About this opportunity
The General Services Administration is seeking a contractor to replace multiple Radiation Portal Monitors at three land ports of entry in Sweet Grass, Montana, Pembina, North Dakota, and Portal, North Dakota on behalf of Customs and Border Protection's Counter Weapons of Mass Destruction branch. The contractor will provide all labor, materials, equipment, supervision, and management to remove existing RPMs and install replacement units provided by CBP, reusing applicable existing infrastructure to reduce costs. Proposals will be evaluated based on technical acceptability, past performance, and price, with award being made to the responsible offeror with the lowest price technically acceptable offer. The deadline for questions is September 30th and proposals are due by October 11th.
The opportunity is set aside for total small business concerns under NAICS code 237990. The primary PSC code is R499. Approximately 15 RPMs will be replaced under an expected budget of $3-5 million. The period of performance is 80 calendar days from notice to proceed, with substantial completion required within 60 days and closeout within 20 additional days. Work will take place at the land ports of entry in Sweet Grass, Montana, Pembina, North Dakota, and Portal, North Dakota.
Notice text
3 versions
Update #3 · Latest ·
UPDATE 05 OCTOBER 2022: The following attachments have been added to the posting:
-47PA0322R0021-0002 Generated PDF with TOC
-Solicitation Amendment 47PA0322R0021_0002
-WD ND20220046 (29 Sept)
-WD ND20220047 (29 Sept)
-CWMD RPM Install West Sites RFIs Final
The purpose of this amendment is to incorporate Requests for Information (RFIs) and their responses as well as updated
Wage Determinations into the solicitation. The due date and time is not extended.
UPDATE 08 SEPTEMBER 2022: The following documents have been added to the posting:
-A solicitation amendment (SF30) which provides information on organized site visits for each location.
-Available answers to current RFIs
The proposal deadline has been extended to 11 October 2022 at 4:30 PM Central Time.
ORINGAL POSTING
The General Services Administration (GSA) has been tasked in supporting the Customs and Border Protection (CBP) Counter Weapons of Mass Destruction (CWMD) branch for construction services, management and oversight for replacing multiple RPM at multiple Land Ports of Entry (LPOE). The contractor shall provide all supervision, labor, material and equipment necessary to perform the RPM replacements. Unique and technically compatible equipment, such as the RPM replacement, will be provided by
CWMD – coordination for reception with the Contractor is key. All supporting infrastructure associated with RPM replacement shall be included to make newly installed RPMs fully operational. Supporting infrastructure can include: Communications Control Box
(CCB) with network switch and fiber patch panel, Control Box (CB), Battery Box (BB), Camera Box, Analysis Computer Station (ACS), Reutilize existing power supply, install supporting Visual Identification System Cameras, Field Point Gateway Server in
applicable LAN rooms, annunciators in applicable booths, install applicable monitor computers in appropriate buildings, and installation of new fiber as required. The contractor shall reuse applicable and carryover infrastructure as much as possible to
reduce overall installation costs to provide best value for the government. Coordination with local port authorities to maintain
operations and minimize construction impact to commercial traffic flow.
Update #2 ·
UPDATE 08 SEPTEMBER 2022: The following documents have been added to the posting:
-A solicitation amendment (SF30) which provides information on organized site visits for each location.
-Available answers to current RFIs
The proposal deadline has been extended to 11 October 2022 at 4:30 PM Central Time.
ORINGAL POSTING
The General Services Administration (GSA) has been tasked in supporting the Customs and Border Protection (CBP) Counter Weapons of Mass Destruction (CWMD) branch for construction services, management and oversight for replacing multiple RPM at multiple Land Ports of Entry (LPOE). The contractor shall provide all supervision, labor, material and equipment necessary to perform the RPM replacements. Unique and technically compatible equipment, such as the RPM replacement, will be provided by
CWMD – coordination for reception with the Contractor is key. All supporting infrastructure associated with RPM replacement shall be included to make newly installed RPMs fully operational. Supporting infrastructure can include: Communications Control Box
(CCB) with network switch and fiber patch panel, Control Box (CB), Battery Box (BB), Camera Box, Analysis Computer Station (ACS), Reutilize existing power supply, install supporting Visual Identification System Cameras, Field Point Gateway Server in
applicable LAN rooms, annunciators in applicable booths, install applicable monitor computers in appropriate buildings, and installation of new fiber as required. The contractor shall reuse applicable and carryover infrastructure as much as possible to
reduce overall installation costs to provide best value for the government. Coordination with local port authorities to maintain
operations and minimize construction impact to commercial traffic flow.
Update #1 ·
The General Services Administration (GSA) has been tasked in supporting the Customs and Border Protection (CBP) Counter Weapons of Mass Destruction (CWMD) branch for construction services, management and oversight for replacing multiple RPM at multiple Land Ports of Entry (LPOE). The contractor shall provide all supervision, labor, material and equipment necessary to perform the RPM replacements. Unique and technically compatible equipment, such as the RPM replacement, will be provided by
CWMD – coordination for reception with the Contractor is key. All supporting infrastructure associated with RPM replacement shall be included to make newly installed RPMs fully operational. Supporting infrastructure can include: Communications Control Box
(CCB) with network switch and fiber patch panel, Control Box (CB), Battery Box (BB), Camera Box, Analysis Computer Station (ACS), Reutilize existing power supply, install supporting Visual Identification System Cameras, Field Point Gateway Server in
applicable LAN rooms, annunciators in applicable booths, install applicable monitor computers in appropriate buildings, and installation of new fiber as required. The contractor shall reuse applicable and carryover infrastructure as much as possible to
reduce overall installation costs to provide best value for the government. Coordination with local port authorities to maintain
operations and minimize construction impact to commercial traffic flow.