SD flap CS23A(1) - delta-01 access road
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF23B000020
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Wall, South Dakota, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for improvements to County Road CS-23A located in Jackson County, South Dakota. The Department of Transportation Federal Highway Administration seeks to widen and pave 0.51 miles of the gravel road and address drainage issues. The scope of work includes 1,500 cubic yards of embankment construction, 3,150 tons of aggregate base, 2,000 tons of asphalt pavement, 1,000 hours of traffic control, 0.6 miles of ditch reconditioning, and four concrete headwalls for culverts. Proposals are due by May 5, 2023.
There is no set-aside designated for this procurement. The work includes 1,500 cubic yards of dirt work, 3,150 tons of aggregate, 2,000 tons of asphalt, and four concrete culverts. The road improvements are estimated to cost between $700,000 to $2,000,000. No incumbent or current contractor is identified. As the work includes road construction and maintenance, the likely NAICS codes are 237110 and 238110, and PSC code R499 for road work.
Notice text
THIS IS NOT A REQUEST FOR BID
PLANS AND SPECIFICATIONS ARE NOT AVAILABLE
THIS IS FULL AND OPEN COMPETITION
PROJECT NUMBER: SD FLAP CS23A(1)
PROJECT NAME: DELTA-01 ACCESS ROAD
PROJECT DESCRIPTION: The Delta 01 site is located 0.6 miles north on CS-23A from exit 127 off of I-90. Delta 01 is in Jackson County, South Dakota, about 17 miles from the Town of Wall. The access road to the Delta 01 missile site is CS-23A and owned and operated by Jackson County. The project will improve access to the Delta 01 Launch Control Facility. The existing gravel roadway will be widened to match the state-owned portion of the road and paved to provide a durable driving surface. Several existing culvert issues along the route will be addressed to reduce future maintenance costs for the County.
SCOPE OF THE WORK: Proposed improvements to CS-23A include paving 0.51 miles of the county road and widening the existing travel way 17 feet wide, to 24 feet wide, providing two travel lanes 11 feet wide with new paved shoulders one foot wide. Improvements also will include installing Manual on Uniform Traffic Control Devices (MUTCD) compliant signing and striping. The proposed improvements will improve public access to the Delta 01 Launch Control Facility.
Shoulder erosion was observed along the southeastern edge of the project. Embankment will be constructed to fill the erosion area and graded to provide positive drainage to the north. A culvert failed during spring 2019, necessitating an emergency backfill of the road by Jackson County. Three new larger culverts will be placed to provide improved drainage.
The project’s assets are owned by Jackson County. The current roadway has several culverts full of sediment and have overtopped causing damage to the roadway. Placing new, appropriately sized culverts will decrease future maintenance issues. Placing asphalt concrete pavement will decrease the annual maintenance necessary to grade and re-gravel this section of CS-23A.
Recently, the National Park Service (NPS) built a paved parking lot and comfort station on the east side of CS-23A, across from the Delta 01 site.
PRINCIPAL WORK ITEMS:
- 1,500 CUYD of Embankment Construction
- 3,150 Tons of Aggregate Base
- 2,000 Tons of Asphalt Concrete Pavement, Type 1
- 1,000 hours of Temporary Traffic Control, Flagger
- 0.6 miles of Ditch Reconditioning
- 4 Concrete, Headwall for 36-Inch Pipe Culvert
The estimated price range of the project work is between $700,000 and $2,000,000.
Notice history
| Notice | Type | Posted |
|---|---|---|
| SD flap CS23A(1) - delta-01 access road | Award Notice | |
| SD flap CS23A(1) - delta-01 access road | Solicitation | |
| SD flap CS23A(1) - delta-01 access road | Pre-Solicitation | |
| SD flap CS23A(1) - delta-01 access road | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity