBIR research, resulting from your proposed Phase II contract, into a product or non-R&D service with widespread commercial use -- including private sector, military markets, and transition to DoW operational systems. Note that the commercialization strategy is separate from the Company Commercialization Report (CCR) described below. The strategy addresses how you propose to commercialize this research, OSW/Future G - 4 while the Company Commercialization Report covers what you have done to commercialize the results of past Phase II awards. Historically, a well-conceived commercialization strategy is an excellent indicator of ultimate Phase III success. The commercialization strategy must address the following questions:
o What is the first product that this technology will go into?
o Who will be your customers, and what is your estimate of the market size?
o How much funding will you need to bring the technology to market, and how will you raise those funds?
o Does your company contain marketing expertise and, if not, how do you intend to bring that expertise into the company?
o Who are your competitors, and what is your price and/or quality advantage over your competitors?
• Key Personnel. Identify key personnel, including the Principal Investigator, who will be involved in the Phase II effort. List directly related education and experience and relevant publications (if any) of key personnel. Include a concise resume of the Principal Investigator(s).
• Facilities/Equipment. Describe available instrumentation and physical facilities necessary to carry out the Phase II effort. Justify items of equipment to be purchased (as detailed in the cost proposal) including Government Furnished Equipment (GFE). All requirements for government furnished equipment or other assets, as well as associated costs, must be determined and agreed to during Phase II contract negotiations. State whether or not the facilities where the proposed work will be performed meet environmental laws and regulations of federal, state (name) and local governments. This includes, but is not limited to, the following groupings: airborne emissions, waterborne effluents, external radiation levels, outdoor noise, solid and bulk waste disposal practices, and handling and storage of toxic and hazardous materials.
• Consultants. Involvement of university, academic institution, or other consultants in the project may be appropriate. If such involvement is intended, it should be described in detail and identified in the Cost Volume.
Volume 3 - Cost Volume Direct to Phase II proposals must not exceed a cost of $2,153,927 and a duration of 18 months.
A detailed, Phase II Cost Volume must be submitted online and in the proper format shown in the Cost Breakdown Guidance in DoW 2026 SBIR BAA. Some items in the cost volume template may not apply to the proposed project. If such is the case, there is no need to provide information for every item.
Provide enough information to allow evaluators to assess the proposer’s plans to use the requested funds if the contract is awarded.
Volume 4 – Company Commercialization Report (CCR) (Required) Completion of the CCR as Volume 4 of the proposal submission in DSIP is required. Please refer to the DoW 2026 SBIR BAA for full details on this requirement. The information contained in the CCR will be considered during proposal evaluations.
OSW/Future G - 5
Volume 5 – Supporting Documents Volume 5 is provided for proposing SBCs to submit additional documentation to support the Coversheet (Volume 1), Technical Volume (Volume 2), and the Cost Volume (Volume 3). Please refer to the DoW solicitation for more information.
Volume 6 – Fraud Waste and Abuse Certification (Required) Fraud, Waste and Abuse training material can be found in the Volume 6 section of the proposal submission module in DSIP and must be thoroughly reviewed once per year to proceed with proposal submission.
Volume 7 – Disclosures of Foreign Affiliations or Relationships to Foreign Countries (Required) Small business concerns must complete the Disclosures of Foreign Affiliations or Relationships to Foreign Countries webform in Volume 7 of the DSIP proposal submission. Please be aware that the Disclosures of Foreign Affiliations or Relationships to Foreign Countries WILL NOT be accepted as a PDF Supporting Document in Volume 5 of the DSIP proposal submission. Do not upload any previous versions of this form to Volume 5. For additional details, please refer to the DoW SBIR Program BAA.
PHASE II PROPOSAL GUIDELINES
Phase II proposals may only be submitted by Phase I awardees. For successful Phase I efforts, there may be a follow-on Phase II topic released within six months of Phase I completion. Phase II efforts may be funded at $2,153,927 for 18 month period of performance.
DISCRETIONARY TECHNICAL AND BUSINESS ASSISTANCE (TABA)
The OSW SBIR/STTR Program will consider TABA requests in accordance with 15 U.S.C. § 638(q).
Phase I awardees may request up to $6,500 in TABA funding; Phase II awardees may request up to $50,000 per Phase II project. TABA funding is in addition to the Phase I and Phase II cost ceilings and is not subject to profit/fee. Refer to the DoW Program BAA for detailed information about TABA funding, allowable services and requirements.
All requests for TABA must be completed using the SBIR/STTR TABA Request Form found here. The completed form must be included in Volume 5 of the proposal submission in DSIP. OSW will not accept requests for TABA that do not utilize the SBIR/STTR TABA Request Form or as a submission document included in Volume 5.
EVALUATION AND SELECTION
All proposals will be evaluated in accordance with the evaluation criteria listed in the DoW solicitation.
Proposing firms will be notified of selection or non-selection status for a Phase I award within 90 days of the closing date of the topic via DSIP. This notification will be sent to the individual listed as the Corporate Official on the proposal cover sheet.
Refer to the DoW solicitation for procedures to protest the Announcement.
As further prescribed in FAR 33.106(b), FAR 52.233-3, Protests after Award should be submitted to:
osd.ncr.ousd-r-e.mbx.SBIR-STTR-Protest@mail.mil.
https://www.dodsbirsttr.mil/submissions/api/public/download?uploadId=MTc4NzQ1Nw==&fileName=SBIR/STTR_Technical_and_Business_Assistance_(TABA)_Request_Form.pdf mailto:osd.ncr.ousd-r-e.mbx.SBIR-STTR-Protest@mail.mil
OSW/Future G - 6
OSW-FutureG SBIR DOW 2026 BAA Topic Index
Release 6
OSW26BZ06-NV028 5G Signature Tracking Mitigation via Cyber Deception
OSW26BZ06-DV031 Smart Venues and Stadiums
OSW26BZ06-DV032 Smart Manufacturing
OSW/Future G - 7
OSW26BZ06-NV028 TITLE: 5G Signature Tracking Mitigation via Cyber Deception
OUSW (R&E) CRITICAL TECHNOLOGY AREA(S): Contested Logistics Technologies (LOG)
COMPONENT TECHNOLOGY PRIORITY AREA(S): FutureG; Emerging Threat Reduction;
Sustainment & Logistics
PROJECTED CMMC LEVEL REQUIREMENT: Level 2 (Self)
OBJECTIVE: The objective of this effort is to develop an advanced digital signature management and deception system that obfuscates cellular metadata ("digital exhaust") to protect personnel, small units, and critical facilities from adversarial surveillance, tracking, and pattern-of-life analysis on 3rd-party commercial networks.
DESCRIPTION: As military and government personnel increasingly rely on commercial mobile networks, the management of digital signatures has become a critical operational concern. Accessing foreign mobile phone networks exposes individuals and organizations to surveillance and espionage threats due to their "digital exhaust", the metadata required to operate on a cellular network (e.g., credentials, location data, device IDs). Adversaries can leverage this data to track daily routines, identify deviations indicating special events (e.g., VIP visits or mission preparation), and map sensitive facilities based on cell phone concentration or periods of inactivity.
PHASE I: During Phase I, proposers are required to present a comprehensive concept design and feasibility study for a digital exhaust deception system. Solutions should outline the proprietary software required to conduct AI-enabled mission planning and operations.
Proposers must define specific, relevant, measurable, and quantifiable key performance metrics (KPMs) for their proposed solutions. Suggested KPMs for the system include, but are not limited to:
KPM Category Key Performance Metric
(KPM)
Suggested Threshold (Minimum Success)
Suggested Objective (Desired Success)
Persona Capacity AI-powered personas broadcasted simultaneously per decoy device.
2 personas 4+ personas
Operational Endurance Battery life for highly mobile/pluggable decoy form factors.
12 hours 24 - 36 hours
System Weight Weight of the personal decoy device.
< 2 pounds ~1 pound
Obfuscation Realism Ability of AI-generated traffic to mimic realistic patterns of life to defeat automated network analysis.
Defeats basic heuristic analysis
Defeats advanced ML-based behavioral tracking
OSW/Future G - 8
Phase I will consist of a six-month Period of Performance (PoP) to develop the initial application concepts, algorithms, and a comprehensive design document that outlines the software architecture for future development and deployment.
Key activities include:
Phase kickoff:
• Technical Interchange Meeting (TIM)
• Preliminary Design Review (PDR)
Before the end of Phase I, the performer must develop and present a detailed plan for addressing Phase II prototype development, testing, and evaluation, aiming to advance the technology from its current state to
TRL 7.
Phase I Deliverables:
• Kickoff and TIM slides
• Monthly Status Reports (MSRs)
• Preliminary Design Document detailing AI-persona generation and ID-swapping mechanics
• Phase II Plan
• Final Phase I Report
PHASE II: A Phase II follow-on effort will focus on prototype production, testing, and evaluation to reach a TRL 7 capability. The effort should result in the delivery of fully integrated mission management software and hardened decoy box form factors (e.g., Wi-Fi router-sized team devices and puck-sized personal devices).
Key milestones will include:
• Month 1: Monthly Status Reports (MSRs) Month 1: Kickoff and TIM
• Month 6: Critical Design Review (CDR)
• Month 9: Prototype demonstration of single and multi-node networked operations
• Month 11: Final design review, field demonstration (e.g., 5G test network execution), and assessment
• Month 12-18: Final Phase II Report
Prototype demonstrations will be performed at the proposer’s site or an approved DoW test range.
Performers should address scalability, including the ability to run multiple linked decoy boxes from a single operations laptop.
PHASE III DUAL USE APPLICATIONS: The proposed digital signature management technology presents significant dual-use potential. While fundamentally designed to protect military assets from advanced signals intelligence (SIGINT), the core capability of obfuscating cellular metadata directly translates to protecting high-value corporate assets, personnel, and intellectual property from commercial espionage and tracking.
REFERENCES:
1. https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/852002p.pdf
KEYWORDS: Digital Signature Management, Digital Exhaust, Operating on untrusted networks
OSW/Future G - 1
OSW26BZ06-DV031 TITLE: Smart Venues and Stadiums
OUSW (R&E) CRITICAL TECHNOLOGY AREA(S): Applied Artificial Intelligence (AAI); Contested Logistics Technologies (LOG)
COMPONENT TECHNOLOGY PRIORITY AREA(S): FutureG; Sustainment & Logistics
PROJECTED CMMC LEVEL REQUIREMENT: Level 2 (Self)
OBJECTIVE: The objective of this Phase II effort is to design, validate, and demonstrate a secure, high-density private 5G network platform for stadiums and large venues—integrating open-source OCUDU, SD-Core, SD-RAN, and OSC components—to deliver resilient, multi-service communication alongside a 6G-ready Integrated Sensing and Communication (ISAC) architecture. This platform will be validated at a representative venue site to prove stable performance under extreme device congestion, enable native device localization for crowd analytics, and establish a cost-effective, vendor-neutral dual-use framework for both commercial entertainment venues and dense military installation environments.
DESCRIPTION: The realistic near-to-mid-term serviceable addressable market for private 5G/6G-ready platforms among U.S. venues and stadiums is a subset of venues with acute connectivity, safety, and operational pain: major-league and collegiate stadiums, multi-purpose arenas, outdoor amphitheaters, and convention/exhibition centers that host recurring high-density events, require public-safety-grade coverage throughout bowls, concourses, tunnels, and back-of-house areas, and are increasingly asked to support fan-facing digital experiences, cashier less concessions, camera and sensor networks, and first-responder communications simultaneously on event day. Venues already invest heavily in connectivity infrastructure, yet several published industry reports indicate persistent cost and coverage pain.
Distributed Antenna System (DAS) deployments in large public venues have grown from a few million dollars in early builds to routinely tens of millions of dollars. Independent of venue scale, active multi-carrier DAS hardware and installation is commonly quoted at $5–$10 per square foot, meaning even a mid-sized 300,000 sq. ft. concourse/bowl footprint implies a multi-million-dollar build before integration, spectrum, and ongoing carrier-management costs.
The United States features an extensive footprint of sports and entertainment infrastructure, spanning an estimated 2,000 to 5,000 major stadiums and arenas when accounting for all professional, collegiate, and municipal facilities, which further scales to over 15,000 total venues if relatively large localized high school stadium is included. Beyond stadiums and arenas, industry directories catalog well over 400 U.S.
convention and exhibition centers, ranging from single-hall regional facilities to multi-million-square-foot complexes. Together, these figures put the large-venue addressable base at several hundred U.S. facilities, before counting mid-sized arenas, amphitheaters, and secondary convention space. Besides, localized specific large gatherings (such as fairs) add up to several thousand.
Despite this infrastructure spend, published reviews consistently cite coverage dead zones in lower bowls and concourses, congestion during peak moments (kickoff, halftime, entry/egress), and multi-year vendor lock-in as recurring pain points, and industry reporting suggests that MNO appetite to fund new DAS builds outside "Tier 1" venues (70,000+ capacity or 200+ events/year) is shrinking, leaving small and mid-sized venues with a widening connectivity gap.
This segment buys on measurable fan and operational outcomes (dropped-call rate at kickoff, POS uptime, camera uptime, incident-response time), not on global platform standardization, and its stated barriers to adopting anything other than the incumbent DAS/neutral-host model are consistent: high capex and multi-year contract terms, uncertainty about interoperability across multiple wireless carriers that
OSW/Future G - 2 must all be hosted on one system, integration complexity with legacy venue IT/OT and public-safety radio systems, and a lack of in-house RF/cellular engineering staff.
An all-open-source stack removes the structural cost and lock-in that makes proprietary DAS platforms a poor fit for this segment's economics. Because OCUDU communicates with the rest of the network over open, standardized interfaces (especially the O-RAN 7.2x split to the O-RU), the network can be assembled from whichever RU vendor and antenna form factor best fits a given venue's bowl geometry, concourse layout, and budget. Together, OCUDU, SD-Core, SD-RAN, and OSC form one integrated, fully open-source 5G stack that a systems integrator can deploy, support, and price as a right-sized, as-a-service offer for a single venue, rather than a broad, vendor-locked, multi-carrier neutral-host platform.
The trade-off of an all-open-source stack is the same one seen in other verticals: the burden of proving interoperability, stability, and security shifts from a single vendor's warranty to the integrator and the open-source community. Venue operators, who by their own account do not carry in-house cellular or RF engineering expertise, have essentially zero tolerance for connectivity failures discovered live, on a broadcast event, in front of tens of thousands of people. This is exactly the gap the on-going OCUDU Testing & Validation Plan, and its RTEC-centered extensions, are designed to close: independently witnessed, multi-vendor testing of device diversity, RU diversity, high-density/high-mobility RF performance, Core/RIC/SMO integration, and security. The proposal should leverage the current, on-going testing and evaluation activities in RTECs and associated results on this front.
Although this topic is anchored in a specific vertical to ensure a concrete deployment environment, real users, and a defensible commercialization path, proposers should recognize and are required to present the technical work in terms of the generic network performance classes it advances. Improvements made to the OCUDU O-CU/O-DU under this effort (scheduler behavior, mobility management, uplink capacity, stability under sustained load, security features) are expected to generalize across verticals and to benefit the broader community of RAN developers building on OCUDU. The Technical Volume shall include a mapping of each selected use case, and its associated Section 3.0 KPMs, to the performance class or classes it exercises, and shall identify which anticipated OCUDU code or feature enhancements correspond to each class.
PHASE I: This topic is accepting Direct to Phase II proposals ONLY. Therefore, a formal Phase I award will not be issued.
To qualify for a Phase II award, proposers must submit Feasibility Documentation (as part of their proposal package) demonstrating that they have already completed "Phase I-type" research and development. The purpose of this documentation is to prove that the underlying technology is mature, scientifically sound, and ready to transition immediately into the Phase II prototyping and testing environment.
The Government will accept a wide variety of documentation styles. Proposers do not need to have a perfect, finished product, but they must show that their core ideas have been successfully tested. One or more of the following items should be included to prove technology readiness:
• Test Data & Metrics: Real-world measurements, performance charts, or network test data from previous lab environments or early field trials.
• Technical Reports & White Papers: Written summaries explaining your previous research, system designs, or software integration efforts.
• Prototype Designs & Simulation Models: Diagrams, architectural blueprints, or computer simulation results showing how your proposed software and hardware components interact.
• Previous Project Outcomes: Success criteria, milestone reports, or commercialization results from prior private, academic, or non-SBIR federally funded work.
OSW/Future G - 3
PHASE II: For this topic, the dominant performance classes are extreme user density, ultra-secure operation, and integrated sensing: tens of thousands of concurrent devices per venue with sharp event-day load peaks, public-safety-grade availability and access control across bowls, concourses, and back-of-house areas, and an architecture evolvable to 6G Integrated Sensing and Communication (ISAC).
Research and development for this effort should address, at minimum, the following questions:
• All-Open-Source Economics: What is the fully loaded cost (integration, support, spectrum, hardware, RF design) of an OCUDU + SD-Core + SD-RAN + OSC deployment at venue scale relative to a proprietary DAS/neutral-host platform, and how should that be packaged as a CBRS-based, as-a-service offer within the price point venue operators require?
• Use-Case-First Deployment: Which of the use cases defined below deliver the fastest, most measurable ROI on the open-source stack, and what RTEC-executed interoperability tests (Device, RU, Core, RIC/SMO, and Infrastructure dimensions) are needed to validate each one end-to-end under stadium-scale, high-density loading conditions?
• 6G/ISAC Evolution Path: What architectural changes (waveform, RU capability, RIC application, and SMO orchestration) are required to evolve the platform from a 5G communications-only deployment to a 6G-ready platform capable of Integrated Sensing and Communication, and which ISAC-enabled use cases can be prototyped now using 5G-Advanced sensing features as a bridge to native 6G ISAC?
• Trust in Open Source: How does RTEC-executed testing of the full open-source stack reduce the integration risk and skills-shortage barrier venue operators most often cite, and what evidence package best converts community-maintained, no-license-fee software into a procurement-ready proof point for a buyer with no in-house cellular expertise?
Solutions leveraging artificial intelligence (AI) and machine learning (ML) for crowd analytics, predictive maintenance, network optimization, or automated fault resolution are encouraged but not required. DoW will consider any novel concept that increases the reliability, economics, and trustworthiness of an all-open-source private 5G/FutureG platform for the venues and stadiums vertical.
Dual-use opportunities are expected across commercial venue operators, DoW-affiliated event and installation venues, and public-safety agencies.
Proposers must address at least two of the following four use cases in their Phase II Statement of Work and must identify which use case(s) their reference architecture and pilot deployment are designed to validate. Each use case below is defined in terms of the operational scenario it supports, the connectivity and/or sensing requirement it places on the platform. Device-Class Diversity and 5G RedCap. Each use-case set spans device classes from full-capability UEs (equipment modems, cameras, broadcast and production units) to reduced-capability IoT endpoints (sensors, wearables, tags, and trackers). Proposers shall address how the platform serves reduced-capability device classes, including 3GPP Release 17 Reduced Capability (RedCap) and Release 18 eRedCap UEs, and shall identify any OCUDU scheduler or feature enhancements required to support RedCap operation; such enhancements are strongly encouraged as upstream contributions under the common OCUDU benchmarking and enhancement work package.
Where RedCap-certified devices are not commercially available for a given endpoint type at demonstration time, proposers may demonstrate with available device classes (or emulated RedCap UE profiles) and shall document the RedCap migration path.
Use Case 1: High-Density Fan Connectivity & Broadcast/Production Backhaul Tens of thousands of fans, concession point-of-sale terminals, ticketing scanners, and broadcast/production camera and audio feeds must all operate simultaneously within a single bowl and concourse footprint, with demand spiking sharply at kickoff, halftime, and egress. Legacy DAS and Wi-Fi
OSW/Future G - 4 are commonly saturated at these peak moments, producing dropped sessions and stalled transactions. This use case requires the platform to sustain high concurrent-device density with consistent per-user throughput, plus dedicated low-latency, low-jitter uplink capacity for broadcast and production camera backhaul, across the full bowl and concourse footprint.
Use Case 2: ISAC-Enabled Crowd Analytics & Situational Awareness (6G-Ready) Venue operators and public-safety personnel need continuous, accurate awareness of crowd density, flow, and anomalies (bottlenecks at egress, unattended objects, unauthorized drone incursion into restricted airspace above the bowl) to prevent crushing incidents/stampedes and respond quickly to emerging threats. Deploying a separate dedicated sensor network (radar, lidar, additional camera arrays) to provide this awareness is costly and adds another system to integrate. This use case requires the platform to support Integrated Sensing and Communication (ISAC). ISAC uses the same radio infrastructure and spectrum that carries communication traffic to also sense the physical environment (bistatic or monostatic sensing from gNB/O-RU hardware, correlated with RIC-hosted analytics applications), without requiring a separate sensing-only network build. [3GPP Release 19 Technical Report (TR) 22.837 identifies more than 30 ISAC use cases spanning applications such as object and intruder detection, environmental monitoring, motion sensing, and public-safety scenarios directly applicable to stadiums, arenas, and convention centers. Complementing these use cases, 3GPP TS 22.137 establishes a standardized set of ISAC performance metrics, including positioning accuracy, velocity accuracy, sensing resolution, sensing range, refresh rate, latency, and missed-detection and false-alarm probabilities, to enable consistent evaluation and deployment of sensing-enabled wireless networks.] Proposers should treat 5G-Advanced sensing features as the near-term bridge path toward native 6G ISAC.
Hybrid localization architecture. Proposers shall employ a hybrid architecture in which standardized network-native UE positioning (3GPP Release 16/17 NR positioning: UL-TDoA, multi-RTT, AoA/AoD) over the connected device population provides the primary, near-term source of crowd density, flow, and bottleneck analytics, with appropriate aggregation and anonymization for fan-facing devices and RF sensing (ISAC) is applied to non-cooperative targets that carry no connected device. Crowd-analytics KPMs may be satisfied via UE positioning in the Phase II demonstration.
Tiered scope. Sensing functions under this use case are tiered by 12-month feasibility. Tier 1 (Phase II demonstration): (a) crowd density and flow analytics derived from network-native UE positioning of connected devices (see the hybrid-localization requirement above), aggregated and anonymized; and (b) at least one non-cooperative RF-sensing bridge function achievable at 5G-Advanced maturity and deployed sensing bandwidths (for example, detection of unauthorized drone incursion exploiting Doppler and motion signatures) demonstrated in a laboratory or limited field configuration. Tier 2 (roadmap):
unattended-object detection and fine-grained tracking of individuals within dense, multi-directional crowds, which are limited by achievable sensing resolution (approximately c/2B) at deployable bandwidths; these shall be addressed in the documented 6G/ISAC evolution path with quantified bandwidth, waveform, aperture, and sensor-fusion requirements rather than demonstrated in Phase II.
Custom or modified waveforms are not required for Phase II. The Positioning/Velocity accuracy, Anomaly Alert, and Missed-Detection/False-Alarm KPMs in the table below apply to the Tier 1 demonstrated function(s).
Use Case 3: Public Safety & First Responder Priority Communications First responders, venue security, and event staff require reliable, prioritized push-to-talk and data communications throughout the bowl, concourses, tunnels, loading docks, and below-grade back-of-house areas that legacy DAS and Wi-Fi frequently fail to reach or fail to prioritize during network congestion.
This use case requires the platform to sustain low-latency, high-reliability, priority/preemption-capable connectivity for public-safety traffic across the full indoor venue footprint, including areas outside typical fan-facing coverage design.
OSW/Future G - 5
Use Case 4: Venue Operations, Logistics & Outdoor Perimeter Coverage Loading docks, outdoor plazas, parking structures, and perimeter areas surrounding a venue increasingly require connectivity for autonomous cleaning and security robots, connected cameras, RFID/asset tracking for concessions and merchandise logistics, and credentialed-access control, yet typically fall outside indoor DAS/Wi-Fi coverage entirely. This use case requires the platform to extend secure, private coverage into outdoor plaza, parking, and perimeter areas immediately adjacent to the venue, using the same OCUDU-based infrastructure rather than a separate outdoor Wi-Fi or cellular repeater buildout.
KPMs for Phase II For Phase II, proposers should address specific, relevant, measurable, and quantifiable key performance metrics (KPMs), including, for example, concurrent-device density, sensing detection accuracy, latency, jitter, and service availability. An example KPM in context could be as follows: "The platform must sustain a session success rate greater than 99.5% for fan-facing connections at a concurrent-device density of 3,000 devices per acre in the lower bowl." Other suggested KPMs for the various use cases and system requirements are given below for reference.
The KPM values in the tables below are suggested reference values, not pass/fail contract requirements.
Proposers shall propose specific, justified KPM targets in the Technical Volume, calibrated to their selected use cases, demonstration environment, spectrum plan, and channel bandwidth; deviations from the suggested values must be technically justified. Threshold values represent the intended standard of Phase II demonstration success; Objective values are stretch goals, some of which are expected to mature during Phase III or along the FutureG evolution path. Final KPM targets will be agreed with the Government at kickoff and confirmed at the Critical Design Review. Consistent with Section 4.1, partial achievement within a defined and documented scope may be considered successful.
Latency measurement definition. Latency KPMs in this document denote round-trip application-layer latency measured between the UE application interface and the local edge application endpoint served behind the on-site/edge UPF (i.e., device-to-edge through the RAN and core user plane, excluding external WAN transport). Handover time denotes user-plane interruption time at the RAN, per 3GPP definitions. For each latency KPM adopted, proposers shall specify the measurement reference points, the traffic type and packet size, and the measurement methodology (e.g., KPI definitions per 3GPP TS 28.554), and shall include in the Critical Design Document a latency budget decomposition across air interface, DU/CU processing, fronthaul and F1 transport, core user plane, and application processing.
Suggested KPMs for Use Case 1: High-Density Fan Connectivity & Broadcast/Production Backhaul These metrics focus on the platform's ability to sustain high device density and dedicated broadcast/production bandwidth during peak event moments. Thresholds are anchored to published stadium Wi-Fi/DAS deployment data; a particular venue's own concurrent-connection and peak-throughput figures may be used instead to calibrate a proposer's specific KPM targets.
KPM Category Key Performance Metric (KPM) Suggested Threshold
(Minimum Success) Suggested Objective (Desired Success)
Scalability Concurrent Connection Take Rate:
Percentage of ticketed attendance connected to the platform simultaneously during peak load.
20,000 devices 60,000 devices
Throughput [small/medium venue config.]
Aggregate Peak Throughput: Combined uplink/downlink throughput sustained across the platform during peak load.
> 10 Gbps aggregate > 15 Gbps aggregate
Reliability Session Success Rate: Percentage of data sessions completed without error or
> 99% > 99.9%
OSW/Future G - 6
KPM Category Key Performance Metric (KPM) Suggested Threshold (Minimum Success)
Suggested Objective (Desired Success) drop during peak event moments (kickoff, halftime, egress).
Timeliness Broadcast Backhaul Latency & Jitter:
Round-trip latency and jitter for production camera/audio uplink traffic.
< 30 ms latency, < 10 ms jitter
< 15 ms latency, < 5 ms jitter
Per-User Throughput
Per-Active-User Experienced Data Rate: data rate experienced by active users at the 95th percentile during peak event moments.
≥ 5 Mbps DL / ≥ 2 Mbps
UL
≥ 25 Mbps DL / ≥ 10 Mbps UL (consistent with 3GPP TS 22.261 dense-crowd targets)
Note: The connection-count and throughput rows above size the network as a whole; they are not meant to be divided into a per-device rate. At any moment most connected devices are idle, so the average per connected device is naturally low (a few hundred kbps). The performance an individual user must actually experience is set by the Per-Active-User Experienced Data Rate KPM above.
Suggested KPMs for Use Case 2: ISAC-Enabled Crowd Analytics & Situational Awareness (6G-Ready) These metrics measure the platform's ability to deliver accurate, low-latency sensing insight using shared radio infrastructure, alongside its ability to maintain communication-traffic performance while sensing is active.
KPM Category Key Performance Metric (KPM) Suggested Threshold
(Minimum Success) Suggested Objective (Desired Success)
Sensing Accuracy (Position)
Positioning Accuracy: Deviation between ISAC-derived object/person position estimate and ground truth.
1 - 10 m 1 - 10 cm (long-term research target)
Sensing Accuracy (Velocity)
Velocity Accuracy: Deviation between ISAC-derived velocity estimate of a moving object/person and ground truth.
1 - 10 m/s < 1 m/s
Timeliness Anomaly Alert Latency: Time from a sensing-detected anomaly (e.g., unauthorized drone incursion, unattended object, crowd-crush precursor) to alert receipt at the monitoring system.
< 3 seconds < 1 second
Reliability Missed-Detection / False-Alarm Probability: Percentage of anomaly events missed or falsely flagged by the ISAC sensing function (per the missed-detection and false-alarm KPIs defined in 3GPP TS 22.137).
< 5% missed detection, < 10% false alarm
< 1% missed detection, < 3% false alarm
Coexistence Communication-Throughput Impact:
Percentage reduction in available communication throughput attributable to concurrent sensing operation.
< 15% reduction < 5% reduction
Coverage Sensing Range: Effective sensing radius from a single gNB/O-RU for crowd and object detection.
> 50 meters > 100 meters
OSW/Future G - 7
Suggested Objective (Desired Success)
Sensing Resolution (Tier 2 / lab and roadmap)
Range Resolution: minimum separable distance between two objects, per 3GPP TS 22.137, at the demonstrated effective sensing bandwidth.
≤ 2 m (laboratory, ≥ 100 MHz effective sensing bandwidth)
≤ 0.5 m (roadmap;
documented path via wider bandwidth/6G waveforms)
Positioning (Tier 1) UE Positioning Accuracy: horizontal positioning error for connected devices using NR positioning methods (Rel- 16/17), at 90% confidence, across bowl and concourse areas.
< 10 m < 3 m
Suggested KPMs for Use Case 3: Public Safety & First Responder Priority Communications These metrics measure the platform's ability to deliver reliable, prioritized, low-latency coverage for safety-critical communications across the full venue footprint, including areas not typically covered by fan-facing design. Thresholds are anchored to 3GPP mission-critical push-to-talk standards and the IFC/NFPA in-building public-safety radio coverage codes already applied to venue construction.
KPM Category Key Performance Metric (KPM) Suggested Threshold
(Minimum Success) Suggested Objective (Desired Success)
Timeliness Push-to-Talk Access Time: Time from a first-responder PTT keypress to receipt of permission to speak.
< 300 ms < 150 ms
Availability Service Availability: Percentage of time the network is operational for safety-priority traffic in public-safety-designated zones.
> 99.9% > 99.999%
Coverage Coverage Completeness: Percentage of designated public-safety zones (tunnels, back-of-house, below-grade areas, loading docks) with verified signal coverage.
> 95% general areas / 99% critical areas (IFC 510 / NFPA 1225 minimum)
100%
Priority Preemption Success Rate: Percentage of instances where public-safety traffic is successfully prioritized over congested fan-facing traffic during peak load.
> 99% > 99.9%
Suggested KPMs for Use Case 4: Venue Operations, Logistics & Outdoor Perimeter Coverage These metrics measure the platform's ability to extend secure, private coverage into outdoor plaza, parking, and perimeter areas adjacent to the venue and to support mobile operational assets such as autonomous robots and connected cameras. Coverage-radius thresholds are informed by published CBRS small-cell propagation figures.
KPM Category Key Performance Metric (KPM) Suggested Threshold
(Minimum Success) Suggested Objective (Desired Success)
Coverage Outdoor Coverage Radius: Distance from the nearest small cell at which the platform maintains a usable connection for plaza, parking, and perimeter assets
> 200 meters (~650 ft, consistent with CBRS Category A)
> 500 meters (~1,640 ft, within CBRS Category B outdoor range)
Mobility Handover Success Rate: Percentage of handovers completed without session drop as autonomous robots or connected
> 98% > 99.5%
OSW/Future G - 8
Suggested Objective (Desired Success) vehicles move between indoor and outdoor coverage.
Reliability Session Success Rate (Outdoor):
Percentage of data sessions completed without error or drop in outdoor perimeter conditions.
> 98% > 99.5%
Security Unauthorized Access Attempts Blocked: Percentage of unauthorized association/connection attempts detected and blocked at the outdoor perimeter.
> 99% 100%
Suggested KPMs for General System & Architectural Requirements These metrics focus on the non-functional requirements of the all-open-source stack itself, ensuring it is efficient, scalable, interoperable, 6G-evolvable, and compliant with the O-RAN architecture.
KPM Category Key Performance Metric (KPM) Suggested Threshold
(Minimum Success) Suggested Objective (Desired Success)
Interoperability RTEC-Validated Reference Configurations: Number of distinct RU/hardware-accelerator/RIC-SMO combinations validated through RTEC testing and available as reusable reference configurations.
≥ 2 combinations ≥ 5 combinations
Compliance O-RAN Interface Compliance:
Adherence to specified O-RAN Alliance interface standards (E1, F1-C/F1-U, O- RAN 7.2x, O1, E2).
100% pass of a defined conformance test suite
100% pass of a defined conformance test suite
Economics Fully Loaded Deployment Cost: Total cost (hardware, integration, support).
≤ 30% of an equivalent DAS system
≤ 20% of equivalent DAS system
Scalability Managed Device Capacity: Number of concurrent fan, operations, and sensing-relevant devices a single deployment can support.
20,000 devices 60,000 devices
Evolvability 6G/ISAC Readiness: Demonstrated bridge-path capability (via 5G- Advanced sensing features) toward native 6G Integrated Sensing and Communication.
Documented roadmap with lab-validated bridge feature(s)
Field-demonstrated bridge feature(s) at pilot site
Licensing Proprietary Component Count: Number of proprietary core, RIC, or SMO components in the deployed stack.
0 0
Device-Class Support
RedCap UE Support: demonstrated attach, session establishment, and mobility for Rel-17 RedCap UEs (or emulated RedCap profiles where commercial devices are unavailable).
Lab-validated Field-demonstrated at the pilot/demonstration site
OSW/Future G - 9
Phase II consists of an eighteen-month PoP focused on prototype production, test, and evaluation. Key milestones include:
• Month 1: Kickoff and TIM
• Monthly Status Reports (MSRs)
• Month 12: Critical Design Review (CDR)
• Month 16: Prototype demonstration
• Month 14: Final design review, demonstration, and assessment
• Month 18: Final Phase II Report
MSRs are to be presented to the OCUDU T&E Working Group as well, bringing the community up to speed on progress. Prototype demonstrations will be performed at the proposer's site, ideally an operating or representative venue/stadium environment (or a full-scale representative test bed where live-venue access is not feasible during Phase II). Partial solutions may be considered successful if effective within a defined scope. A final technical report detailing the capabilities demonstrated will be required. Extended user evaluations or additional prototypes may be pursued based on utility.
OCUDU and Open-Source Integration The Open Centralized Unit Distributed Unit (OCUDU) software codebase is released and continuously enhanced with a 3GPP-compliant open-source Centralized Unit (CU) and Distributed Unit (DU) implementation supporting open interfaces. Proposers should integrate OCUDU together with SD-Core (5G Core), SD-RAN (Near-RT RIC), and the OSC stack (Non-RT RIC and SMO) into a single, fully open-source reference architecture, with no proprietary core, RIC, or SMO component anywhere in the stack. Proposers should additionally document, and where feasible demonstrate, the specific RAN and RIC-application changes required to bridge toward native 6G ISAC capability.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .