Sam Houston Trail Bridge Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 127EAV26R0009
- Agency
- Region 3 - Southwestern Region Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Lufkin, Texas 75904, United States
- Points of contact
-
- David Watson david.l.watson@usda.gov (480) 204-9319
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service R3-Southwestern Region seeks design and construction of 18 trail bridges on the Multi-Use Trail of Sam Houston National Forest west of New Waverly, Texas, with proposals due May 29 at 1400 CST. The procurement is a Total Small Business set-aside, and a mandatory site visit was held April 3, 2026.
Place of performance is Lufkin, Texas, with work distributed across 18 bridge locations spanning five counties. The project is structured in three phases: Phase A (Site Investigation and Analysis), Phase B (Design and Construction Document Preparation), and Phase C (removal of existing crossing infrastructure and construction of new bridges with trail approach connections). The estimated magnitude is between one million and five million dollars. Work must be completed within 390 calendar days after Notice to Proceed. Performance and payment bonds equal to 100 percent of contract price are required within 10 days of award. Davis-Bacon wage rates apply, and the contract is firm fixed-price.
Design must meet minimum 500-year storm interval standards with 30 percent debris blocking and 18 inches freeboard, incorporate deep foundations and extended spans, and comply with LRFD Guide Specifications for FRP structures. Treated lumber is required for ground contact. The Forest Service will cover natural disasters and extreme weather events exceeding contractor assumptions. Contractors must accommodate prescribed burn season (January through May) and hunting season during construction. Environmental clearances are approved within a 200-foot corridor along the trail, with bridge relocations possible within 100 feet left or right of centerline subject to regulatory agency approval.
The NAICS code is 237310, Highway, Street, and Bridge Construction. Evaluation is based on technical approach, relevant experience, key personnel qualifications, past performance, and price, with non-price factors weighted approximately equal to price. Offerors must submit technical and price proposals separately.
Notice text
3 versions
Update #3 · Latest ·
April 10, 2026
The purpose of this amendment is to:
1.Update and provide responses to questions.
2. Extend solicitation from April 17, 2026, to May 29, 2026, 1400 CST.
1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals
necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes:
1.1.1 Phase A: Site Investigation and Analysis
1.1.2 Phase B: Design and Construction Document Preparation
1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings,
and construction and connecting of trail approaches from the existing trail to the new crossings.
1.2 The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.
1. Disclosure of the Magnitude of Construction (FAR 36.204)
In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $1,000,000 and $5,000,000.
This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.
2. Site Visit
Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.
Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.
3. Period of Performance
The contractor shall complete all work required under this contract within 390 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.
The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.
4. Bonding Requirements
In accordance with FAR 52.228-15, Performance and Payment Bonds Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.
The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.
5. Differing Site Conditions
Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.
QUESTIONS ARE DUE THURSDAY, APRIL 2, 2026.
Update #2 ·
1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals
necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes:
1.1.1 Phase A: Site Investigation and Analysis
1.1.2 Phase B: Design and Construction Document Preparation
1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings,
and construction and connecting of trail approaches from the existing trail to the new crossings.
1.2 The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.
1. Disclosure of the Magnitude of Construction (FAR 36.204)
In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $1,000,000 and $5,000,000.
This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Governments independent estimate.
2. Site Visit
Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.
Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.
3. Period of Performance
The contractor shall complete all work required under this contract within 390 calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.
The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.
4. Bonding Requirements
In accordance with FAR 52.228-15, Performance and Payment Bonds Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.
The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.
5. Differing Site Conditions
Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.
QUESTIONS ARE DUE THURSDAY, APRIL 2, 2026.
Update #1 ·
1.1 This Project includes all labor, materials, equipment, supplies, travel, supervision, and incidentals
necessary for the full design and construction of (18) Trail Bridges on the MUT (Multi-Use Trail) of the Sam Houston National Forest west of New Waverly, TX. Work includes:
1.1.1 Phase A: Site Investigation and Analysis
1.1.2 Phase B: Design and Construction Document Preparation
1.1.3 Phase C: Removal and disposal of existing crossing infrastructure, construction of new crossings,
and construction and connecting of trail approaches from the existing trail to the new crossings.
1.2 The contractor may adopt a phased approach to completion of the crossings due to the number of sites as well as the varied locations and potential varied crossing types proposed.
1. Disclosure of the Magnitude of Construction (FAR 36.204)
In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the magnitude of this construction project is estimated to be between $500,000 and $1,000,000.
This magnitude range is provided solely for the purpose of assisting prospective offerors in determining their capability to perform the work. The magnitude range does not represent the Government¿s independent estimate.
2. Site Visit
Offerors are strongly encouraged to visit the project site to familiarize themselves with local conditions that may affect the performance of the work. Contractors shall be responsible for investigating and satisfying themselves as to the conditions affecting the work, including but not limited to access, terrain, weather conditions, and other conditions which may impact the cost or performance of the work.
Failure to visit the site will not relieve the contractor from responsibility for properly estimating the difficulty and cost of successfully performing the work.
3. Period of Performance
The contractor shall complete all work required under this contract within [INSERT NUMBER] calendar days after receipt of the Notice to Proceed (NTP), unless otherwise specified in the contract.
The contractor shall provide a proposed schedule within 10 calendar days after receipt of the Notice to Proceed outlining the anticipated sequence and duration of work activities.
4. Bonding Requirements
In accordance with FAR 52.228-15, Performance and Payment Bonds¿Construction, the successful offeror shall furnish performance and payment bonds in the amount of 100 percent of the contract price.
The required bonds shall be submitted to the Contracting Officer within 10 calendar days after receipt of the notice of award.
5. Differing Site Conditions
Offerors are reminded that FAR 52.236-2, Differing Site Conditions, is incorporated into this solicitation and resulting contract. Contractors shall promptly notify the Contracting Officer in writing upon encountering subsurface or latent physical conditions at the site that differ materially from those indicated in the contract or from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.
QUESTIONS ARE DUE THURSDAY, APRIL 2, 2026.
Attachments
| File | Type | Posted |
|---|---|---|
| 127EAV26R0009 Pre Bid Meeting Sign In.pdf | ||
| trails 5-5-25.pdf | ||
| Amendment 127EAV26R0009 P00002.pdf | ||
| 127EAV26R0009 Responses to Questions.pdf | ||
| 127EAV26R0009 P0001 3.26.pdf | ||
| Attachment_06_StructureSummaries.xlsx | XLSX spreadsheet | |
| Attachment_04_VicinityMaps.pdf | ||
| Attachment_03_SOI.xlsx | XLSX spreadsheet | |
| 127EAV26R0009 Sam Houston Trail Bridge Replacement 3.16.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Sam Houston Trail Bridge Replacement | Award Notice | |
| Sam Houston Trail Bridge Replacement | Solicitation | |
| Sam Houston Trail Hardening MUT, Lake Loop Section | Pre-Solicitation |