Riley Pass Fuller Pass Road Reconditioning
Awarded Award Notice Posted
- Solicitation number
- AG-0355-S-17-0003
- Agency
- Region 1 - Northern Region Forest Service, Department of Agriculture
- Awarded
- to Roth Trucking Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG-0355-C-17-0005 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
Added: Apr 18, 2017 1:08 pm
Modified: Apr 19, 2017 11:52 amTrack Changes
The Northern Region of the Forest Service anticipates awarding a contract for reconditioning and resurfacing on Fuller Pass Road #3114. Work on the road shall include: Road reconditioning, clearing, reestablishing road drainage, culvert cleaning, culvert replacement and surfacing the road with crushed aggregate.
The project is located on the Sioux Ranger District, Custer Gallatin National Forest. The Site is approximately 100 miles north of Belle Fourche, South Dakota, 25 miles north of Buffalo, South Dakota, and 30 miles south of Bowman, North Dakota.
The Site can be accessed by turning west off of U.S. Highway 85 onto the Cox Road (County Road #733) and then turning South off the Cox Road onto Fuller Pass Road #3114.
Government estimates the magnitude of the project to be between $250,000 and $500,000.
Roads in the project area may contain Erionite, a zeolite mineral that, in its fibrous form, may have properties similar to asbestos. Erionite may pose health risks to those who breathe in the fibers. The Contractor shall take measures to mitigate the risk of airborne exposure from sediment and Erionite. All aggregate imported to the site shall be tested by the Contractor and shall be non-detect for Erionite by the Polar Light Microscopy (PLM) method. Contractor shall submit test results showing pit location, name, and lab test results before any aggregate is imported to the site.
The requirement for HAZWOPER certifications has been removed from this project. Contractors do NOT need HAZWOPER training/certification to work on this project.
Update #1 ·
Added: Apr 18, 2017 1:08 pm
The Northern Region of the Forest Service anticipates awarding a contract for reconditioning and resurfacing on Fuller Pass Road #3114. Work on the road shall include: Road reconditioning, clearing, reestablishing road drainage, culvert cleaning, culvert replacement and surfacing the road with crushed aggregate.
The project is located on the Sioux Ranger District, Custer Gallatin National Forest. The Site is approximately 100 miles north of Belle Fourche, South Dakota, 25 miles north of Buffalo, South Dakota, and 30 miles south of Bowman, North Dakota.
The Site can be accessed by turning west off of U.S. Highway 85 onto the Cox Road (County Road #733) and then turning South off the Cox Road onto Fuller Pass Road #3114.
Government estimates the magnitude of the project to be between $250,000 and $500,000.
The Contractor shall provide written documentation that the onsite project manager and all other employees engaged in the work has received the Occupational Safety and Health Administration 40 hour Hazardous Waste Operations and Emergency Response (HAZWOPER) Training required under 29 CFR 1910.120. The Contractor must provide copies of certifications, including annual refresher training certifications, prior to issuance of notice to proceed which is estimated to be issued 14 days after award. The Contractor shall utilize only onsite personnel that have completed HAZWOPER training when work is being performed. Vendors delivering supplies to the site are not required to complete HAZWOPER training.
Roads in the project area may contain Erionite, a zeolite mineral that, in its fibrous form, may have properties similar to asbestos. Erionite may pose health risks to those who breathe in the fibers. The Contractor shall take measures to mitigate the risk of airborne exposure from sediment and Erionite. All aggregate imported to the site shall be tested by the Contractor and shall be non-detect for Erionite by the Polar Light Microscopy (PLM) method. Contractor shall submit test results showing pit location, name, and lab test results before any aggregate is imported to the site.
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment_1-AG0355S170003.pdf | ||
| Prebid_RosterAG0355S170003.pdf | ||
| Fuller_Pass_Q_and_A.pdf | ||
| AttachmentsAG0355S170003.pdf | ||
| CompleteSolicitationAG0355S170003.pdf | ||
| Contract_Drawings.pdf | ||
| ShortSolicitationAG0355S170003.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Riley Pass Fuller Pass Road Reconditioning | Award Notice | |
| Sources Sought - Road Work | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity