Gas_Pipeline_Q&A_2.pdf
PDF 320 KB Posted
- Attached to
- SIAD Gas Pipeline Maintenance and Repair
- Solicitation number
- W912GY18R0036
About this file
Q&A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Gas_Pipeline_Q&A.pdf | ||
| W912GY-18-R-0036.pdf | ||
| Copy_of_Appendix_B_-_Leak_Line_Survey_Station_Points.xlsx | XLSX spreadsheet | |
| Copy_of_Appendix_A_-_Cathodic_Protection.xlsx | XLSX spreadsheet | |
| Copy_of_Appendix_C_-_Regulator_and_Relief_Device_Maintenance.xlsx | XLSX spreadsheet | |
| Price_Evaluation_Sheet_-_Gas_Pipeline.xlsx | XLSX spreadsheet | |
| Copy_of_Appendix_E_-_Meters.xlsx | XLSX spreadsheet | |
| Copy_of_Appendix_D_-_Valves.xlsx | XLSX spreadsheet | |
| Wage_Determination_-_Gas_Pipeline.pdf | ||
| Alkaline_Battery_Picture.jpeg | JPEG file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gas Pipeline Maintenance and Repair
Q&A
12/27/2018 (version 2)
1) Will the Price Evaluation spreadsheet alone be acceptable, or do both the spreadsheet and section B need to be parceled out?
RESPONSE: Per L.3, The offeror shall legibly fill-in, in U.S. Dollars, the required fields in the Pricing
Spreadsheet. This is the only pricing that should be priced out, not section B. Any prices listed in section B will not be evaluated.
File details come from the government source that posted it.