Tule River Phase I
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W91238-20-B-0004
- Agency
- ENDIST Sacramento US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Porterville, California 93257, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for a road realignment project at Success Dam and Reservoir in Tulare County, California. The Department of the Army Corps of Engineers Engineering District Sacramento will relocate an existing road along the right abutment cut above the reservoir's new gross pool. The scope of work includes right abutment spillway cut work and temporary stockpiles. The solicitation will proceed as a 100% total small business set-aside and is estimated to issue on March 2, 2020 via beta.SAM.gov with bids due on April 1, 2020. The procurement will be conducted using NAICS code 237310 for highway, street and bridge construction with a size standard of $39.5 million.
The contract is designated as a total small business set-aside with an anticipated value between $25-100 million. The primary NAICS code is 237310 for highway, street and bridge construction and the PSC code is Y1LB for construction of highways, roads, streets, bridges, and railways. No incumbent or current contractors were identified. The project includes relocating an existing road, right abutment spillway cut work, and temporary stockpiles of materials. Interested vendors should monitor beta.SAM.gov for any changes to the pre-solicitation notice or interested vendors list.
Notice text
2 versions
Update #2 · Latest ·
TITLE OF PROJECT: Tule River Phase 1 (Road Realignment Project)
(Reference Sources Sought No.: W9123820S2243)
The Government anticipates issuing an Invitation for Bids (IFB) with the intent of awarding a single Firm-Fixed Price construction contract for the Tule River Road Realignment Project.
Project Description: This requirement is for the road relocation of an existing road, located at Success Dam and Reservoir (now Schafer Dam) in Tulare County, California. This road is used for public access to the Rock Hill Recreation site, when the reservoir is not at full capacity. The road is currently in the middle of the Tule River Spillway. The new road will be along the right abutment cut above the new gross pool. This project will include: the right abutment spillway cut, road relocation and temporary stockpiles of materials.
In accordance with DFARS 236.204(ii), the estimated magnitude of construction is expected to be between $25M - $100M. This prospective contract action will be conducted using the NAICS Code 237310 (Highway, Street and Bridge Construction) with a size standard of $39.5M, and the Federal Supply Code is Y1LB (Construction of Highways, Roads, Streets, Bridges, and Railways).
The solicitation will proceed as a 100% total small business set-aside and is estimated to be issued on or about 02 March 2020 with bids due tentatively on 01 April 2020. The IFB will be issued on the Government Point of Entry known as beta.sam.gov and will establish a firm bid due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
The INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via beta.SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check beta.sam.gov frequently for any changes to the interested vendors list and notice.
Update #1 ·
TITLE OF PROJECT: Tule River Road Realignment Project
(Reference Sources Sought No.: W9123820S2243)
The Government anticipates issuing an Invitation for Bids (IFB) with the intent of awarding a single Firm-Fixed Price construction contract for the Tule River Road Realignment Project.
Project Description: This requirement is for the road relocation of an existing road, located at Success Dam and Reservoir (now Schafer Dam) in Tulare County, California. This road is used for public access to the Rock Hill Recreation site, when the reservoir is not at full capacity. The road is currently in the middle of the Tule River Spillway. The new road will be along the right abutment cut above the new gross pool. This project will include: the right abutment spillway cut, road relocation and temporary stockpiles of materials.
In accordance with DFARS 236.204(ii), the estimated magnitude of construction is expected to be between $25M - $100M. This prospective contract action will be conducted using the NAICS Code 237310 (Highway, Street and Bridge Construction) with a size standard of $39.5M, and the Federal Supply Code is Y1LB (Construction of Highways, Roads, Streets, Bridges, and Railways).
The solicitation will proceed as a 100% total small business set-aside and is estimated to be issued on or about 02 March 2020 with bids due tentatively on 01 April 2020. The IFB will be issued on the Government Point of Entry known as beta.sam.gov and will establish a firm bid due date/time.
If applicable, the site visit date, time and location will be identified in the solicitation.
BE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED OR REVISED AT ANY TIME DURING THE PRE-SOLICITATION, SOLICITATION, SELECTION, EVALUATION, NEGOTIATION AND/OR FINAL AWARD PROCESS.
The INTERESTED VENDORS LISTS (plan-holder's/bidder's list) is available via beta.SAM.gov. Contractors are responsible for self-identifying as interested vendors and viewing other interested vendors. Contractors should check beta.sam.gov frequently for any changes to the interested vendors list and notice.
Attachments
| File | Type | Posted |
|---|---|---|
| Road Relocation Maps.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Tule River Phase I | Award Notice | |
| Tule River Phase I | Solicitation | |
| Tule River Phase I | Pre-Solicitation | |
| Tule River Phase I | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity