Tule River Phase 1 Maps.pdf
PDF 7 MB Posted
- Attached to
- Tule River Phase I
- Solicitation number
- W91238-20-S-2243
About this file
This sources sought notice is seeking capability statements from contractors for a road relocation project located at Success Dam/Reservoir. The Department of the Army Corps of Engineers, Sacramento District is estimating issuing a solicitation in February 2020 for a firm-fixed price contract with a 12-month period of performance upon notice to proceed. The project scope involves relocating an existing road along the right abutment cut above the new gross pool, including the abutment spillway cut, road relocation, and temporary stockpiles. The estimated magnitude of construction is between $10 million to $25 million. Responses are requested by December 26, 2019 to include the offeror's experience, socioeconomic type, and bonding capability. The NAICS code is 237310 and the size standard is $39.5 million. This notice is to determine contractor capabilities and an appropriate acquisition strategy, including whether the action should be set aside for small businesses.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Figure 1. Success Lake and Vicinity with Haul Roads and Blast Radii.
Figure 2. Proposed Temporary Stock Piles and Project Area.
Figure 3. Road alignment proposed for a bench along the right abutment of the spillway.