Seattle USCH HVAC Optimization

Awarded Award Notice Posted

Solicitation number
47PL0119R0010
Agency
Region 10 Public Buildings Service, General Services Administration
Awarded
to Multi Air Services Engineers, Corp
Set-aside
Total Small Business

Opportunity facts

Contract number
47PL0119C0016 Federal contract award
NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
Not on record
Place of performance
700 Stewart Street Seattle, Washington 98101, United States

Notice details come from SAM.gov. Updated .

Notice text

11 versions

Update #11 · Latest ·

Awarded Vendors: Multi Air Services Engineers (MACE). Contract Award Dollar Amount: $641,589.64. Contract Award Date: 2019-05-08.

Update #10 ·

.

Update #9 ·

Pre-Proposal Conference & Job Walk
Seattle USCH HVAC Optimization
Visit #2 (Final)


Date: Tuesday, March 19 2019


Time: 10:00am - 12:00pm


Location:
Seattle US Courthouse
700 Stewart St
Seattle, WA 98101


Attendees shall bring a valid photo I.D. in order to pass through Security.


A pre-proposal site visit will be conducted in conjunction with the pre-proposal conference. Attendance at the pre-proposal conference is mandatory for participation in the site visit. The intent of the meeting is to discuss the Solicitation, Proposal requirements and general questions related to the Request for Proposal (RFP). A tour of the facility will follow immediately after.


NOTE: Due to limited space within the occupied facility, no more than five (5) individuals per team (including the Prime Contractor and any sub-consultants) will be permitted on the tour, regardless of company affiliation. Sub-contractors must identify which firm/ team they are associated with in order to attend the site visit tour; individual sub-contractors will not be permitted on the site visit.


More than one representative from each company (as well as more than five individuals per team) may attend the initial pre-proposal conference discussion in the morning. All parties interested in attending the pre-proposal conference and/or site visit shall register not later than 3:00 p.m. on Monday, 18 March 2019, prior to the scheduled Site Visit. Parties not registered by this deadline will not be permitted to attend the pre-proposal conference/site visit tour.


To register, each Offeror shall submit, in writing via email, to the Contracting Officer (richard.risso@gsa.gov) and the Project Manager at patrick.manning@gsa.gov), a list of attendees. Information submitted shall include the following:


• Attendee Name (First, Middle, Last)
• Attendee Email
• Company Name and Designation if Prime or Sub (if Sub, indicate to which Prime)
• Company Address
• Company Phone Number
• Designation if the attendee is attending the tour of the facility


POST SITE VISIT QUESTIONS: Questions raised during the site visit shall be submitted in writing to the Contracting Officer (richard.risso@gsa.gov) and Project Manager (patrick.manning@gsa.gov) within five (5) workdays following the site visit. Offerors shall submit all other inquires in writing to the CO and the PM.


NOTE: This solicitation will remain unchanged unless it is specifically amended in writing. All amendments will be posted to fbo.gov. If an amendment is issued, an offeror will be required to acknowledge the amendment by acknowledging the amendment in their proposal response.


Interested parties must notify the Contracting Officer for further information about attendance and to confirm location, time, and date. Only those parties who have notified the Contracting Officer and provided necessary information in advance of the meeting will be allowed to attend. To request a reasonable accommodation due to a disability, contact the Contracting Officer.


Authorized Representatives


The following individuals are designated as the authorized GSA representatives under this Solicitation:


Contracting Officer


Name: Richard Risso
Address: 400 15th Street SW, Auburn, WA 98001
Telephone: (253) 508-2627
Email: richard.risso@gsa.gov


Technical Point of Contact


Name: Patrick Manning, Project Manager
Address: 400 15th Street SW, Auburn, WA 98001
Telephone: (253) 218-5286
Email: patrick.manning@gsa.gov




.

Update #8 ·

Pre-Proposal Conference & Job Walk
Seattle USCH HVAC Optimization
Visit #2 (Final)


Date: Tuesday, March 19 2019


Time: 10:00am - 12:00pm


Location:
Seattle US Courthouse
700 Stewart St
Seattle, WA 98101


Attendees shall bring a valid photo I.D. in order to pass through Security.


A pre-proposal site visit will be conducted in conjunction with the pre-proposal conference. Attendance at the pre-proposal conference is mandatory for participation in the site visit. The intent of the meeting is to discuss the Solicitation, Proposal requirements and general questions related to the Request for Proposal (RFP). A tour of the facility will follow immediately after.


NOTE: Due to limited space within the occupied facility, no more than five (5) individuals per team (including the Prime Contractor and any sub-consultants) will be permitted on the tour, regardless of company affiliation. Sub-contractors must identify which firm/ team they are associated with in order to attend the site visit tour; individual sub-contractors will not be permitted on the site visit.


More than one representative from each company (as well as more than five individuals per team) may attend the initial pre-proposal conference discussion in the morning. All parties interested in attending the pre-proposal conference and/or site visit shall register not later than 3:00 p.m. on Monday, 18 March 2019, prior to the scheduled Site Visit. Parties not registered by this deadline will not be permitted to attend the pre-proposal conference/site visit tour.


To register, each Offeror shall submit, in writing via email, to the Contracting Officer (richard.risso@gsa.gov) and the Project Manager at patrick.manning@gsa.gov), a list of attendees. Information submitted shall include the following:


• Attendee Name (First, Middle, Last)
• Attendee Email
• Company Name and Designation if Prime or Sub (if Sub, indicate to which Prime)
• Company Address
• Company Phone Number
• Designation if the attendee is attending the tour of the facility


POST SITE VISIT QUESTIONS: Questions raised during the site visit shall be submitted in writing to the Contracting Officer (richard.risso@gsa.gov) and Project Manager (patrick.manning@gsa.gov) within five (5) workdays following the site visit. Offerors shall submit all other inquires in writing to the CO and the PM.


NOTE: This solicitation will remain unchanged unless it is specifically amended in writing. All amendments will be posted to fbo.gov. If an amendment is issued, an offeror will be required to acknowledge the amendment by acknowledging the amendment in their proposal response.


Interested parties must notify the Contracting Officer for further information about attendance and to confirm location, time, and date. Only those parties who have notified the Contracting Officer and provided necessary information in advance of the meeting will be allowed to attend. To request a reasonable accommodation due to a disability, contact the Contracting Officer.


Authorized Representatives


The following individuals are designated as the authorized GSA representatives under this Solicitation:


Contracting Officer


Name: Richard Risso
Address: 400 15th Street SW, Auburn, WA 98001
Telephone: (253) 508-2627
Email: richard.risso@gsa.gov


Technical Point of Contact


Name: Patrick Manning, Project Manager
Address: 400 15th Street SW, Auburn, WA 98001
Telephone: (253) 218-5286
Email: patrick.manning@gsa.gov




.

Update #7 ·

.

Update #6 ·

HVAC Optimization Design-Build Project
Seattle US District Courthouse
TOTAL SMALL BUSINESS SET-ASIDE

This procurement will be advertised under North American Industrial Classification System (NAICS) code 238220 - Plumbing and HVAC Contractors Addition, The small business size standard for NAICS code 238220 is $15.0M in average annual receipts over the past three (3) years.


Project Summary


The purpose of this project is to reduce the energy consumption of the HVAC systems, correct design issues, and provide better space conditioning for the tenants. The US District Court and various other federal tenants occupy the Seattle USDCH. GSA is responsible for operations and maintenance of the building.


Building


The United States Courthouse in Seattle was designed in 1998, with construction completed by August 2004. It consists of a reinforced concrete foundation on drilled shaft piers with steel framing. The facility is 390-feet-high and 23 floors with each of the courtroom floors encompassing two levels and two levels of secured parking providing 120 spaces.
Tenants:


US District Court (USDC)
US Marshals Service (USMS)
Health and Human Services (HHS)
Office of Medicare Hearings & Appeals (OMHA)


Proposed Project


Plan, design, and construct a water side economizer system in the central cooling plant, along with properly sized heat exchanger, modulating chilled water and condenser water control valves, to utilize the existing condenser water system and cooling towers, and to provide cooling water to the building to satisfy the 24/7/365 cooling load, and cooling to the building when outside air conditions are suitable.


Optimize the facility's central cooling plant to include the combination of chillers, water side economizer, cooling tower, and chilled water pumping control(s) that will optimize the central cooling plant's operation and reduce energy consumption. GSA envisions the concept shall vary the chilled water and condenser water loop set-point temperatures, in concert with chiller load capacity control, and chilled water supply speed control to optimize the central cooling plant operation and lower the energy use.


Perform all work as required for this optimization project. Work shall include all required engineering calculations, project management, submittals, preparatory work, scheduling, construction, testing and balancing, commissioning, training, closeout and all other work required to fully complete the HVAC optimization at the Seattle USDCH.


Scope of Services:


The existing building automation system at the central plant and the building is currently being upgraded, under a separate contract action, to the latest version of Johnson Controls Inc. This separate BAS upgrade will be accomplished concurrently with the scope of this project, and the two projects but will be completed in concert with one another. The building's BAS upgrade contract includes the installation of new Trane AdaptiView controllers on the existing Trane chillers, new MS/TP BACnet controls for existing ancillary equipment, and programming of new and existing Sequence of Operations into the new JCI Metasys system. Contractor for this project shall coordinate with JCI through GSA to ensure compatibility and consistency across the new equipment, controls, and software installed. Bidders for this project shall provide their proposed equipment vendor preference(s) as part of their technical submittal requirements to the RFP.


This scope of work outlines the requirements of the HVAC optimization project, which shall include the implementation of the following:


1. Installation of a 250-ton flat-plate heat exchanger as water side economizer


2. Conversion of the constant flow primary pumping to variable flow


3. Implementation of the Central Plant Optimization program


Magnitude of Construction: $680,000.00


Summary of Energy Compliance


This project will be designed to conform to requirements of the Facilities Standards for the Public Buildings Service and will implement strategies to meet the Guiding Principles for High Performance and Sustainable Buildings. GSA encourages design opportunities to increase energy efficiency above the minimum performance criteria.


Project Description & Approach


GSA envisions a highly collaborative design build delivery approach for this project where the DB contractor works closely with all stakeholders to deliver a project that meets the expectations and needs of both the team members and GSA's requirements to deliver an economical and operationally efficient high performing building.


As required by law, the facility must meet federal energy goals. The project is also to include conformance to the P-100 (Facility Standards for Public Buildings) and all other applicable building codes and standards.


The DB team will be selected through a best value / tradeoff selection process. During the development period from initial concept to final design the DB team will work in close consultation with GSA, the stakeholders to ensure all of the goals are addressed and that best value practices are utilized.


GSA will be contracting separately for Commissioning Agent (CxA) services. All installed systems will be fully commissioned and functionally tested to ensure compliance with contract documents prior to being accepted by GSA.


Unique Situations/Risks


The need for continuous operation during construction, present unique challenges for the design/build teams on the project. Facility will remain fully occupied and operations during the entire project. No adverse impact on tenant mission will be acceptable.


Occupied Facility Construction


This project scope at the must occur within an occupied, fully functional facility. These functions include typical office work, but also include services for the general public. This presents several challenges that will have to be addressed by the designer and/or design/build team.


• All work in public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis.


• Work must be performed in such a way that space conditioning is maintained throughout the process. Any work in winter will need to avoid disruption of space heating; any work in summer will need to avoid disruption of space cooling


• Any work in the central plant must be completed without disruption of the heat pump and hot water loops. Space layout design and properly staged implementation will be critical elements to a successful project.


.

Update #5 ·

Pre-Proposal Conference & Job Walk
Seattle USCH HVAC Optimization

Date: Tuesday, March 5 2019


Time: 10:00am - 12:00pm


Location: Seattle US Courthouse, 700 Stewart St, Seattle, WA 98101


Attendees shall bring a valid photo I.D. in order to pass through Security.


A pre-proposal site visit will be conducted in conjunction with the pre-proposal conference. Attendance at the pre-proposal conference is mandatory for participation in the site visit. The intent of the meeting is to discuss the Solicitation, Proposal requirements and general questions related to the Request for Proposal (RFP). A tour of the facility will follow immediately after.


NOTE: Due to limited space within the occupied facility, no more than five (5) individuals per team (including the Prime Contractor and any sub-consultants) will be permitted on the tour, regardless of company affiliation. Sub-contractors must identify which firm/ team they are associated with in order to attend the site visit tour; individual sub-contractors will not be permitted on the site visit.


More than one representative from each company (as well as more than five individuals per team) may attend the initial pre-proposal conference discussion in the morning.


All parties interested in attending the pre-proposal conference and/or site visit shall register not later than 3:00 p.m. on Monday, 4 March 2019, prior to the scheduled Site Visit.


Parties not registered by this deadline will not be permitted to attend the pre-proposal conference/site visit tour.


To register, each Offeror shall submit, in writing via email, to the Contracting Officer (richard.risso@gsa.gov) and the Project Manager at (patrick.manning@gsa.gov), a list of attendees. Information submitted shall include the following:


• Attendee Name (First, Middle, Last)
• Attendee Email
• Company Name and Designation if Prime or Sub (if Sub, indicate to which Prime)
• Company Address
• Company Phone Number
• Designation if the attendee is attending the tour of the facility


POST SITE VISIT QUESTIONS: Questions raised during the site visit shall be submitted in writing to the Contracting Officer (richard.risso@gsa.gov) and Project Manager (patrick.manning@gsa.gov) within five (5) workdays following the site visit. Offerors shall submit all other inquires in writing to the CO and the PM.


NOTE: This solicitation will remain unchanged unless it is specifically amended in writing. All amendments will be posted to fbo.gov. If an amendment is issued, an offeror will be required to acknowledge the amendment by acknowledging the amendment in their proposal response.
Interested parties must notify the Contracting Officer for further information about attendance and to confirm location, time, and date. Only those parties who have notified the Contracting Officer and provided necessary information in advance of the meeting will be allowed to attend. To request a reasonable accommodation due to a disability, contact the Contracting Officer.


Authorized Representatives


The following individuals are designated as the authorized GSA representatives under this Solicitation:


Contracting Officer


Name: Richard Risso
Address: 400 15th Street SW, Auburn, WA 98001
Telephone: (253) 508-2627
Email: richard.risso@gsa.gov


Technical Point of Contact


Name: Patrick Manning, Project Manager
Address: 400 15th Street SW, Auburn, WA 98001
Telephone: (253) 218-5286
Email: patrick.manning@gsa.gov

.

Update #4 ·

Pre-Proposal Conference & Job Walk
Seattle USCH HVAC Optimization

Date: Tuesday, March 5 2019


Time: 10:00pm - 12:00pm


Location: Seattle US Courthouse, 700 Stewart St, Seattle, WA 98101


Attendees shall bring a valid photo I.D. in order to pass through Security.


A pre-proposal site visit will be conducted in conjunction with the pre-proposal conference. Attendance at the pre-proposal conference is mandatory for participation in the site visit. The intent of the meeting is to discuss the Solicitation, Proposal requirements and general questions related to the Request for Proposal (RFP). A tour of the facility will follow immediately after.


NOTE: Due to limited space within the occupied facility, no more than five (5) individuals per team (including the Prime Contractor and any sub-consultants) will be permitted on the tour, regardless of company affiliation. Sub-contractors must identify which firm/ team they are associated with in order to attend the site visit tour; individual sub-contractors will not be permitted on the site visit.


More than one representative from each company (as well as more than five individuals per team) may attend the initial pre-proposal conference discussion in the morning.


All parties interested in attending the pre-proposal conference and/or site visit shall register not later than 3:00 p.m. on Monday, 4 March 2019, prior to the scheduled Site Visit.


Parties not registered by this deadline will not be permitted to attend the pre-proposal conference/site visit tour.


To register, each Offeror shall submit, in writing via email, to the Contracting Officer (richard.risso@gsa.gov) and the Project Manager at pat.manning@gsa.gov), a list of attendees. Information submitted shall include the following:


• Attendee Name (First, Middle, Last)
• Attendee Email
• Company Name and Designation if Prime or Sub (if Sub, indicate to which Prime)
• Company Address
• Company Phone Number
• Designation if the attendee is attending the tour of the facility


POST SITE VISIT QUESTIONS: Questions raised during the site visit shall be submitted in writing to the Contracting Officer (richard.risso@gsa.gov) and Project Manager (pat.manning@gsa.gov) within five (5) workdays following the site visit. Offerors shall submit all other inquires in writing to the CO and the PM.


NOTE: This solicitation will remain unchanged unless it is specifically amended in writing. All amendments will be posted to fbo.gov. If an amendment is issued, an offeror will be required to acknowledge the amendment by acknowledging the amendment in their proposal response.
Interested parties must notify the Contracting Officer for further information about attendance and to confirm location, time, and date. Only those parties who have notified the Contracting Officer and provided necessary information in advance of the meeting will be allowed to attend. To request a reasonable accommodation due to a disability, contact the Contracting Officer.


Authorized Representatives


The following individuals are designated as the authorized GSA representatives under this Solicitation:


Contracting Officer


Name: Richard Risso
Address: 400 15th Street SW, Auburn, WA 98001
Telephone: 253) 508-2627
Email: richard.risso@gsa.gov


Technical Point of Contact


Name: Pat Manning, Project Manager
Address: 400 15th Street SW, Auburn, WA 98001
Telephone: (253) 218-5286
Email: pat.manning@gsa.gov

.

Update #3 ·

HVAC Optimization Design-Build Project
Seattle US District Courthouse
Sources Sought & Request for Qualifications

The purpose of this Sources Sought & Request for Qualifications notice is to determine availability and capability of qualified Small Businesses, Service Disabled Veteran Owned Small Businesses, Woman Owned Small Businesses, or HUBZone small businesses.


Responses to this notice will be used for informational and planning purposes only and shall not be construed as a solicitation or as an obligation or commitment by the Government. This notice is intended strictly for market research.


This procurement will be advertised under North American Industrial Classification System (NAICS) code 238220 - Plumbing and HVAC Contractors Addition, The small business size standard for NAICS code 238220 is $15.0M in average annual receipts over the past three (3) years.


Project Summary


The purpose of this project is to reduce the energy consumption of the HVAC systems, correct design issues, and provide better space conditioning for the tenants. The US District Court and various other federal tenants occupy the Seattle USDCH. GSA is responsible for operations and maintenance of the building.


Building


The United States Courthouse in Seattle was designed in 1998, with construction completed by August 2004. It consists of a reinforced concrete foundation on drilled shaft piers with steel framing. The facility is 390-feet-high and 23 floors with each of the courtroom floors encompassing two levels and two levels of secured parking providing 120 spaces.
Tenants:


US District Court (USDC)
US Marshals Service (USMS)
Health and Human Services (HHS)
Office of Medicare Hearings & Appeals (OMHA)


Proposed Project


Plan, design, and construct a water side economizer system in the central cooling plant, along with properly sized heat exchanger, modulating chilled water and condenser water control valves, to utilize the existing condenser water system and cooling towers, and to provide cooling water to the building to satisfy the 24/7/365 cooling load, and cooling to the building when outside air conditions are suitable.


Optimize the facility's central cooling plant to include the combination of chillers, water side economizer, cooling tower, and chilled water pumping control(s) that will optimize the central cooling plant's operation and reduce energy consumption. GSA envisions the concept shall vary the chilled water and condenser water loop set-point temperatures, in concert with chiller load capacity control, and chilled water supply speed control to optimize the central cooling plant operation and lower the energy use.


Perform all work as required for this optimization project. Work shall include all required engineering calculations, project management, submittals, preparatory work, scheduling, construction, testing and balancing, commissioning, training, closeout and all other work required to fully complete the HVAC optimization at the Seattle USDCH.


Scope of Services:


The existing building automation system at the central plant and the building is currently being upgraded, under a separate contract action, to the latest version of Johnson Controls Inc. This separate BAS upgrade will be accomplished concurrently with the scope of this project, and the two projects but will be completed in concert with one another. The building's BAS upgrade contract includes the installation of new Trane AdaptiView controllers on the existing Trane chillers, new MS/TP BACnet controls for existing ancillary equipment, and programming of new and existing Sequence of Operations into the new JCI Metasys system. Contractor for this project shall coordinate with JCI through GSA to ensure compatibility and consistency across the new equipment, controls, and software installed. Bidders for this project shall provide their proposed equipment vendor preference(s) as part of their technical submittal requirements to the RFP.


This scope of work outlines the requirements of the HVAC optimization project, which shall include the implementation of the following:


1. Installation of a 250-ton flat-plate heat exchanger as water side economizer


2. Conversion of the constant flow primary pumping to variable flow


3. Implementation of the Central Plant Optimization program


Magnitude of Construction: $680,000.00


Summary of Energy Compliance


This project will be designed to conform to requirements of the Facilities Standards for the Public Buildings Service and will implement strategies to meet the Guiding Principles for High Performance and Sustainable Buildings. GSA encourages design opportunities to increase energy efficiency above the minimum performance criteria.


Project Description & Approach


GSA envisions a highly collaborative design build delivery approach for this project where the DB contractor works closely with all stakeholders to deliver a project that meets the expectations and needs of both the team members and GSA's requirements to deliver an economical and operationally efficient high performing building.


As required by law, the facility must meet federal energy goals. The project is also to include conformance to the P-100 (Facility Standards for Public Buildings) and all other applicable building codes and standards.


The DB team will be selected through a best value / tradeoff selection process. During the development period from initial concept to final design the DB team will work in close consultation with GSA, the stakeholders to ensure all of the goals are addressed and that best value practices are utilized.


GSA will be contracting separately for Commissioning Agent (CxA) services. All installed systems will be fully commissioned and functionally tested to ensure compliance with contract documents prior to being accepted by GSA.


Unique Situations/Risks


The need for continuous operation during construction, present unique challenges for the design/build teams on the project. Facility will remain fully occupied and operations during the entire project. No adverse impact on tenant mission will be acceptable.


Occupied Facility Construction


This project scope at the must occur within an occupied, fully functional facility. These functions include typical office work, but also include services for the general public. This presents several challenges that will have to be addressed by the designer and/or design/build team.


• All work in public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis.


• Work must be performed in such a way that space conditioning is maintained throughout the process. Any work in winter will need to avoid disruption of space heating; any work in summer will need to avoid disruption of space cooling


• Any work in the central plant must be completed without disruption of the heat pump and hot water loops. Space layout design and properly staged implementation will be critical elements to a successful project.


Responses


Interested small business vendors in the categories listed above shall submit their capability statement electronically, limited to 10 double sided pages. The capability statement shall be in sufficient in detail to allow Government to determine the organization's related qualifications to perform the work. The statement shall include:


1) a) Company name.
b) CAGE code.
c) DUNS number.
d) Active SAM registration printout (www.sam.gov).
e) Size/number of employees.


2) A statement describing the company's interest in performing the work.


3) Organization chart to include both the design & construction team and relevant subcontractors.


4) Capabilities and experience with federal projects in design and construction of HVAC/R and controls work. Submitted references should highlight recent and relevant design-build projects in fully occupied facilities within the past five (5) years.


5) Previous occupied facilities construction experience is essential.


6) Statement of capability to bond.


7) Contact information, Point of contact name, Phone number, E-mail address and web address (if available).


Responses should be emailed not later than the date specified in this request for qualifications notice as follows: richard.risso@gsa.gov


Each response will be reviewed by the GSA Contracting Officer for the purpose of determining whether there exists a reasonable expectation of obtaining a sufficient number of offers from qualified and responsible small business concerns. All information furnished to the Government in response to this notice will be used for review purposes only.


All interested parties are required to respond to this announcement via email not later than 1:00 p.m. Pacific Time, 15 February 2019.


.

Update #2 ·

HVAC Optimization Design-Build Project
Seattle US District Courthouse
Sources Sought & Request for Qualifications

The purpose of this Sources Sought & Request for Qualifications notice is to determine availability and capability of qualified Small Businesses, Service Disabled Veteran Owned Small Businesses, Woman Owned Small Businesses, or HUBZone small businesses.


Responses to this notice will be used for informational and planning purposes only and shall not be construed as a solicitation or as an obligation or commitment by the Government. This notice is intended strictly for market research.


This procurement will be advertised under North American Industrial Classification System (NAICS) code 238220 - Plumbing and HVAC Contractors Addition, The small business size standard for NAICS code 238220 is $15.0M in average annual receipts over the past three (3) years.


Project Summary


The purpose of this project is to reduce the energy consumption of the HVAC systems, correct design issues, and provide better space conditioning for the tenants. The US District Court and various other federal tenants occupy the Seattle USDCH. GSA is responsible for operations and maintenance of the building.


Building


The United States Courthouse in Seattle was designed in 1998, with construction completed by August 2004. It consists of a reinforced concrete foundation on drilled shaft piers with steel framing. The facility is 390-feet-high and 23 floors with each of the courtroom floors encompassing two levels and two levels of secured parking providing 120 spaces.
Tenants:


US District Court (USDC)
US Marshals Service (USMS)
Health and Human Services (HHS)
Office of Medicare Hearings & Appeals (OMHA)


Proposed Project


Plan, design, and construct a water side economizer system in the central cooling plant, along with properly sized heat exchanger, modulating chilled water and condenser water control valves, to utilize the existing condenser water system and cooling towers, and to provide cooling water to the building to satisfy the 24/7/365 cooling load, and cooling to the building when outside air conditions are suitable.


Optimize the facility's central cooling plant to include the combination of chillers, water side economizer, cooling tower, and chilled water pumping control(s) that will optimize the central cooling plant's operation and reduce energy consumption. GSA envisions the concept shall vary the chilled water and condenser water loop set-point temperatures, in concert with chiller load capacity control, and chilled water supply speed control to optimize the central cooling plant operation and lower the energy use.


Perform all work as required for this optimization project. Work shall include all required engineering calculations, project management, submittals, preparatory work, scheduling, construction, testing and balancing, commissioning, training, closeout and all other work required to fully complete the HVAC optimization at the Seattle USDCH.


Magnitude of Construction: $680,000.00


Summary of Energy Compliance


This project will be designed to conform to requirements of the Facilities Standards for the Public Buildings Service and will implement strategies to meet the Guiding Principles for High Performance and Sustainable Buildings. GSA encourages design opportunities to increase energy efficiency above the minimum performance criteria.


Project Description & Approach


GSA envisions a highly collaborative design build delivery approach for this project where the DB contractor works closely with all stakeholders to deliver a project that meets the expectations and needs of both the team members and GSA's requirements to deliver an economical and operationally efficient high performing building.


As required by law, the facility must meet federal energy goals. The project is also to include conformance to the P-100 (Facility Standards for Public Buildings) and all other applicable building codes and standards.


The DB team will be selected through a best value / tradeoff selection process. During the development period from initial concept to final design the DB team will work in close consultation with GSA, the stakeholders to ensure all of the goals are addressed and that best value practices are utilized.


GSA will be contracting separately for Commissioning Agent (CxA) services. All installed systems will be fully commissioned and functionally tested to ensure compliance with contract documents prior to being accepted by GSA.


Unique Situations/Risks


The need for continuous operation during construction, present unique challenges for the design/build teams on the project. Facility will remain fully occupied and operations during the entire project. No adverse impact on tenant mission will be acceptable.


Occupied Facility Construction


This project scope at the must occur within an occupied, fully functional facility. These functions include typical office work, but also include services for the general public. This presents several challenges that will have to be addressed by the designer and/or design/build team.


• All work in public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis.


• Work must be performed in such a way that space conditioning is maintained throughout the process. Any work in winter will need to avoid disruption of space heating; any work in summer will need to avoid disruption of space cooling


• Any work in the central plant must be completed without disruption of the heat pump and hot water loops. Space layout design and properly staged implementation will be critical elements to a successful project.


Responses


Interested small business vendors in the categories listed above shall submit their capability statement electronically, limited to 10 double sided pages. The capability statement shall be in sufficient in detail to allow Government to determine the organization's related qualifications to perform the work. The statement shall include:


1) a) Company name.
b) CAGE code.
c) DUNS number.
d) Active SAM registration printout (www.sam.gov).
e) Size/number of employees.


2) A statement describing the company's interest in performing the work.


3) Organization chart to include both the design & construction team and relevant subcontractors.


4) Capabilities and experience with federal projects in design and construction of HVAC/R and controls work. Submitted references should highlight recent and relevant design-build projects in fully occupied facilities within the past five (5) years.


5) Previous occupied facilities construction experience is essential.


6) Statement of capability to bond.


7) Contact information, Point of contact name, Phone number, E-mail address and web address (if available).


Responses should be emailed not later than the date specified in this request for qualifications notice as follows: richard.risso@gsa.gov


Each response will be reviewed by the GSA Contracting Officer for the purpose of determining whether there exists a reasonable expectation of obtaining a sufficient number of offers from qualified and responsible small business concerns. All information furnished to the Government in response to this notice will be used for review purposes only.


All interested parties are required to respond to this announcement via email not later than 1:00 p.m. Pacific Time, 15 February 2019.


.

Update #1 ·

HVAC Optimization Design-Build Project
Seattle US District Courthouse
Sources Sought & Request for Qualifications

The purpose of this Sources Sought & Request for Qualifications notice is to determine availability and capability of qualified Small Businesses, Service Disabled Veteran Owned Small Businesses, Woman Owned Small Businesses, or HUBZone small businesses.


Responses to this notice will be used for informational and planning purposes only and shall not be construed as a solicitation or as an obligation or commitment by the Government. This notice is intended strictly for market research.


This procurement will be advertised under North American Industrial Classification System (NAICS) code 238220 - Plumbing and HVAC Contractors Addition, The small business size standard for NAICS code 238220 is $15.0M in average annual receipts over the past three (3) years.


Project Summary


The purpose of this project is to reduce the energy consumption of the HVAC systems, correct design issues, and provide better space conditioning for the tenants. The US District Court and various other federal tenants occupy the Seattle USDCH. GSA is responsible for operations and maintenance of the building.


Building


The United States Courthouse in Seattle was designed in 1998, with construction completed by August 2004. It consists of a reinforced concrete foundation on drilled shaft piers with steel framing. The facility is 390-feet-high and 23 floors with each of the courtroom floors encompassing two levels and two levels of secured parking providing 120 spaces.
Tenants:


US District Court (USDC)
US Marshals Service (USMS)
Health and Human Services (HHS)
Office of Medicare Hearings & Appeals (OMHA)


Proposed Project


Plan, design, and construct a water side economizer system in the central cooling plant, along with properly sized heat exchanger, modulating chilled water and condenser water control valves, to utilize the existing condenser water system and cooling towers, and to provide cooling water to the building to satisfy the 24/7/365 cooling load, and cooling to the building when outside air conditions are suitable.


Optimize the facility's central cooling plant to include the combination of chillers, water side economizer, cooling tower, and chilled water pumping control(s) that will optimize the central cooling plant's operation and reduce energy consumption. GSA envisions the concept shall vary the chilled water and condenser water loop set-point temperatures, in concert with chiller load capacity control, and chilled water supply speed control to optimize the central cooling plant operation and lower the energy use.


Perform all work as required for this optimization project. Work shall include all required engineering calculations, project management, submittals, preparatory work, scheduling, construction, testing and balancing, commissioning, training, closeout and all other work required to fully complete the HVAC optimization at the Seattle USDCH.


Summary of Energy Compliance


This project will be designed to conform to requirements of the Facilities Standards for the Public Buildings Service and will implement strategies to meet the Guiding Principles for High Performance and Sustainable Buildings. GSA encourages design opportunities to increase energy efficiency above the minimum performance criteria.


Project Description & Approach


GSA envisions a highly collaborative design build delivery approach for this project where the DB contractor works closely with all stakeholders to deliver a project that meets the expectations and needs of both the team members and GSA's requirements to deliver an economical and operationally efficient high performing building.


As required by law, the facility must meet federal energy goals. The project is also to include conformance to the P-100 (Facility Standards for Public Buildings) and all other applicable building codes and standards.


The DB team will be selected through a best value / tradeoff selection process. During the development period from initial concept to final design the DB team will work in close consultation with GSA, the stakeholders to ensure all of the goals are addressed and that best value practices are utilized.


GSA will be contracting separately for Commissioning Agent (CxA) services. All installed systems will be fully commissioned and functionally tested to ensure compliance with contract documents prior to being accepted by GSA.


Unique Situations/Risks


The need for continuous operation during construction, present unique challenges for the design/build teams on the project. Facility will remain fully occupied and operations during the entire project. No adverse impact on tenant mission will be acceptable.


Occupied Facility Construction


This project scope at the must occur within an occupied, fully functional facility. These functions include typical office work, but also include services for the general public. This presents several challenges that will have to be addressed by the designer and/or design/build team.


• All work in public spaces will need to be completed during unoccupied periods. Setup, construction, and clean-up will need to occur on a daily basis.


• Work must be performed in such a way that space conditioning is maintained throughout the process. Any work in winter will need to avoid disruption of space heating; any work in summer will need to avoid disruption of space cooling


• Any work in the central plant must be completed without disruption of the heat pump and hot water loops. Space layout design and properly staged implementation will be critical elements to a successful project.


Responses


Interested small business vendors in the categories listed above shall submit their capability statement electronically, limited to 10 double sided pages. The capability statement shall be in sufficient in detail to allow Government to determine the organization's related qualifications to perform the work. The statement shall include:


1) a) Company name.
b) CAGE code.
c) DUNS number.
d) Active SAM registration printout (www.sam.gov).
e) Size/number of employees.


2) A statement describing the company's interest in performing the work.


3) Organization chart to include both the design & construction team and relevant subcontractors.


4) Capabilities and experience with federal projects in design and construction of HVAC/R and controls work. Submitted references should highlight recent and relevant design-build projects in fully occupied facilities within the past five (5) years.


5) Previous occupied facilities construction experience is essential.


6) Statement of capability to bond.


7) Contact information, Point of contact name, Phone number, E-mail address and web address (if available).


Responses should be emailed not later than the date specified in this request for qualifications notice as follows: richard.risso@gsa.gov


Each response will be reviewed by the GSA Contracting Officer for the purpose of determining whether there exists a reasonable expectation of obtaining a sufficient number of offers from qualified and responsible small business concerns. All information furnished to the Government in response to this notice will be used for review purposes only.


All interested parties are required to respond to this announcement via email not later than 1:00 p.m. Pacific Time, 15 February 2019.

.

Attachments

Files attached to this notice, newest first
File Type Posted
SF1442-14b.pdf PDF
SF30,_Amd_01.pdf PDF
Seattle_HVAC_Optimization_RFI_Log_(1).pdf PDF
Seattle_HVAC_Optimization_Solicitation_(Rev_1)_3.18.19.docx DOCX document
Seattle_HVAC_Optimization_Agreement_(Rev_1)_3.15.19.docx DOCX document
Seattle_HVAC_Optimization_Agreement_(Rev_0)_3.14.19.docx DOCX document
Exhibit_7_Wage_Determination_WA11_(Mod_3)_3.1.19.pdf PDF
Exhibit_8_GSA_Vendor_Fitness_Determination_Training_Manual.pdf PDF
Exhibit_6_Price_&_Services_Schedule.docx DOCX document
Seattle_HVAC_Optimization_Solicitation_(Rev_0)_3.14.19.docx DOCX document
Exhibit_2_Pre-Proposal_Conference_&_Job_Walk_(Rev_2).docx DOCX document
Exhibit_9_Offerors_Representations_and_Certifications_(C301-SAT).docx DOCX document
Exhibit_0_SBU_Document.docx DOCX document
Exhibit_1_SEA_USDCH_HVAC_Optimization_SOW_(1_January_2019).doc.docx DOCX document
Seattle_USCH_HVAC_Optimization_Job_Walk_-_Attendance_List.pdf PDF
Exhibit_3_Project_Experience.docx DOCX document
Exhibit_5_GACA_-_GSA_Affiliated_Customer_Accounts_May_2014.docx DOCX document
Exhibit_2_Pre-Proposal_Conference_&_Job_Walk_(Rev_1).docx DOCX document
Exhibit_4_Performance_Evaluation_Survey_-_Commercial_Client.docx DOCX document
Exhibit_2_Pre-Proposal_Conference_&_Job_Walk_(Rev_1).docx DOCX document
Pre-Proposal_Conference_&_Job_Walk.docx DOCX document
Seattle_USDC_HVAC_Optimization_-_Request_for_Qualifications_and_Sources_Sought_(Rev_1).docx DOCX document
SEA_USDCH_HVAC_Optimization_SOW_(1_January_2019).doc.docx DOCX document
Seattle_USDC_HVAC_Optimization_-_Request_for_Qualifications_and_Sources_Sought.docx DOCX document