Rubber Removal and Paint Striping

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
FA441821R0008
Agency
Air Mobility Command Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Z1BD Maintenance Of Airport Runways And Taxiways
Place of performance
Charleston AFB, South Carolina 29404, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

The purpose of this amendment is to:
1. Remove Attch 1 Statement of Work SOW Rubber Removal and Paint Striping dated 09 Feb 2021 and replace with Attch 1 dated 09 Aug 2021.
2. Remove Attch 2c UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements dated 05/16 and replace with Attch 2c dated 08/21.
3. Remove Attch 6 Schedule B - Price Schedule dated 02/12/2021 and replace with Attch 6 dated 08/09/2021.
4. Incorporate Sign-in Sheet from PreProposal Conference and Site Visit held on 29 July 2021.
5. Incorporate copy of Questions and Answered dated 09 Aug 2021.

-----------------------------------------------------------------------------------------------------

The scope of this project consists of furnishing all labor, equipment, materials, transportation, supervision and testing to accomplish rubber removal and paint striping on all runways, taxiways, and associated pavements. Work to be performed shall include, but not be limited to: rubber removal by water-blasting, shot-blasting, sandblasting or chemical means, removal of painted markings, removal of joint sealant materials, re-facing of joint sealant reservoirs, application of airfield painted markings, application of self-leveling silicone, tooled silicone & preformed neoprene joint sealants, and incidental related work.  Specific requirements for each job will be identified in individual delivery orders as issued by the government.

During the contract period, Base Civil Engineers will identify construction task orders and the Contracting Officer will negotiate and issue task orders.  The performance time for each delivery order will be negotiated prior to award of each delivery order. 

The Government intends to award a contract without discussions with respective offerors. The Government, however, reserves the right to conduct discussions if deemed in its best interest.

Update #2 ·

The purpose of this amendment is to:
1. Remove Attch 1 Statement of Work SOW Rubber Removal and Paint Striping dated 09 Feb 2021 and replace with Attch 1 dated 09 Aug 2021.
2. Remove Attch 2c UFGS 32 01 11.51 Rubber and Paint Removal From Airfield Pavements dated 05/16 and replace with Attch 2c dated 08/21.
3. Remove Attch 6 Schedule B - Price Schedule dated 02/12/2021 and replace with Attch 6 dated 08/09/2021.
4. Incorporate Sign-in Sheet from PreProposal Conference and Site Visit held on 29 July 2021.
5. Incorporate copy of Questions and Answered dated 09 Aug 2021.

--------------------------------------------------------------------------------------------------------

The scope of this project consists of furnishing all labor, equipment, materials, transportation, supervision and testing to accomplish rubber removal and paint striping on all runways, taxiways, and associated pavements. Work to be performed shall include, but not be limited to: rubber removal by water-blasting, shot-blasting, sandblasting or chemical means, removal of painted markings, removal of joint sealant materials, re-facing of joint sealant reservoirs, application of airfield painted markings, application of self-leveling silicone, tooled silicone & preformed neoprene joint sealants, and incidental related work.  Specific requirements for each job will be identified in individual delivery orders as issued by the government.

During the contract period, Base Civil Engineers will identify construction task orders and the Contracting Officer will negotiate and issue task orders.  The performance time for each task order will be negotiated prior to award of each task order. 

The Government intends to award a contract without discussions with respective offerors. The Government, however, reserves the right to conduct discussions if deemed in its best interest.

Update #1 ·

The scope of this project consists of furnishing all labor, equipment, materials, transportation, supervision and testing to accomplish rubber removal and paint striping on all runways, taxiways, and associated pavements. Work to be performed shall include, but not be limited to: rubber removal by water-blasting, shot-blasting, sandblasting or chemical means, removal of painted markings, removal of joint sealant materials, re-facing of joint sealant reservoirs, application of airfield painted markings, application of self-leveling silicone, tooled silicone & preformed neoprene joint sealants, and incidental related work.  Specific requirements for each job will be identified in individual delivery orders as issued by the government.

During the contract period, Base Civil Engineers will identify construction task orders and the Contracting Officer will negotiate and issue task orders.  The performance time for each delivery order will be negotiated prior to award of each delivery order. 

The Government intends to award a contract without discussions with respective offerors. The Government, however, reserves the right to conduct discussions if deemed in its best interest.

Attachments

Files attached to this notice, newest first
File Type Posted
FA441821R0008 - PPQ - Rubber Removal.pdf PDF
20210809 Revised Schedule B Price Schedule.pdf PDF
Attch 2c UFGS 32 01 11.51 Runway Rubber Removal - Rev 20210809.pdf PDF
20210809 SOW - Statement of Work.pdf PDF
Sign in Sheet.pdf PDF
Solicitation Amendment FA441821R00080001 SF 30.pdf PDF
Q and A FA441821R0008 Rubber Removal and Paint Striping.pdf PDF
Attch 3 Wage Determination SC20210034 dated 01.01.2021.pdf PDF
Solicitation - FA441821R0008 7.19.21.pdf PDF
Attch 2a UFC_3_260_04_2018 Airfield Markings.pdf PDF
Attch 2g JBCGS 01 57 19.00 31 Temporary Environmental Controls.pdf PDF
Attch 2h JBCGS 01 57 20.00 31 Environmental Protection.pdf PDF
Attch 6 Schedule B - Price Schedule.pdf PDF
Attch 2b TSPWG_M_3-270-01_04-10 Rubber Removal.pdf PDF
Attch 5 Green Procurement.pdf PDF
Attch 1 Statement of Work SOW Rubber Removal and Paint Striping.pdf PDF
Attch 2c UFGS 32 01 11.51 Runway Rubber Removal.pdf PDF
Attch 2d 32 17 23 Pavement Markings.pdf PDF
Attch 2e UFGS 32 01 19.61 Sealing of Joints in Rigid Pavement.pdf PDF
Attch 2f JBCGS 01 54 00.00 31 Green Procurement.pdf PDF
Attch 2i JBCGS 01 74 19.00 31 Construction and Demolition Waste Mgt.pdf PDF
Attch 4 Wage Determination SC20210040 dated 01.01.2021.pdf PDF
Show all 22

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Rubber Removal and Paint Striping Award Award Notice
Rubber Removal and Paint Striping This notice · Latest solicitation Solicitation
Rubber Removal and Paint Striping Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity