Sacramento River Erosion Contract 3
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9123826BA006
- Agency
- ENDIST Sacramento US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Sacramento River East Levee 95814
- Points of contact
-
- Julie Maxwell julie.maxwell@usace.army.mil (916) 557-7989
- Jennifer Wheelis jennifer.l.wheelis@usace.army.mil (916) 616-5987
Notice details come from SAM.gov. Updated .
About this opportunity
The Sacramento River Erosion Contract 3 is a federal construction solicitation issued by the Department of the Army Corps of Engineers Engineering District Sacramento for erosion control and restoration work along the Sacramento River. The project involves site preparation, environmental controls, demolition and removal of existing structures, and restoration activities including clearing and grubbing, installation of stone materials, topsoil placement, grass seeding, erosion control measures, in-stream wood material placement, and beaver barrier fence installation, along with optional boat dock removal services at multiple stations. The solicitation includes 13 primary line items with various unit measures (job, cubic yards, tons, acres, each, and linear feet) and six optional contract line items for boat dock demolition and disposal. Four responsive bids were received from Odin Environmental Solutions LLC, SMCI Obayashi Joint Venture LP, The Dutra Group, and Trade West Construction Inc., with bid opening occurring on March 27, 2026, following multiple amendments that extended the original January 27, 2026 deadline to accommodate revisions to specifications, payment procedures, and demolition requirements.
The contract contains no set-aside designation and is open to unrestricted competition. The four competing offerors submitted bids ranging from approximately $24.9 million (Odin Environmental Solutions) to $27.9 million (SMCI Obayashi Joint Venture), with the other two contractors bidding in between these amounts. Work is scheduled to be performed in Sacramento, California 95814, with optional contract items required to be exercised within 180 days after issuance of the Notice to Proceed if selected. All bidders submitted 20% bid security and acknowledged the nine amendments issued throughout the solicitation process, which modified specifications related to boat dock removal and disposal procedures, payment and pricing structures, and regulatory compliance requirements under the Revolutionary Federal Acquisition Regulation Overhaul. The contract work encompasses environmental protection, utility disconnection, debris removal and disposal, and compliance with federal safety standards and asbestos emission regulations as specified in the project documentation.
Notice text
12 versions
Update #12 · Latest ·
3/27/26 - OF 1419 Abstract of Offers Posted - see attachments.
Amendment 0009 - The purpose of this amendment is to change the Bid Acceptance period of 60 days to 90 days. No other changes are made or implied.
Update #11 ·
Amendment 0009 - The purpose of this amendment is to change the Bid Acceptance period of 60 days to 90 days. No other changes are made or implied.
Update #10 ·
Amendment 0008 - The purpose of this amendment is to: (1.) Extend the Bid Due Date from 06Mar2026at 1100PST to 27Mar2026 at 1100PST. (2.) Extend the Virtual Bid Opening Date from 06Mar2026 at 1400PST to 27Mar2026 at 1400PST. No other changes are made or implied.
Update #9 ·
Amendment 0007 - The purpose of this amendment is to: (1.) Extend the Bid Due Date from 24Feb2026at 1100PST to 06Mar2026 at 1100PST. (2.) Extend the Virtual Bid Opening Date from 24Feb2026 at 1400PST to 06Mar2026 at 1400PST. No other changes are made or implied.
Update #8 ·
Amendment 0006 - Purpose of this amendment is to effect the following changes resulting from the Revolutionary Federal Acquisition Regulation Overhaul and issued Executive Orders. 1. Remove the following FAR provisions and Clauses 52.204-3,52.204-8,52.204-16,52.204-17,52.204-18,52.204-23,52.204-24,52.204-25,52.204-26,52.204-27,52.204-29,52.222-21,52.222-22,52.222-25,52.222-26,52.222-38,52.223-21,52.223-22,52.225-13,52.225-20,52.225-25,52.236-1,52.236-26,52.236-27,52.240-1.2. Amend Section 00 21 00. X. SUBMITTAL INFORMATION FOR BIDDERS, (c) SF 1442, Section 00 45 00 Representations and Certifications to eliminate reference to FAR 52.204-8.3. Remove the following FAR clauses 52.211-10 and 52.211-18 and replace with Supplemental Conditions within Section 00 73 00, XIII Commencement, Prosecution, and Completion of Work and XIV Variation in Estimated Quantities.4. Amended all CLIN descriptions for line items to reference applicable Variation in Estimated Quantities condition in Section 00 73 00.No other changes are made or implied.
Update #7 ·
Amendment 0005 - The purpose of this amendment is to: 1. Extend the Bid Due Date from 10Feb2026 at 1100PST to 24Feb2026 at 1100PST. 2. Extend the Virtual Bid Opening Date from 10Feb2026 at 1400PST to 24Feb2026 at 1400PST. No other changes are made or implied.
Update #6 ·
Amendment 0004 - The purpose of this amendment is to:1. Extend the Bid Due Date from 27Jan2026 at 1100PST to 10Feb2026 at 1100PST. 2. Extend the Virtual Bid Opening Date from 27Jan2026 at 1400PST to 10Feb2026 at 1400PST. No other changes are made or implied.
Update #5 ·
Amendment 0004 - Extends bid due date from 27Jan2026 to 10Feb2026 at 1100PDT and extends the virtual bid opening from 27Jan2026 to 10Feb2026 at 1400PST. Please be advised that the official release of amendment 0004 is temporarily delayed due to unforeseen technical issues with our contract writing system. Once system issues are resolved it will be posted to PIEE and this SAM.gov posting will be updated.
Amendment 0003- 1. Provide revised Specification Section 01 22 00, "Price and Payment Procedures" to include
"and disposal" in the Payment sections for the optional CLINs. 2. Revised Optional CLIN descriptions to include "and disposal".
3. Provide new Specification Section 02 41 00, "Demolition and Removals". See PIEE module for amendment documents.
Amendment 0002 - Bid Opening Time is updated to 1400/02:00 P.M. Pacific Time. Note: Site visit documents associated with amendment 0001 SF30 were previously posted via PIEE.
Update #4 ·
Amendment 0003- 1. Provide revised Specification Section 01 22 00, "Price and Payment Procedures" to include
"and disposal" in the Payment sections for the optional CLINs. 2. Revised Optional CLIN descriptions to include "and disposal".
3. Provide new Specification Section 02 41 00, "Demolition and Removals". See PIEE module for amendment documents.
Amendment 0002 - Bid Opening Time is updated to 1400/02:00 P.M. Pacific Time. Note: Site visit documents associated with amendment 0001 SF30 were previously posted via PIEE.
Update #3 ·
Amendment 0002 - Bid Opening Time is updated to 1400/02:00 P.M. Pacific Time. Note: Site visit documents associated with amendment 0001 SF30 were previously posted via PIEE.
Update #2 ·
Site Visit Sign-In Sheet.
Update #1 ·
See Solicitation.
Attachments
| File | Type | Posted |
|---|---|---|
| OF_1419 - 4 of 4.pdf | ||
| OF_1419 - 3 of 4.pdf | ||
| OF_1419 - 2 of 4.pdf | ||
| OF_1419 - 1 of 4.pdf | ||
| 01 22 00 Price and Payment.pdf | ||
| 02 41 00 Demolition and Removal.pdf | ||
| Solicitation Amendment W9123826BA0060003 SF 30.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Sacramento River Erosion Contract 3 | Award Notice | |
| Sacramento River Erosion Contract 3 | Solicitation | |
| Sacramento River Erosion Contract 3 | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity