Update for RFI 25May.pdf

PDF 101 KB Posted

Attached to
SACRAMENTO DWSC MAINTENANCE DREDGING
Solicitation number
W912P721B0005
Issued by

About this file

This document contains a request for information amendment and related federal contract opportunity. The request for information amendment provides answers to questions about cells for dredged material placement along the S-31 site of the Sacramento River Deep Water Ship Channel. Contractors may use any cells with sufficient capacity and intact berms, preferring those closest to dredging locations. Water can be decanted from cells by gravity.

The related federal contract opportunity is a solicitation to perform annual maintenance dredging of the Sacramento River Deep Water Ship Channel to a depth of 30 feet plus one foot of overdepth. Dredged material will be transported to various upland disposal sites per the requirements outlined. The bid due date is June 11, 2021 at 12pm PDT and bids will be opened via Webex. The single firm fixed price contract resulting from this full and open competition will be awarded by the Department of the Army Corps of Engineers Engineering District San Francisco.

View the file

Other files

File Type Posted
OF 1419 W912P721B0005.pdf PDF
Sacramento RFI and Answers.pdf PDF
Placement Site Additional Detail.pdf PDF
S31_placement-site.pdf PDF
Amendment 1 RFI.pdf PDF
Sacramento DWSC FY21 Specs.pdf PDF
W912P721B0005-SacramentoDWSCFY21_Plans.pdf PDF
W912P721B0005_Sacramento DWSC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information

Amendment 1- Questions and Answers 25 May 2021

Question: Where are the Landing points for reach 8 & 9?

• The table on page 321 (PDF counter) in the Attachments to Section 01 57 19 to the Technical

Specifications indicate the station landing as “Variable” and “Landing Point Will Move Along Site” for S-

31 class I.

• Attachment 8-c included at the end of the Technical Specifications indicate the Landing Site area between approximate mile marker 33.5 through 40.5 for S-31.

• The provided plans do not indicate a landing point for reach 8 or 9.

Answer: There are numerous cells along the S-31 site. The contractor may utilize any of the cells provided that there is sufficient capacity and the berms are in good shape. The preference is that the cells closest to the dredging location are utilized first.

Question: Can water be decanted by gravity for reach 7, 8 & 9?

Answer: Yes. Water can be decanted by gravity for cells on S-31