Root Cause Analysis - Transformer Failure (Arnold AFB)
Closed Solicitation Posted
- Solicitation number
- FA910123RB015
- Agency
- Air Force Test Center Air Force Materiel Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541330 Engineering Services
- Place of performance
- Arnold AFB, Tennessee, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a root cause analysis report for a failed 161-kV, 192.258 MVA transformer at Arnold Air Force Base. The Department of the Air Force Materiel Command Test Center requires the selected contractor to perform four main tasks: develop a fault data report, conduct a preliminary on-site inspection and testing, perform an internal inspection of the transformer, and deliver a comprehensive inspection, analysis and report. Proposals will be evaluated based on a comparative analysis of past performance, which is more important than price. Proposals are due by March 9, 2023.
There is no set-aside designation. The NAICS code is 541330 and PSC code R425. The period of performance for the root cause analysis is from March 10, 2023 to May 10, 2023. The solicitation does not name any incumbents or budget information. The place of performance is Arnold Air Force Base in Tennessee and the analysis must determine why the 161-kV, 192.258 MVA Tamini transformer with serial number 66826 failed after only 5 years of operation out of its 25-year design life.
Notice text
2 versions
Update #2 · Latest ·
The purpose of this amendment is to add Q&As as of 9 Mar 23, and to provide the amended RFP Attachment 3 - Pricing Worksheet.
This solicitation is prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This solicitation is not authorization to begin performance, and in no way obligates the Government for any costs incurred by the offeror associated with developing a proposal. The Government reserves the right not to award a contract in response to this RFP. Prior to commencement of any activities associated with performance of this requirement, the Government will issue a written directive or contractual document signed by the Contracting Officer with appropriate consideration established.
The purpose of this solicitation is for the Government to obtain a Root Cause Analysis report that details the root cause for failure of a 161- kV, 192.258 MVA for 5 minutes, Brand-name Tamini transformer, (with 33- position on-load tap changer) Serial Number 66826, in accordance with Attachment 1 – Statement of Work (SOW). There are four tasks associated with the required service: 1. Develop and deliver a Fault Data Report; 2. Develop and deliver a Preliminary On-site Inspection and Testing Report; 3. Conduct an Internal Inspection; and 4. Develop and deliver an Inspection, Analysis and Comprehensive Report. The anticipated Period of Performance (PoP) is 10 March 2023 – 10 May 2023.
Update #1 ·
this solicitation is prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This solicitation is not authorization to begin performance, and in no way obligates the Government for any costs incurred by the offeror associated with developing a proposal. The Government reserves the right not to award a contract in response to this RFP. Prior to commencement of any activities associated with performance of this requirement, the Government will issue a written directive or contractual document signed by the Contracting Officer with appropriate consideration established.
The purpose of this solicitation is for the Government to obtain a Root Cause Analysis report that details the root cause for failure of a 161- kV, 192.258 MVA for 5 minutes, Brand-name Tamini transformer, (with 33- position on-load tap changer) Serial Number 66826, in accordance with Attachment 1 – Statement of Work (SOW). There are four tasks associated with the required service: 1. Develop and deliver a Fault Data Report; 2. Develop and deliver a Preliminary On-site Inspection and Testing Report; 3. Conduct an Internal Inspection; and 4. Develop and deliver an Inspection, Analysis and Comprehensive Report. The anticipated Period of Performance (PoP) is 10 March 2023 – 10 May 2023.
Attachments
| File | Type | Posted |
|---|---|---|
| Questions and Answers as of 9 Mar 23.pdf | ||
| RFP Attachment 3 - Pricing Worksheet_Amendment 01.xlsx | XLSX spreadsheet | |
| RFP FA910123RB015.pdf | ||
| RFP Attachment 7 - Offeror Certifications.docx | DOCX document | |
| RFP Attachment 1 - Statement of Work.pdf | ||
| RFP Attachment 5 - DRAFT CDRLs.pdf | ||
| RFP Attachment 2 - Project Schedule Worksheet.xlsx | XLSX spreadsheet | |
| RFP Attachment 3 - Pricing Worksheet.xlsx | XLSX spreadsheet | |
| RFP Attachment 4 - Provisions and Clauses.pdf | ||
| RFP Attachment 6 - Demonstrated Past Performance.docx | DOCX document | |
| SOW Appendices A through G.pdf |
Show all 11
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity