About this opportunity
The Federal Aviation Administration, Southwestern Region is soliciting HVAC replacement at its Salt Lake City Airport Surveillance Radar facility near Morgan, Utah, with proposals due August 25, 2026. This is a total small business set-aside under NAICS 238220.
Place of performance is Morgan, Utah (Francis Peak, 4101'58.6"N 11150'18.5"W). The contractor must furnish all labor, equipment, materials, and supervision for demolition of two existing York Johnson Controls 15-ton units and installation of two new 15-ton AAON SB Series Model SB01620L000 units or FAA-approved American-made equal, with R-454b refrigerant, economizers, low ambient cooling capability, and freeze stats. Additional scope includes replacement of 50 ceiling tiles with LED fixtures, installation of counterbalanced back-draft dampers, comprehensive arc flash study per NFPA 70E, NFPA 70, IEEE 1584, and FAA JO 3900.64, electrical work, maintenance equipment provisioning, and minimum 3-year extended warranty. A temporary cooling solution with 24-hour run-in test certification is required to maintain continuous operations during transition. Performance period is 30 days from notice to proceed. Full redundancy of HVAC systems must be maintained throughout construction. The contractor must perform at least 25 percent of total contract work on-site using its own organization, though this percentage may be reduced at the Contracting Officer's discretion.
The estimated contract value is $250,000 to $500,000. Performance and payment bonds equal to 100 percent of contract price are required within 5 calendar days of award. Davis-Bacon prevailing wage rates apply. Evaluation uses lowest-price, technically-acceptable methodology, weighing relevant experience (three prior $250,000-plus HVAC replacement contracts over five years) and technical proposal equally. General liability insurance minimum is $500,000 per occurrence. Amendment 0002 (August 19) changed equipment specification to AAON SB Series Model SB01620L000 and extended proposal deadline from August 18 to August 25. All units must comply with Buy American Preference requirements.
Notice text
4 versions
Update #4 · Latest ·
Amendment 0002 – August 19, 2026
The purpose of this amendment is to provide a revision to the Statement of Work, and to extend the bid due date.
Statement of Work, page 2, Item A Installations, New Air Conditioners - Equipment Room, Number 1: The HVAC unit is revised to AAON SB Series. Model # SB01620L000 or FAA approved equal.
Any unit submitted for approval must be American made.
The proposal due date is hereby changed from August 18, 2026; 3:00pm EDT to August 25, 2026; 3:00pm EDT. All other terms and conditions remain unchanged.
Review the new information and all requirements in accordance with 697DCK-26-R-00315, Amendment 0001 and SA18 PROPOSAL CONTENT on page(s) 57-58 of the solicitation prior to submitting a bid/proposal. ACKNOWLEDGEMENT OF AMENDMENTS, Section 19 (page 2), must be completed and returned with your bid/proposal.
XXXXXXXXXX
Amendment, August 18, 2026
An amendment is expected to be issued for Solicitation 697DCK-26-R-00315 - SLC ARSR HVAC Replacement;
The purpose of this amendment if to clarify the HVAC specifications for this requirement.
The amendment will also extend the bid due date from August 18, 2026 to August 25, 2026; 3pm EDT.
XXXXXXXXXX
08/13/2026
Requests For Information (RFIs)
An addition to Solicitation 697DCK-26-R-00315 has been issued.
The purpose of the addition is to provide responses to Requests for Information (RFIs) regarding the subject matter project. A total of two (2) documents have been added, including one (1) document that contains all the RFIs and one (1) attachment. All the documents have "RFI" in the title.
NO CHANGE to the proposal due date, August 18, 2026; 3:00pm EDT; and all other terms and conditions remain unchanged.
XXXXXXXX
Amendment 0001 – August 3, 2026
The purpose of this amendment is to provide a revision to the Statement of Work, add AMS Clause 3.2.2.3-41 PERFORMING WORK (APR 2024), and to extend the Request for Information (RFI) and bid due dates.
The Statement of Work is amended as follows:
- Page 2, Add - Item A Installations, New Air Conditioners, number 1: Add after “Provide and install” the following: “ 2 each new 15 Ton Carrier Omnizone 50 XCR HVAC units or.” Any unit submitted for approval must be American Made.
- Page 4, Change - Ceiling Tiles , change item 1a, to “50” not 25.
- Page 5, Clarification - Security Bars: There is no requirement for any exterior penetrations and therefore no need for any security bars installation.
AMS Clause 3.2.2.3-41 PERFORMING WORK (APR 2024) “The Contractor must perform, using its own organization, work equivalent to at least twenty-five (25) percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if the Contractor requests a reduction and the CO determines that it would be to the FAA's advantage to do so” has been added to Section I.
The Request for Information (RFI) due date has been changed to August 7, 2026; 2:00pm. Lastly, the proposal due date is hereby changed from August 11, 2026; 3:00pm EDT to August 18, 2026; 3:00pm EDT. All other terms and conditions remain unchanged.
Review the new information and all requirements in accordance with SA18 PROPOSAL CONTENT on page(s) 57-58 of the solicitation prior to submitting a bid/proposal.
ACKNOWLEDGEMENT OF AMENDMENTS, Section 19 (page 2), must be completed and returned with your bid/proposal.
XXXXXXXXXXXXXXXX
The Federal Aviation Administration (FAA), Eastern Acquisitions-AAQ-570, College Park, GA, is issuing Screening Information Request (SIR) Number 697DCK-26-R-00315, SLC ARSR HVAC Replacement, Salt Lake City UT, as detailed in the Statement of Work (SOW) attached to the Solicitation in accordance with the Acquisition Management System (AMS) 3.2.2.2 Policy as supplemented with additional information included in this notice.
The selected Contractor will remove and dispose of the existing two (2) HVAC units and associated ductwork; and provide and install two (2) new York Johnson Controls 15-Ton (DSV180A2E1DAA0A-D), or FAA approved equal, air-conditioning units with ductwork, HVAC controls, and all associated components.
The FAA contemplates award of a Firm Fixed Price Contract as a result of this solicitation.
This requirement is set-aside and offered to all small business concerns.
The NAICS code for this acquisition is 238220 – Plumbing, Heating, and Air Conditioning Contractors - $19 Million.
The estimated cost magnitude for this project is between $250,000 and $500,000.
Projected Period of Performance for this project is approximately 30 calendar days.
All interested sources should first attempt to download the attached SIR document(s). If downloading is not possible, all requests for copies of the SIR document(s) must be made in writing to the attention of Marc Lemay, Contracting Officer (AAQ-570), via e-mail at Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov
NOTE: Electronic submission is preferred. The electronic submission should be in either Microsoft WORD format or portable document format (PDF), not in a zipped format. Please note that the FAA e-mail server restricts file size to 10MB per email message, therefore, responses may have to be submitted in more than one e-mail to be received.
There is an optional site visit on July 28, 2026, at 10:00am. This is the only site visit that will be scheduled for the anticipated project; and no individual site visits will be permitted.
Meeting point: Francis Peak Road, Salt Lake City (Morgan), UT 84050 | 41°01'58.6"N 111°50'18.5"W - Google Maps.
To attend the site visit, advanced notice via Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov is required. Note: The site visit will be canceled without notice, if no notices of attendance are received by July 24, 2026, at 3:00pm ET.
All Questions/Requests for Information (RFI) must be emailed to Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov no later than July 31, 2026; 2:00pm Eastern Daylight Time (EDT) to allow sufficient time to respond. TELEPHONE INQUIRIES WILL NOT BE ACCEPTED.
No questions concerning the project will be answered during the site visit unless the Contracting Officer or the Contracting Officer's Representative is present at the site visit: however, no changes are made to the SIR unless a written amendment is issued. The FAA assumes no responsibility for any conclusions or interpretations made by the contractor based on the information received by any means other than in writing from the Contracting Officer. The FAA does not assume responsibility for any understanding reached or representation made concerning conditions, which can affect the work, by any of its officers or agents before the execution of this contract, unless that understanding, or representation is expressly stated in the contract.
Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the solicitation process. Proposals must be received by email no later than August 11, 2026; 3:00 PM EDT to Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov
When responding to this Screening Information Request/Request for Proposal (SIR/RFP), each offeror is required to submit a technical proposal AND a cost proposal in accordance with Clause SA18 – Proposal Content outlined in Section L, page(s) 57-58 of the Screening Information Request (SIR).
In accordance with SIR Section L provision 3.2.2.3-14 entitled, "Late Submissions, Modifications, and Withdrawals of Submittals," any proposal received after the due time and date of 3:00p.m. EDT, August 11, 2026, will not be considered. In addition, if all requested information is not furnished in the offeror's proposal, the offeror's proposal may be determined to be non-responsive and ineligible for consideration for contract award.
To be considered for award of this project, the contractor must be currently registered in the System for Award Management (SAM) database (website: www.sam.gov).
This SIR/RFQ is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of requested proposal documentation. No individual notification of any amendments will be provided. It is the Offeror’s responsibility to visit this website frequently for updates on this procurement. Acquisition Management System (AMS) applies to FAA in place of the Federal Acquisition Regulation (FAR) and various other provisions of Federal acquisition law.
Update #3 ·
Amendment, August 18, 2026
An amendment is expected to be issued for Solicitation 697DCK-26-R-00315 - SLC ARSR HVAC Replacement;
The purpose of this amendment if to clarify the HVAC specifications for this requirement.
The amendment will also extend the bid due date from August 18, 2026 to August 25, 2026; 3pm EDT.
XXXXXXXXXX
08/13/2026
Requests For Information (RFIs)
An addition to Solicitation 697DCK-26-R-00315 has been issued.
The purpose of the addition is to provide responses to Requests for Information (RFIs) regarding the subject matter project. A total of two (2) documents have been added, including one (1) document that contains all the RFIs and one (1) attachment. All the documents have "RFI" in the title.
NO CHANGE to the proposal due date, August 18, 2026; 3:00pm EDT; and all other terms and conditions remain unchanged.
XXXXXXXX
Amendment 0001 – August 3, 2026
The purpose of this amendment is to provide a revision to the Statement of Work, add AMS Clause 3.2.2.3-41 PERFORMING WORK (APR 2024), and to extend the Request for Information (RFI) and bid due dates.
The Statement of Work is amended as follows:
- Page 2, Add - Item A Installations, New Air Conditioners, number 1: Add after “Provide and install” the following: “ 2 each new 15 Ton Carrier Omnizone 50 XCR HVAC units or.” Any unit submitted for approval must be American Made.
- Page 4, Change - Ceiling Tiles , change item 1a, to “50” not 25.
- Page 5, Clarification - Security Bars: There is no requirement for any exterior penetrations and therefore no need for any security bars installation.
AMS Clause 3.2.2.3-41 PERFORMING WORK (APR 2024) “The Contractor must perform, using its own organization, work equivalent to at least twenty-five (25) percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if the Contractor requests a reduction and the CO determines that it would be to the FAA's advantage to do so” has been added to Section I.
The Request for Information (RFI) due date has been changed to August 7, 2026; 2:00pm. Lastly, the proposal due date is hereby changed from August 11, 2026; 3:00pm EDT to August 18, 2026; 3:00pm EDT. All other terms and conditions remain unchanged.
Review the new information and all requirements in accordance with SA18 PROPOSAL CONTENT on page(s) 57-58 of the solicitation prior to submitting a bid/proposal.
ACKNOWLEDGEMENT OF AMENDMENTS, Section 19 (page 2), must be completed and returned with your bid/proposal.
XXXXXXXXXXXXXXXX
The Federal Aviation Administration (FAA), Eastern Acquisitions-AAQ-570, College Park, GA, is issuing Screening Information Request (SIR) Number 697DCK-26-R-00315, SLC ARSR HVAC Replacement, Salt Lake City UT, as detailed in the Statement of Work (SOW) attached to the Solicitation in accordance with the Acquisition Management System (AMS) 3.2.2.2 Policy as supplemented with additional information included in this notice.
The selected Contractor will remove and dispose of the existing two (2) HVAC units and associated ductwork; and provide and install two (2) new York Johnson Controls 15-Ton (DSV180A2E1DAA0A-D), or FAA approved equal, air-conditioning units with ductwork, HVAC controls, and all associated components.
The FAA contemplates award of a Firm Fixed Price Contract as a result of this solicitation.
This requirement is set-aside and offered to all small business concerns.
The NAICS code for this acquisition is 238220 – Plumbing, Heating, and Air Conditioning Contractors - $19 Million.
The estimated cost magnitude for this project is between $250,000 and $500,000.
Projected Period of Performance for this project is approximately 30 calendar days.
All interested sources should first attempt to download the attached SIR document(s). If downloading is not possible, all requests for copies of the SIR document(s) must be made in writing to the attention of Marc Lemay, Contracting Officer (AAQ-570), via e-mail at Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov
NOTE: Electronic submission is preferred. The electronic submission should be in either Microsoft WORD format or portable document format (PDF), not in a zipped format. Please note that the FAA e-mail server restricts file size to 10MB per email message, therefore, responses may have to be submitted in more than one e-mail to be received.
There is an optional site visit on July 28, 2026, at 10:00am. This is the only site visit that will be scheduled for the anticipated project; and no individual site visits will be permitted.
Meeting point: Francis Peak Road, Salt Lake City (Morgan), UT 84050 | 41°01'58.6"N 111°50'18.5"W - Google Maps.
To attend the site visit, advanced notice via Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov is required. Note: The site visit will be canceled without notice, if no notices of attendance are received by July 24, 2026, at 3:00pm ET.
All Questions/Requests for Information (RFI) must be emailed to Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov no later than July 31, 2026; 2:00pm Eastern Daylight Time (EDT) to allow sufficient time to respond. TELEPHONE INQUIRIES WILL NOT BE ACCEPTED.
No questions concerning the project will be answered during the site visit unless the Contracting Officer or the Contracting Officer's Representative is present at the site visit: however, no changes are made to the SIR unless a written amendment is issued. The FAA assumes no responsibility for any conclusions or interpretations made by the contractor based on the information received by any means other than in writing from the Contracting Officer. The FAA does not assume responsibility for any understanding reached or representation made concerning conditions, which can affect the work, by any of its officers or agents before the execution of this contract, unless that understanding, or representation is expressly stated in the contract.
Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the solicitation process. Proposals must be received by email no later than August 11, 2026; 3:00 PM EDT to Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov
When responding to this Screening Information Request/Request for Proposal (SIR/RFP), each offeror is required to submit a technical proposal AND a cost proposal in accordance with Clause SA18 – Proposal Content outlined in Section L, page(s) 57-58 of the Screening Information Request (SIR).
In accordance with SIR Section L provision 3.2.2.3-14 entitled, "Late Submissions, Modifications, and Withdrawals of Submittals," any proposal received after the due time and date of 3:00p.m. EDT, August 11, 2026, will not be considered. In addition, if all requested information is not furnished in the offeror's proposal, the offeror's proposal may be determined to be non-responsive and ineligible for consideration for contract award.
To be considered for award of this project, the contractor must be currently registered in the System for Award Management (SAM) database (website: www.sam.gov).
This SIR/RFQ is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of requested proposal documentation. No individual notification of any amendments will be provided. It is the Offeror’s responsibility to visit this website frequently for updates on this procurement. Acquisition Management System (AMS) applies to FAA in place of the Federal Acquisition Regulation (FAR) and various other provisions of Federal acquisition law.
Update #2 ·
08/13/2026
Requests For Information (RFIs)
An addition to Solicitation 697DCK-26-R-00315 has been issued.
The purpose of the addition is to provide responses to Requests for Information (RFIs) regarding the subject matter project. A total of two (2) documents have been added, including one (1) document that contains all the RFIs and one (1) attachment. All the documents have "RFI" in the title.
NO CHANGE to the proposal due date, August 18, 2026; 3:00pm EDT; and all other terms and conditions remain unchanged.
XXXXXXXX
Amendment 0001 – August 3, 2026
The purpose of this amendment is to provide a revision to the Statement of Work, add AMS Clause 3.2.2.3-41 PERFORMING WORK (APR 2024), and to extend the Request for Information (RFI) and bid due dates.
The Statement of Work is amended as follows:
- Page 2, Add - Item A Installations, New Air Conditioners, number 1: Add after “Provide and install” the following: “ 2 each new 15 Ton Carrier Omnizone 50 XCR HVAC units or.” Any unit submitted for approval must be American Made.
- Page 4, Change - Ceiling Tiles , change item 1a, to “50” not 25.
- Page 5, Clarification - Security Bars: There is no requirement for any exterior penetrations and therefore no need for any security bars installation.
AMS Clause 3.2.2.3-41 PERFORMING WORK (APR 2024) “The Contractor must perform, using its own organization, work equivalent to at least twenty-five (25) percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if the Contractor requests a reduction and the CO determines that it would be to the FAA's advantage to do so” has been added to Section I.
The Request for Information (RFI) due date has been changed to August 7, 2026; 2:00pm. Lastly, the proposal due date is hereby changed from August 11, 2026; 3:00pm EDT to August 18, 2026; 3:00pm EDT. All other terms and conditions remain unchanged.
Review the new information and all requirements in accordance with SA18 PROPOSAL CONTENT on page(s) 57-58 of the solicitation prior to submitting a bid/proposal.
ACKNOWLEDGEMENT OF AMENDMENTS, Section 19 (page 2), must be completed and returned with your bid/proposal.
XXXXXXXXXXXXXXXX
The Federal Aviation Administration (FAA), Eastern Acquisitions-AAQ-570, College Park, GA, is issuing Screening Information Request (SIR) Number 697DCK-26-R-00315, SLC ARSR HVAC Replacement, Salt Lake City UT, as detailed in the Statement of Work (SOW) attached to the Solicitation in accordance with the Acquisition Management System (AMS) 3.2.2.2 Policy as supplemented with additional information included in this notice.
The selected Contractor will remove and dispose of the existing two (2) HVAC units and associated ductwork; and provide and install two (2) new York Johnson Controls 15-Ton (DSV180A2E1DAA0A-D), or FAA approved equal, air-conditioning units with ductwork, HVAC controls, and all associated components.
The FAA contemplates award of a Firm Fixed Price Contract as a result of this solicitation.
This requirement is set-aside and offered to all small business concerns.
The NAICS code for this acquisition is 238220 – Plumbing, Heating, and Air Conditioning Contractors - $19 Million.
The estimated cost magnitude for this project is between $250,000 and $500,000.
Projected Period of Performance for this project is approximately 30 calendar days.
All interested sources should first attempt to download the attached SIR document(s). If downloading is not possible, all requests for copies of the SIR document(s) must be made in writing to the attention of Marc Lemay, Contracting Officer (AAQ-570), via e-mail at Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov
NOTE: Electronic submission is preferred. The electronic submission should be in either Microsoft WORD format or portable document format (PDF), not in a zipped format. Please note that the FAA e-mail server restricts file size to 10MB per email message, therefore, responses may have to be submitted in more than one e-mail to be received.
There is an optional site visit on July 28, 2026, at 10:00am. This is the only site visit that will be scheduled for the anticipated project; and no individual site visits will be permitted.
Meeting point: Francis Peak Road, Salt Lake City (Morgan), UT 84050 | 41°01'58.6"N 111°50'18.5"W - Google Maps.
To attend the site visit, advanced notice via Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov is required. Note: The site visit will be canceled without notice, if no notices of attendance are received by July 24, 2026, at 3:00pm ET.
All Questions/Requests for Information (RFI) must be emailed to Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov no later than July 31, 2026; 2:00pm Eastern Daylight Time (EDT) to allow sufficient time to respond. TELEPHONE INQUIRIES WILL NOT BE ACCEPTED.
No questions concerning the project will be answered during the site visit unless the Contracting Officer or the Contracting Officer's Representative is present at the site visit: however, no changes are made to the SIR unless a written amendment is issued. The FAA assumes no responsibility for any conclusions or interpretations made by the contractor based on the information received by any means other than in writing from the Contracting Officer. The FAA does not assume responsibility for any understanding reached or representation made concerning conditions, which can affect the work, by any of its officers or agents before the execution of this contract, unless that understanding, or representation is expressly stated in the contract.
Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the solicitation process. Proposals must be received by email no later than August 11, 2026; 3:00 PM EDT to Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov
When responding to this Screening Information Request/Request for Proposal (SIR/RFP), each offeror is required to submit a technical proposal AND a cost proposal in accordance with Clause SA18 – Proposal Content outlined in Section L, page(s) 57-58 of the Screening Information Request (SIR).
In accordance with SIR Section L provision 3.2.2.3-14 entitled, "Late Submissions, Modifications, and Withdrawals of Submittals," any proposal received after the due time and date of 3:00p.m. EDT, August 11, 2026, will not be considered. In addition, if all requested information is not furnished in the offeror's proposal, the offeror's proposal may be determined to be non-responsive and ineligible for consideration for contract award.
To be considered for award of this project, the contractor must be currently registered in the System for Award Management (SAM) database (website: www.sam.gov).
This SIR/RFQ is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of requested proposal documentation. No individual notification of any amendments will be provided. It is the Offeror’s responsibility to visit this website frequently for updates on this procurement. Acquisition Management System (AMS) applies to FAA in place of the Federal Acquisition Regulation (FAR) and various other provisions of Federal acquisition law.
Update #1 ·
Amendment 0001 – August 3, 2026
The purpose of this amendment is to provide a revision to the Statement of Work, add AMS Clause 3.2.2.3-41 PERFORMING WORK (APR 2024), and to extend the Request for Information (RFI) and bid due dates.
The Statement of Work is amended as follows:
- Page 2, Add - Item A Installations, New Air Conditioners, number 1: Add after “Provide and install” the following: “ 2 each new 15 Ton Carrier Omnizone 50 XCR HVAC units or.” Any unit submitted for approval must be American Made.
- Page 4, Change - Ceiling Tiles , change item 1a, to “50” not 25.
- Page 5, Clarification - Security Bars: There is no requirement for any exterior penetrations and therefore no need for any security bars installation.
AMS Clause 3.2.2.3-41 PERFORMING WORK (APR 2024) “The Contractor must perform, using its own organization, work equivalent to at least twenty-five (25) percent of the total amount of work under the contract on the site. The CO may modify this contract to reduce this percentage if the Contractor requests a reduction and the CO determines that it would be to the FAA's advantage to do so” has been added to Section I.
The Request for Information (RFI) due date has been changed to August 7, 2026; 2:00pm. Lastly, the proposal due date is hereby changed from August 11, 2026; 3:00pm EDT to August 18, 2026; 3:00pm EDT. All other terms and conditions remain unchanged.
Review the new information and all requirements in accordance with SA18 PROPOSAL CONTENT on page(s) 57-58 of the solicitation prior to submitting a bid/proposal.
ACKNOWLEDGEMENT OF AMENDMENTS, Section 19 (page 2), must be completed and returned with your bid/proposal.
XXXXXXXXXXXXXXXX
The Federal Aviation Administration (FAA), Eastern Acquisitions-AAQ-570, College Park, GA, is issuing Screening Information Request (SIR) Number 697DCK-26-R-00315, SLC ARSR HVAC Replacement, Salt Lake City UT, as detailed in the Statement of Work (SOW) attached to the Solicitation in accordance with the Acquisition Management System (AMS) 3.2.2.2 Policy as supplemented with additional information included in this notice.
The selected Contractor will remove and dispose of the existing two (2) HVAC units and associated ductwork; and provide and install two (2) new York Johnson Controls 15-Ton (DSV180A2E1DAA0A-D), or FAA approved equal, air-conditioning units with ductwork, HVAC controls, and all associated components.
The FAA contemplates award of a Firm Fixed Price Contract as a result of this solicitation.
This requirement is set-aside and offered to all small business concerns.
The NAICS code for this acquisition is 238220 – Plumbing, Heating, and Air Conditioning Contractors - $19 Million.
The estimated cost magnitude for this project is between $250,000 and $500,000.
Projected Period of Performance for this project is approximately 30 calendar days.
All interested sources should first attempt to download the attached SIR document(s). If downloading is not possible, all requests for copies of the SIR document(s) must be made in writing to the attention of Marc Lemay, Contracting Officer (AAQ-570), via e-mail at Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov
NOTE: Electronic submission is preferred. The electronic submission should be in either Microsoft WORD format or portable document format (PDF), not in a zipped format. Please note that the FAA e-mail server restricts file size to 10MB per email message, therefore, responses may have to be submitted in more than one e-mail to be received.
There is an optional site visit on July 28, 2026, at 10:00am. This is the only site visit that will be scheduled for the anticipated project; and no individual site visits will be permitted.
Meeting point: Francis Peak Road, Salt Lake City (Morgan), UT 84050 | 41°01'58.6"N 111°50'18.5"W - Google Maps.
To attend the site visit, advanced notice via Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov is required. Note: The site visit will be canceled without notice, if no notices of attendance are received by July 24, 2026, at 3:00pm ET.
All Questions/Requests for Information (RFI) must be emailed to Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov no later than July 31, 2026; 2:00pm Eastern Daylight Time (EDT) to allow sufficient time to respond. TELEPHONE INQUIRIES WILL NOT BE ACCEPTED.
No questions concerning the project will be answered during the site visit unless the Contracting Officer or the Contracting Officer's Representative is present at the site visit: however, no changes are made to the SIR unless a written amendment is issued. The FAA assumes no responsibility for any conclusions or interpretations made by the contractor based on the information received by any means other than in writing from the Contracting Officer. The FAA does not assume responsibility for any understanding reached or representation made concerning conditions, which can affect the work, by any of its officers or agents before the execution of this contract, unless that understanding, or representation is expressly stated in the contract.
Potential offerors should note that the FAA reserves the right to communicate with one or more offerors at any time during the solicitation process. Proposals must be received by email no later than August 11, 2026; 3:00 PM EDT to Marc.Lemay@faa.gov and Suzanne.T-CTR.Huggins@faa.gov
When responding to this Screening Information Request/Request for Proposal (SIR/RFP), each offeror is required to submit a technical proposal AND a cost proposal in accordance with Clause SA18 – Proposal Content outlined in Section L, page(s) 57-58 of the Screening Information Request (SIR).
In accordance with SIR Section L provision 3.2.2.3-14 entitled, "Late Submissions, Modifications, and Withdrawals of Submittals," any proposal received after the due time and date of 3:00p.m. EDT, August 11, 2026, will not be considered. In addition, if all requested information is not furnished in the offeror's proposal, the offeror's proposal may be determined to be non-responsive and ineligible for consideration for contract award.
To be considered for award of this project, the contractor must be currently registered in the System for Award Management (SAM) database (website: www.sam.gov).
This SIR/RFQ is not to be construed as a contract or a commitment of any kind. The Government shall not be liable for payment of any costs attributed to the preparation and submission of requested proposal documentation. No individual notification of any amendments will be provided. It is the Offeror’s responsibility to visit this website frequently for updates on this procurement. Acquisition Management System (AMS) applies to FAA in place of the Federal Acquisition Regulation (FAR) and various other provisions of Federal acquisition law.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Forest-Wide HVAC Repairs\Upgrades | Forest Service | Total Small Business | |
| HVAC repair JV resource_jordan valley | Oregon-Washington Region | Total Small Business | |
| 16292 Steam Boiler Replacement | Air Force Sustainment Center | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity