SIAD Gas Pipeline Maintenance and Repair

Award Notice Posted

Solicitation number
W912GY18R0036
Agency
Awarded
Set-aside
No set-aside

Opportunity facts

NAICS code
221210 Natural Gas Distribution
PSC
Not on record
Place of performance
Sierra Army Depot Herlong, California 96113, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Army Contracting Command - Warren (ACC-WRN) proposes to release a solicitation for the maintenance and repair effort for the Natural Gas Pipeline located at SIAD, using a FFP, Indefinite Delivery Indefinite Quantity (IDIQ) Contract, with three ordering periods.

Sierra Army Depot will own approximately 76,922 feet of natural gas pipe line. Pipe sizes range from 1,335ft of 1-1/4inch PE, 158ft of 1-1/2inch PE, 5,699ft of 2inch PE, 83ft of 2inch steel, 16,147ft of 3inch PE, 24,249ft of 4inch PE, 28,273ft of 4inch steel and 978ft of 6inch steel. System consists of high, medium and low pressure regulators, valves, meters and cathodic protection. There are approximately 75 regulator stations in the system.


The contractor shall provide and complete all aspects of operation and maintenance pertaining to the gas line including inspection of the natural gas system, performing service calls when needed, preventative maintenance, and all other schedule maintenance and repairs. The contractor is responsible for all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform operational maintenance.
All questions regarding this RFP shall be emailed to Jeffrey Weiss and Richard Morgan. No phone calls will be accepted during the open period.
ONLY PROPOSALS SUBMITTED THROUGH FBO WILL BE CONSIDERED FOR AWARD. EMAILED PROPOSALS WILL NOT BE ACCEPTED.

.

Update #1 ·

Army Contracting Command - Warren (ACC-WRN) proposes to release a solicitation for the maintenance and repair effort for the Natural Gas Pipeline located at SIAD, using a FFP, Indefinite Delivery Indefinite Quantity (IDIQ) Contract, with three ordering periods.

Sierra Army Depot will own approximately 76,922 feet of natural gas pipe line. Pipe sizes range from 1,335ft of 1-1/4inch PE, 158ft of 1-1/2inch PE, 5,699ft of 2inch PE, 83ft of 2inch steel, 16,147ft of 3inch PE, 24,249ft of 4inch PE, 28,273ft of 4inch steel and 978ft of 6inch steel. System consists of high, medium and low pressure regulators, valves, meters and cathodic protection. There are approximately 75 regulator stations in the system.


The contractor shall provide and complete all aspects of operation and maintenance pertaining to the gas line including inspection of the natural gas system, performing service calls when needed, preventative maintenance, and all other schedule maintenance and repairs. The contractor is responsible for all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform operational maintenance.

.

Files

File Type Posted
Gas_Pipeline_Q&A_2.pdf PDF
Gas_Pipeline_Q&A.pdf PDF
Copy_of_Appendix_A_-_Cathodic_Protection.xlsx XLSX spreadsheet
W912GY-18-R-0036.pdf PDF
Copy_of_Appendix_D_-_Valves.xlsx XLSX spreadsheet
Wage_Determination_-_Gas_Pipeline.pdf PDF
Alkaline_Battery_Picture.jpeg JPEG file
Price_Evaluation_Sheet_-_Gas_Pipeline.xlsx XLSX spreadsheet
Copy_of_Appendix_C_-_Regulator_and_Relief_Device_Maintenance.xlsx XLSX spreadsheet
Copy_of_Appendix_B_-_Leak_Line_Survey_Station_Points.xlsx XLSX spreadsheet
Copy_of_Appendix_E_-_Meters.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors