RFP for PNNLMicrobial Molecular Phenotyping Capability (M2PC) Facility Design/Build Construction
Closed Solicitation Posted
- Solicitation number
- RFP856782
- Agency
-
Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Richland, Washington 99352, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Energy is seeking a design/build construction contract for the Microbial Molecular Phenotyping Capability (M2PC) Facility located in Richland, Washington. This solicitation, identified as RFP 856782, requires a comprehensive design and construction approach for a specialized scientific facility. The project involves creating a facility with specific requirements for an Automation Lab, including advanced smoke detection systems for high-value equipment protection. Two amendments have been issued to the original RFP, with the most recent (Amendment 2) clarifying proposal submission guidelines, specifically noting that tabs, bonding letters, and cover sheets do not count against page limits. The original solicitation was posted on December 11, 2024, with proposals due on January 17, 2025, giving potential contractors approximately five weeks to prepare and submit their comprehensive proposals.
The contract falls under the NAICS category 236220 for Commercial and Institutional Building Construction and PSC category C1DB for Architect and Engineering Construction of Laboratories and Clinics. There is no specific set-aside designation for this opportunity, indicating it is open to all qualified contractors. The project is being managed by Battelle and will be performed at the Pacific Northwest National Laboratory (PNNL) in Richland, WA. While specific budget details are not provided in the available documents, the complexity of the facility suggests a significant investment in specialized scientific infrastructure. The design/build approach implies that the winning contractor will be responsible for both the detailed design and physical construction of the M2PC facility, requiring a comprehensive and integrated approach to the project's execution.
Notice text
Design/Build Construction of the M2PC Facility
Files
| File | Type | Posted |
|---|---|---|
| RFP 856782 - Amendment 2.pdf | ||
| RFP 856782 - Amendment 1.pdf | ||
| PNNL RFP 856782 - M2PC Design-Build Construction_.pdf |