Tule River Phase I

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W91238-20-S-2243
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Porterville, California 93257, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks capability statements from contractors to relocate an existing road located at Success Dam/Reservoir for the Department of the Army Corps of Engineers, Sacramento District. The road relocation project scope involves constructing a new road along the right abutment cut above the new gross pool, including work on the abutment spillway cut and temporary stockpiles. Responses are requested by December 26, 2019 and must include the offeror's experience, socioeconomic type, and bonding capability. The estimated value for the construction is between $10 million to $25 million, with a 12-month period of performance upon notice to proceed in February 2020.

There is no set-aside designated for this procurement. The NAICS code is 237310 for highway, street and bridge construction, with a size standard of $39.5 million. The federal supply class is Y1LB for construction of highways, roads, streets, bridges, and railways. This sources sought notice is being issued to determine contractor capabilities and an appropriate acquisition strategy, including whether the action should be set aside for small businesses.

Notice text

This Sources Sought Notice is for Market Research ONLY, to determine the availability, capability and interest of small business firms for a potential small business category type set-aside. 

NO AWARD will be made from this Sources Sought Notice. 

NO SOLICITATION, SPECIFICATIONS, OR DRAWINGS ARE AVAILABLE AT THIS TIME as this is solely for Market Research; therefore, please do not request such documentation.  Requests for any of this information will go unanswered. 

If the conditions at FAR 19.502(b)(2) are met the contracting officer shall set aside the acquisition for small business concerns. If set-aside, FAR 52.219-14, requires that for general construction the small business contractor will self-perform at least 15% of the cost of the contract, not including the cost of materials. Accordingly, interested contractors having the skill, capabilities, workload capacity and ability to obtain bonding necessary to complete the described project (either through self-performance and/or the managing of subcontractors) are invited to provide their capability statements to the point of contact listed below.  All responses will be used to determine the appropriate acquisition strategy for a potential acquisition. 

The purpose of this notice is to obtain a snapshot of current market capabilities and gain knowledge of potential small business sources to include small business in the following socioeconomic categories: Certified HUB Zone; Woman-Owned Small Business (WOSB) and Serviced-Disabled Veteran-Owned Small Business (SDVOSB); Veteran Owned Small Business (VOSB) and 8(a) small business concerns to perform:

Road relocation of an existing road, located at Success Dam/Reservoir (now Schafer Dam).   

Contractors’ capabilities will be reviewed solely for the purpose of determining an appropriate acquisition strategy to include whether this prospective action is appropriate to be set-aside for the small business community or should proceed as an unrestricted full and open acquisition.   Other than small businesses may respond to this NOTICE to provide a greater context of current market capabilities. However, per the Federal Acquisition Regulations, preference will be given to the small business categories as listed above. The Government must ensure there is adequate competition among the potential pool of available contractors.

The Government estimates issuing a solicitation in February of 2020.

The Government intends to award a Firm-Fixed Price contract with an estimated 12-month period of performance from issuance of the Notice to Proceed (NTP).

In accordance with DFARS 236.204(i), the estimated magnitude of construction is expected to be between $10M - $25M.

The NAICS Code is 237310 (Highway, Street and Bridge Construction), the size standard is $39.5M, and the Federal Supply Code is Y1LB (Construction of Highways, Roads, Streets, Bridges, and Railways).

GENERAL SCOPE:

This requirement is for the relocation of an existing road located at Success Dam/Reservoir (now Schafer Dam).  This road is used for public access to the Rock Hill Recreation site, when the reservoir is not at full capacity.  The road is currently in the middle of the Tule River Spillway.  The new road will be along the right abutment cut above the new gross pool.  This project will include: the right abutment spillway cut, road relocation and temporary stockpiles of materials. 

CAPABILITY STATEMENT

The following requests are designed to inform the US Army Corps of Engineers, Sacramento District, of current construction contractor market capabilities. Please provide your response to the following.  The submission is limited to 10 pages.

1) Offeror's name, DUNS#, address, point of contact, phone number, and e-mail address.

2) Offeror's experience and capability to complete (either through self-performance in excess of 15% or the managing of one or more subcontracts as a Prime) contracts of this magnitude and complexity and comparable work performed within the past 6 years. Describe the Prime’s self-performed effort, brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project - provide at least 3 examples.

3) Offeror's socioeconomic type and business size (Certified HUB Zone; Woman-Owned Small Business (WOSB) and Serviced-Disabled Veteran-Owned Small Business (SDVOSB); Veteran Owned Small Business (VOSB) and 8(a) small business concerns).

4) Offeror's Bonding Capability in the form of a letter from Surety.

The Capabilities Statement will not be considered an offer (proposal) or a bid for any future Request for Proposal or Invitation for Bid that may result from this notice. Moreover, it will not restrict the Government to an ultimate acquisition approach. 

This notice is for information and planning purposes only.  The respondents will not be notified of the results of any review conducted of the capability statements received.

Please notify this office in writing via email by 3:00 PM Pacific Time, 26 December, 2019. Submit response and information through email to: john.wysocki@usace.army.mil

Please include the Sources Sought No. W9123820S2243  in the subject line.

Note that responses submitted after the date above may not be considered when the Government is determining its acquisition strategy to fulfill the requirement described herein.

Files

File Type Posted
Tule River Phase 1 Maps.pdf PDF

Notice history

Notice Type Posted
Tule River Phase I Award Award Notice
Tule River Phase I Latest solicitation Solicitation
Tule River Phase I Pre-Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
USACE SPK DBB Construction - Sacramento River East Levee Contract 5 (SREL C5), Sacramento, California California 95691, United States · NAICS 562910 ENDIST Sacramento Total Small Business
Mill Creek Section 205 Flood Risk Management Improvements Mill Creek Flood Control ChannelWalla Walla, WA 99362Walla Walla County 99362 · NAICS 237990 ENDIST Walla Walla No set-aside
USACE SPK DBB Construction - Calaveras Wastewater Treatment Plant Improvements - Copperopolis, CA Copperopolis, California, United States · NAICS 237110 ENDIST Sacramento No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors