This is Amendment No. 1 to RFP 856782 for the Microbial Molecular Phenotyping Capability (M2PC) Facility Design/Build Construction project, issued December 30, 2024 by the Department of Energy. The amendment adds a clarification from Battelle regarding DOE requirements for loss prevention of high-value equipment, specifically mandating smoke detection systems for early warning and fire response in the Automation Lab.

The amendment modifies sections 5.10.8, 5.14.1, and the Automation Lab room data sheet of the performance specification to include these new requirements. The RFP was originally issued on December 11, 2024, with proposals due January 17, 2024. Offerors must acknowledge receipt of this amendment with their proposal submission or risk rejection. All other original RFP requirements remain unchanged.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 856782

December 30, 2024

RFP 856782: AMENDMENT No. 1 Amendments/Changes/Clarification

Project: Microbial Molecular Phenotyping Capability (M2PC) Facility

RFP ISSUE DATE: December 11, 2024 CLOSING DATE: January 17, 2024

RFP No. 856782 is hereby modified and clarified with the following:

Battelle Clarification: In order to meet DOE requirements for loss prevention for high value equipment, the inclusion of smoke detection for early warning and response for a fire condition is required in the Automation Lab. The attached pdf includes the changes in associated pages of the performance specification. In summary, requirements statements were added to 5.10.8, 5.14.1, and the Automation Lab room data sheet.

End of Amendment 1

The above stated clarifications are the only changes being made at this time.

Failure to acknowledge receipt of this addendum with submittal of your proposal could be cause to reject your offer. All other requirements of the RFP remain as originally stated.

Thank you, Garrett V Hyatt Senior Contracting Professional cc: File, Bidders List