Services to Disconnect Feeder 47B (13. 8KV underground distribution cable)
Closed Solicitation Posted
- Solicitation number
- ISD-357709-DH
- Agency
-
Fermi National Accelerator Laboratory
Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 23713 Power and Communication Line and Related Structures Construction
- PSC
- 3915 Materials Feeders
- Place of performance
- Batavia, Illinois 60510, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Energy's Fermi National Accelerator Laboratory is seeking a vendor to provide services to disconnect Feeder 47B, a 13.8KV underground distribution cable, at their facility in Batavia, Illinois. The key requirements include dewatering two manholes, identifying the proper cable, disconnecting and capping the cable from the H-splice, cutting and removing the cable from the oil switch, and removing the securing bolts to allow the oil switch to be lifted by Fermilab. The Solicitation Number is ISD-357709-DH, and the request for proposal (RFP) document outlines the scope of work and technical specifications. No specific response due date, award date, pricing terms, or evaluation criteria are provided in the document.
This solicitation does not have a set-aside designation, and no information is provided about potential incumbents or current contractors. The government files do not include any details about the award value or budget range, the quantity of goods or services required, or the timeline for completing the work. The place of performance is the Fermi National Accelerator Laboratory in Batavia, Illinois.
Notice text
Fermilab requires a vendor to disconnect Feeder 47B (13.8KV underground distribution cable) feeding the CHL oil switch. This involves dewatering 2 manholes, ID proper cable on existing H-splice, disconnecting and capping the cable from the H-splice, cutting, and removing the cable from the oil switch. Cut securing bolts and ensure Oil Switch is free to be lifted by Fermilab onto Fermi supplied flatbead.
Files
| File | Type | Posted |
|---|---|---|
| RFP.zip | ZIP file |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| PIP-II f-37 building LWC pump room piping system installation | Fermi National Accelerator Laboratory | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity