SD-waubay NWR-WBY O'farell WPA fence

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140FGA25Q0049
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Department of the Interior Fish and Wildlife Service is soliciting a firm fixed-price contract for the removal and replacement of approximately 9,400 feet of barbed wire fencing with wildlife-friendly 4-strand fencing at the O'Farrell Waterfowl Production Area in Grant County, South Dakota. The project involves replacing existing 3-strand barbed wire with a 42-inch high fence system using 12.5 gauge galvanized wire, steel T-posts, treated wood posts, and installation of 12-16 foot gates, all designed to minimize wildlife impact while protecting livestock and property. The contract requires strict adherence to environmental considerations including avoiding wetland disturbances, limiting machinery to designated paths, and maintaining erosion control measures. Award will be made to the lowest-priced responsible offeror following evaluation based solely on price, with the government reviewing contractor responsibility through federal databases including CPARS, SAM, and FAPIIS. Questions are due by August 12, 2025 at 2:00 PM EST, with quotations due August 21, 2025 at 2:00 PM EST.

This procurement is designated as a 100% small business set-aside under NAICS code 238990 with a small business size standard of $19.0 million, and the estimated project value ranges between $25,000 and $100,000. The work must be performed at the O'Farrell Waterfowl Production Area located in Marvin, South Dakota, within Grant County. The performance period spans 364 days beginning 10 calendar days after the Notice to Proceed is issued, with project completion required no earlier than October 1, 2025 and no later than September 30, 2026. Contractors must comply with Davis-Bacon prevailing wage requirements as outlined in the wage determination covering multiple South Dakota counties including Grant County. The project manager is Bryce Ahlers, Refuge Manager, and all work must meet OSHA and local safety regulations while producing deliverables including the completed fence installation, final walk-through, and as-built mapping showing fence alignment and gate locations.

Notice text

SD-WAUBAY NWR-WBY O'FARELL WPA FENCE

Files

File Type Posted
SOW.pdf PDF
DOL_Wage_Determination.pdf PDF
Sol_140FGA25Q0049.pdf PDF
Price_Schedule.pdf PDF
Notice_to_Offerors.pdf PDF

Notice history

Notice Type Posted
SD-waubay NWR-WBY O'farell WPA fence Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
WA-spring CRK NFH-chain link fencing NAICS 238990 — Total Small Business
Lowline Area Burned Fence Construction Project Gunnison, Colorado, United States · NAICS 238990 Forest Service Total Small Business
White Horse Hill National Game Preserve Water Main NAICS 237110 — Total Small Business
MN fergus falls WMD handrail stairs NAICS 236220 — Total Small Business
SNPLMA Kalamazoo Fence Ely, Nevada 89301, United States · NAICS 238990 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity