Sacramento dwsc maintenance dredging

Closed Solicitation Posted

This opportunity was awarded. See its 2 award notices in the notice history.

Solicitation number
W912P721B0005
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
California, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Engineering District San Francisco is soliciting bids for annual maintenance dredging of approximately 7 miles of the Sacramento River Deep Water Ship Channel to a depth of -30 feet MLLW plus 1 foot of overdepth dredging. Bids are due by June 11, 2021 at 12:00 PM PDT and will be evaluated based on price. The selected contractor will be required to remove dredged material from the channel and transport it to various specified upland disposal sites as outlined in the pricing schedule and summary of work. Questions are due by specified deadlines and must be directed to the contracting specialist listed.

There is no set-aside designation for this requirement. The primary NAICS code is 237990 and PSC code is D203. Incumbent contractors who have previously performed this work include Pacific Dredge & Construction, LLC, Ross Island Sand & Gravel Co., and The Dutra Group. The place of performance will be in California. Based on prior year bids included in the documents, the contract value is estimated to be between $6-8 million. The selected contractor must complete all dredging and disposal work by the specified deadline.

Notice text

5 versions

Update #5 · Latest ·

OF 1419 BID ABSTRACT POSTED

Post RFIs and Answers- 2 June 2021, with two Information Only attachments for material placement

_______________________________________________

Bid due date is 11 June 2021 at 12pm PDT

The bid opening will be conducted via Webex. Please visit the following webex at 1 hour after bid due date/time:  https://usace1.webex.com/meet/mary.fronck

The work includes annual maintenance dredging of the Sacramento River DWSC to -30-ft (MLLW) plus 1-ft of paid over-depth and transporting of the dredged material to various upland disposal sites per the requirements in specification Section 01 11 00 SUMMARY OF WORK and Section 00 10 00 PRICING SCHEDULE.

This requirement is full and open competition. This Invitation for Bid (IFB) will result in the award of a single Firm Fixed Price (FFP) contract.

All questions should be directed to the Contracting Specialist, James Neal, at (415) 503-6891,  e-mail: james.neal@usace.army.mil.

BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROC

Update #4 ·

Post RFIs and Answers- 2 June 2021, with two Information Only attachments for material placement

_______________________________________________

Bid due date is 11 June 2021 at 12pm PDT

The bid opening will be conducted via Webex. Please visit the following webex at 1 hour after bid due date/time:  https://usace1.webex.com/meet/mary.fronck

The work includes annual maintenance dredging of the Sacramento River DWSC to -30-ft (MLLW) plus 1-ft of paid over-depth and transporting of the dredged material to various upland disposal sites per the requirements in specification Section 01 11 00 SUMMARY OF WORK and Section 00 10 00 PRICING SCHEDULE.

This requirement is full and open competition. This Invitation for Bid (IFB) will result in the award of a single Firm Fixed Price (FFP) contract.

All questions should be directed to the Contracting Specialist, James Neal, at (415) 503-6891,  e-mail: james.neal@usace.army.mil.

BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROC

Update #3 ·

Post RFI Q&A (Attachment - RFI Update #1)

_______________________________________________

Bid due date is 11 June 2021 at 12pm PDT

The bid opening will be conducted via Webex. Please visit the following webex at 1 hour after bid due date/time:  https://usace1.webex.com/meet/mary.fronck

The work includes annual maintenance dredging of the Sacramento River DWSC to -30-ft (MLLW) plus 1-ft of paid over-depth and transporting of the dredged material to various upland disposal sites per the requirements in specification Section 01 11 00 SUMMARY OF WORK and Section 00 10 00 PRICING SCHEDULE.

This requirement is full and open competition. This Invitation for Bid (IFB) will result in the award of a single Firm Fixed Price (FFP) contract.

All questions should be directed to the Contracting Specialist, James Neal, at (415) 503-6891,  e-mail: james.neal@usace.army.mil.

BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROC

Update #2 ·

AMENDMENT 1- Post RFI Q&A (Attachment -Amendment 1 RFI)

Bid due date is 11 June 2021 at 12pm PDT

The bid opening will be conducted via Webex. Please visit the following webex at 1 hour after bid due date/time:  https://usace1.webex.com/meet/mary.fronck

The work includes annual maintenance dredging of the Sacramento River DWSC to -30-ft (MLLW) plus 1-ft of paid over-depth and transporting of the dredged material to various upland disposal sites per the requirements in specification Section 01 11 00 SUMMARY OF WORK and Section 00 10 00 PRICING SCHEDULE.

This requirement is full and open competition. This Invitation for Bid (IFB) will result in the award of a single Firm Fixed Price (FFP) contract.

All questions should be directed to the Contracting Specialist, James Neal, at (415) 503-6891,  e-mail: james.neal@usace.army.mil.

BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROC

Update #1 ·

Bid due date is 11 June 2021 at 12pm PDT

The bid opening will be conducted via Webex. Please visit the following webex at 1 hour after bid due date/time:  https://usace1.webex.com/meet/mary.fronck

The work includes annual maintenance dredging of the Sacramento River DWSC to -30-ft (MLLW) plus 1-ft of paid over-depth and transporting of the dredged material to various upland disposal sites per the requirements in specification Section 01 11 00 SUMMARY OF WORK and Section 00 10 00 PRICING SCHEDULE.

This requirement is full and open competition. This Invitation for Bid (IFB) will result in the award of a single Firm Fixed Price (FFP) contract.

All questions should be directed to the Contracting Specialist, James Neal, at (415) 503-6891,  e-mail: james.neal@usace.army.mil.

BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELED OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROC

Files

File Type Posted
OF 1419 W912P721B0005.pdf PDF
S31_placement-site.pdf PDF
Sacramento RFI and Answers.pdf PDF
Placement Site Additional Detail.pdf PDF
Update for RFI 25May.pdf PDF
Amendment 1 RFI.pdf PDF
W912P721B0005_Sacramento DWSC.pdf PDF
W912P721B0005-SacramentoDWSCFY21_Plans.pdf PDF
Sacramento DWSC FY21 Specs.pdf PDF

Notice history

Notice Type Posted
Sacramento dwsc maintenance dredging Latest Award Notice
Sacramento dwsc maintenance dredging Award Notice
This notice Latest solicitation Solicitation
Sacramento dwsc maintenance dredging Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity